JUN 0 41985
Docket No. 50-29
Yankee Atomic Electric Company
ATTN: Mr. L. H. Heider
Vice President Of Operations
1671 Worcester Road
Framingham, Massachusetts 01701
Gentlemen:
Subject:
Inspection No. 50-29/85-07
This transmits the March 21 - April 26, 1985, resident inspection findings by
Mr. H. Eichenholz at the Yankee Nuclear Power Station, Rowe, Massachusetts. Those
findings were based on observation of activities, interviews, independent measure-
ments, and document review, and have been discussed with Mr. N. St. Laurent of your
staff.
Based upon the results of this inspection, it appears that one of your activities
concerning periodic surveillance of meteorological instrumentation (Enclosure 2,
Section 6) was not conducted in full compliance with NRC requirements, as set forth
in the Notice of Violation, enclosed herewith as Appendix A.
This violation has
been categorized by severity level in accordance with the revised NRC Enforcement
Policy (10 CFR 2, Appendix C) published in the Federal Register Notice (49 FR 8583)
dated March 8, 1984. You are required to respond to this letter and in preparing
your response, you should follow the instructions in Appendix A.
In addition, this report includes observations of licensee performance in response
to occurrences involving neration of the Public Notification System, an incomplete
safety evaluation for a plant modification, continued implementation of a plant
housekeeping and appearance improvement program, and failure analysis review due
to repeated corrective maintenance on charging pumps.
These observations may be
used in the future to highlight possible trends in licensee performance as part
of the Systematic Assessment of Licensee Performance (SALP) process.
The responses directed by this letter and the accompanying Notice are not subject
)
to the clearance procedures of the Office of Management and Budget as required by
'
the Paperwork Reduction Act of 1980, PL 96-511.
Your cooperation with us is appeciated.
Sincerely,0raggy
g 'Ded
j,
'
-
Edward C. Wenzinger, Chief
Projects Branch No. 3
Division of Reactor Projects
85061
8 850604
A
K 05000029
j T-T/
e
pon
I
I
.
. .
.
.
.
.
,.-
,-
. . . . .-
,
Yankee Atomic Electric Company
2
JUN 0 41985
Enclosures:
1.
- . Appendix A, Notice of Violation
2.
NRC Region I Report Number 50-29/85-07-
cc w/encls:
N. N. St. Laurent, Plant Superintendent
J. E. Tribble, President
J. A. Kay, Senior Engineer - Licensing
.
Public Document Room (PDR)
Local Public. Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Massachusetts (2)
bec w/encls:
Region I Docket Room (with concurrences)
Senior Operations Officer (w/o enc 1)
DRP Section Chief
DRP Branch Chief
DRS Division Director
DRSS Division Director
'F1
PRP
P
R7
P
b<'igj;g
fichenholz/meo
isasser
en: nger
j
6 /sr
i stofor
i
0FFICIAL RECORD COPY