Forwards Insp Rept 50-029/85-07 on 850321-0426 & Notice of Violation
ML20126H883
Person / Time
Site: Yankee Rowe
Issue date: 06/04/1985
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Heider L
YANKEE ATOMIC ELECTRIC CO.
Shared Package
ML20126H885 List:
References
NUDOCS 8506100448
Download: ML20126H883 (2)


See also: IR 05000029/1985007

Text

,

..

,

,

JUN 0 41985

Docket No. 50-29

Yankee Atomic Electric Company

ATTN: Mr. L. H. Heider

Vice President Of Operations

1671 Worcester Road

Framingham, Massachusetts 01701

Gentlemen:

Subject:

Inspection No. 50-29/85-07

This transmits the March 21 - April 26, 1985, resident inspection findings by

Mr. H. Eichenholz at the Yankee Nuclear Power Station, Rowe, Massachusetts. Those

findings were based on observation of activities, interviews, independent measure-

ments, and document review, and have been discussed with Mr. N. St. Laurent of your

staff.

Based upon the results of this inspection, it appears that one of your activities

concerning periodic surveillance of meteorological instrumentation (Enclosure 2,

Section 6) was not conducted in full compliance with NRC requirements, as set forth

in the Notice of Violation, enclosed herewith as Appendix A.

This violation has

been categorized by severity level in accordance with the revised NRC Enforcement

Policy (10 CFR 2, Appendix C) published in the Federal Register Notice (49 FR 8583)

dated March 8, 1984. You are required to respond to this letter and in preparing

your response, you should follow the instructions in Appendix A.

In addition, this report includes observations of licensee performance in response

to occurrences involving neration of the Public Notification System, an incomplete

safety evaluation for a plant modification, continued implementation of a plant

housekeeping and appearance improvement program, and failure analysis review due

to repeated corrective maintenance on charging pumps.

These observations may be

used in the future to highlight possible trends in licensee performance as part

of the Systematic Assessment of Licensee Performance (SALP) process.

The responses directed by this letter and the accompanying Notice are not subject

)

to the clearance procedures of the Office of Management and Budget as required by

'

the Paperwork Reduction Act of 1980, PL 96-511.

Your cooperation with us is appeciated.

Sincerely,0raggy

g 'Ded

j,

'

-

Edward C. Wenzinger, Chief

Projects Branch No. 3

Division of Reactor Projects

85061

8 850604

PDR

A

K 05000029

j T-T/

e

pon

I

I

.

. .

.

.

.

.

,.-

,-

. . . . .-

,

Yankee Atomic Electric Company

2

JUN 0 41985

Enclosures:

1.

. Appendix A, Notice of Violation

2.

NRC Region I Report Number 50-29/85-07-

cc w/encls:

N. N. St. Laurent, Plant Superintendent

J. E. Tribble, President

J. A. Kay, Senior Engineer - Licensing

.

Public Document Room (PDR)

Local Public. Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Massachusetts (2)

bec w/encls:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o enc 1)

DRP Section Chief

DRP Branch Chief

DRS Division Director

DRSS Division Director

'F1

PRP

P

R7

P

b<'igj;g

fichenholz/meo

isasser

en: nger

j

6 /sr

i stofor

i

0FFICIAL RECORD COPY