pft R E C c.
'
8
/
'o
UNITED STATES
5 .3 ) ,Q)EJh 8
!
gg
NUCLEAR REGULATORY COMMISSION
1
REGION ll
okb
101 MARIETTA ST., N.W,. SUITE 3100
(o
[,
o$
ATLANTA, GEORGI A 30303
- ..,*
In Reply Refer To:
M 0 5196)
9
3
RII RUC
h/ SD~h
G
g
- i
v
Af/lg O
H,
Duke Power Company
-
ATTN:
W. O. Pa rker, Jr.
8,-
b,4
S yg/ As
k g*% %
Vice President, Steam Production
P. O. Box 2178
g
Charlotte, NC 28242
Gentlemen:
01
This refars to the inspection conducted by T.
J. Donat of this office on
November 1-30,
1980 of activities authorized by NitC Construction Permit No.
CFPR-33 for the McGuire facilitj, and to the discussion of our findings held
with "
D. ?!:Intosh at the cenclusien of the inspection
Areas examined durin; the inspection and out findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
celective e:-:aminations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no items of noncompliance were di.sclosed.
We have discussed with you the status of testing of the loose parts monitoring
system, and received from you a commitment to complete all testing of that
system prior to initial use of the reactor coolant pumps after fuel loading.
This commitment is discussed in detail in the enclosed inspection report.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations , a copy of this letter and the enclosed
inspection report will be placed in the NPC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure.
Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
-
the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
[ [. 9M
R.C.bwis, Acting Chief
Reactor Operations and Nuclear
Support Branch
l
Enclosure:
(See Page 2)
1
E1.03120 M )
_
_
.. ..
_
_.
- _ . - . . . . - . . _ . - _ . . _ _ _ - _ . .
. _ _ .
_
. . _ _
._._..__y_
- _ . -
. - . _ .
t
3. 8.0 5 1981
k
Duke Power Company
-2-
+
t
Enclosure:
Inspection Report No.
-
50-369/86-39
,
i
cc w/ encl:
[
l
.'t.
D. McIntosh, Plant B!anager'
l-
J. C. Rogers, Project Manager