ML20126E253

From kanterella
Jump to navigation Jump to search
Proposed TS 6.2.3 Re Composition & Educational Qualifications of Independent Safety Engineering Group
ML20126E253
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/22/1992
From:
GEORGIA POWER CO.
To:
Shared Package
ML20126E251 List:
References
NUDOCS 9212290075
Download: ML20126E253 (3)


Text

.

ENCIDSURE 3 VOGTLE ELECTRIC GENERATING PLANT PROPOSED CHANGES TO TECHNICAL SPECIFICNHON QUALIFICATION

f REQUIREMENTS OF TIIE INDEPENDENT SAFETY ENGINEERING GROUP INTERUCHONS FOR INCORPORATION The proposed changes to the Vogtle Unit 1 and Unit 2 Technical Specifications would be 1

incorporated as follows:

Remove Page Insert Ppge 6-5*-6-6 6-5* 6 1

L 1

l

  • Overleaf page contains no change l

f.

E3-1 L

j_

l 9212290075'921222 f

PDR ADOCK 050GO424 P

PDR

.: 1

ADMINISTRATIVE CON.20LS 6.2.3 INDEPENDENT SAFETY ENGINEERING GROUP (ISEG)

FUNCTION 6.2.3.1 The ISEG shall function to examine plant operating characteristics, NRC issuances, industry advisories, Licensee Event Reports, and other sources of plant design and operating experience information, which may indicate areas for improving plant safety.

The ISEG shall make detailed recommendations for revised procedures,-equipment modifications, maintenance activities, operations activities, or other means of improving plant safety to the Vice President-Nuclear.

INSERT ll 1

COMPOSITION

___/

6.2.3.2 The ISEG shall be composed of at least five, dedicated, full-time

- /W e T: 4 4

en9.eers.

Each shall have 4-bacM4m4-depee-4n-engineetsg-cr-- rskteh wient: and-et-4eatt4-years-peofessional leve+-expcrience in his-f4cid, at-4eett-1-yeemf--whieh-experic acc shat? - t,c i r, the -iwc-leer field.-

RESPONSIBILITIES 6.2.3.3 The ISEG shall be responsible for maintaining surveillance of plant activities to provide independent verification

  • that these activities are performed correctly and that human errors are reduced as much as practical.

RECORDS 6.2,3,4 Records of activities performed by the ISEG shall be prepared, main-tained, and forwarded each calendar month to the Vice President - Nuclear.

6.2.4 SHIFT TECHNICAL ADVISOR 6.2.4.1 The Shift Technical Advisor shall provide advisory technical support to the Shift Supervisor in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the plant.

The Shift Technical Advisor shall have a bachelor's degree or equivalent in a scientific or engineering discipline and shall have received specific training in the response and analysis of the plant for transients and accidents, and in plant design and layout, including the capabilities of instrumentation and controls in the control room.

i i

  • Not responsible for sign-off function.

\\

V0GTLE UNITS-- 1 & 2 6-6

,r l

4 INSERT 1 cither:

(1) A bachelor's degree in engineering or related science and at least 2 years professional level experience in his field, at least 1 year of which experience shall be in the nuclear field, or (2) At least 5 years of nuclear experience and hold or have held a Senior Reactor Operator's license, or (3) At least 10 years of professional level experience in his field, at least 5 years of which experience shall be in the nuclear field.

At least three of these positions shall meet (1),

__