Forwards Seismic Qualification of LACBWR Overhead Water Storage Tank for SEP, Seismic & Stress Analysis of HPCS Suction Line Piping Sys for LACBWR & Seismic & Stress Analysis of HPCS Suction Line Piping Sys for Lacbwr
ML20126L067
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 06/03/1985
From: Linder F
DAIRYLAND POWER COOPERATIVE
To: Zwolinski J
Office of Nuclear Reactor Regulation
Shared Package
ML20126L071 List:
References
RTR-NUREG-0827, RTR-NUREG-827, TASK-03-06, TASK-3-6, TASK-RR LAC-10933, NUDOCS 8506190408
Download: ML20126L067 (2)


Text

f D DA/RYLAND h [k COOPE/.AT/VE P.O BOX 817

  • 2615 EAST AV SOUTH
  • LA CROSSE. WISCONSIN 54601 (608) 788 4 000 June 3, 1985 In reply, please refer to LAC-10933 DOCKET NO. 50-409 Director of Nuclear Reactor Regulation Divisior. of Operating Reactors Attn: Mr. John Zwolinski, Chief Operating Reactors Branch #5 U. S. Nuclear Regulatory Commission Washington, DC 20555

SUBJECT:

DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBWR)

PROVISIONAL OPERATING LICENSE NO. DPR-45 INTEGRATED PLANT SAFETY ASSESSMENT SYSTEMATIC EVALUATION PROGRAM NUREG-0827 FULL TERM LICENSE COM'4ITMENTS

REFERENCES:

(1) DPC Letter, Linder (DPC) to Paulson (NRC), LAC-10172 dated September 27, 1984.

(2) NRC Memoradum, T. Cheng (NRC) to W. Russell (NRC),

" Summary of July 7, 1983 Meeting - SEP Topic III-6,

" Seismic Design Consideration" - La Crosse Boiling Water Reactor", dated August 10, 1983.

ENCLOSURES: (1) " Seismic and Stress Analysis of High Pressure Core Spray Suction Line Piping System for LACBWR" Structural Mechanics Associates, Report No. SMA-CT 30001.01R01, February 1985.

(2) " Seismic and Stress Analysis of High Pressure Core Spray Discharge Line Piping System for LACBWR",

Structural Mechanics Associates, Report No. SMA-CT 30001.02R01, February 1985.

l (3) " Seismic Qualification of the LACBWR Overhead Water Storage Tank for the Systematic Evaluation Program, Impell Corporation, Report No. 09-1240-0024 Rev. O, April 1985.

Dear Mr. Zwolinski:

As part of the Systematic Evaluation Program, Dairyland Power Cooperative conducted a review of the seismic stability of the high pressure core spray (HPCS) piping system and the containment building overhead storage tank (OHST).

8506190408 850603 WPl.16.2 050 9

_ a

ew -.

Mr. Jchn Zw211nski, Chisf Juna 3, 1985 Op2 rating Rtacters Branch #5 LAC-10933 The seismic analysis of the HPCS piping system was submitted as part of Reference No. 1. Since that time, some pipe model discrepancies have been discovered. The HPCS piping system has been re-analyzed to incorporate these piping discrepancies. Enclosures No. 1 and 2 contain the revised HPCS suction and discharge piping system seismic analysis. The existing HPCS piping system remains capable of withstanding the SSE.

To comply with the commitments made in Reference No. 2, the OHST has been seismically analyzed. Enclosure No. 3 contains the summary of the OHST seismic analysis. This analysis concludes that the OHST is capable of withstanding the SSE.

If you have any further questions regarding these topics, feel free to contact us. (

Sincerely, DAIRYLAND POWER COOPERATIVE IN'$$$$ S& Y Frank Linder, General Manager

/

FL:GRL:sks ,

Enclosures cc: Mr. James G. Keppler, Region III NRC Resident Inspector Richard Dudley, LACBWR. Project Manager WPl.16.2