MONTHYEARML20217J3341999-10-19019 October 1999 Forwards Request for Addl Info Re Sale of Portion of Land Part of Oyster Creek Nuclear Generating Station Site Including Portion of Exclusion Area ML20217G4111999-10-12012 October 1999 Informs of Changes to Big Rock Point Defueled Emergency Plan, That Meet Requirements of 10CFR50.54(q) & Can Be Made Without NRC Approval.Changes to Plan Are Listed ML20217E0181999-10-0606 October 1999 Provides Nj Dept of Environ Protection Comments on Oyster Creek Nuclear Generating Station TS Change Request 267 Re Clarifications to Several TS Sections ML20212L9051999-10-0404 October 1999 Forwards Environ Assessment & Finding of No Significant Impact Re 990511 Application for Amend,As Supplemented on 990603 & 0728.Proposed Amend Would Make Changes to TSs by Deleting Definition,Site Boundary & Use ML20217C2761999-09-30030 September 1999 Forwards Big Rock Point Plant Annual Rept of Facility Changes,Tests & Experiments,Iaw 10CFR50.59(b)(2).Rept Provides Summary of Changes to Facility Performed Since 981001.No Activities Classified as Tests or Experiments ML20217C5111999-09-30030 September 1999 Forwards Info Re Management & Funding of Irradiated Fuel Notification,Per 10CFR50.54(bb),in Response to NRC Telcon Rai.Revs to Original 990811 Submittal Are Indicated by Redline/Strikeout Method ML20212K7561999-09-30030 September 1999 Forwards Insp Rept 50-155/99-05 on 990731-0921,site Insp & 990929 Public Meeting.No Violations Noted 05000219/LER-1998-011, Forwards LER 98-011-02, Three Small Bore Pipe Lines Did Not Meet Design Bases for Siesmic & Thermal Allowables. Engineering Std Will Not Be Completed Until End of 4th Quarter of 1999 Due to Scheduling Conflicts1999-09-30030 September 1999 Forwards LER 98-011-02, Three Small Bore Pipe Lines Did Not Meet Design Bases for Siesmic & Thermal Allowables. Engineering Std Will Not Be Completed Until End of 4th Quarter of 1999 Due to Scheduling Conflicts ML20212J6721999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Oyster Creek Nuclear Generating Station on 990913.No Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20216J7591999-09-30030 September 1999 Informs NRC That Remediation Efforts for Software Sys Etude & Rem/Aacs/Cico Have Been Completed According to Schedule & Now Y2K Ready ML20216K1421999-09-29029 September 1999 Provides NRC with Name of Single Point of Contact for Purpose of Accessing Y2K Early Warning Sys,As Requested by NRC Info Notice 99-025 ML20217D1661999-09-27027 September 1999 Forwards Proprietary Completed NRC Forms 396 & 398,in Support of License Renewal Applications for Listed Individuals,Per 10CFR55.57.Encl Withheld ML20217B2531999-09-24024 September 1999 Informs That on 980903,Region I Field Ofc of NRC Ofc of Investigations Initiated Investigation to Determine Whether Crane Operator Qualification/Training Records Had Been Falsified at Oyster Creek Nuclear Generating Station ML20212E1971999-09-16016 September 1999 Forwards Rev 11 of Gpu Nuclear Operational QAP, Reflecting Organizational Change in Which Functions & Responsibilities of Nuclear Safety & Technical Support Div Were Assigned to Other Divisions ML20212A7921999-09-13013 September 1999 Forwards Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Issued on 950817 to Plant ML20212B5571999-09-10010 September 1999 Forwards Rev 11 to Oyster Creek Emergency Dose Calculation Manual, IAW 10CFR50,App E,Section V ML20211N2941999-09-0303 September 1999 Responds to NRC 990802 Telcon Request for Environ Impact Assessment of TS Change Request 251 Concerning Movement of Loads Up to 45 Tons with RB Crane During Power Operations ML20211J9831999-09-0202 September 1999 Discusses 990804 Telcon Re Sale of Portion of Oyster Creek Nuclear Generating Station Land.Requests Info Re Location of All Areas within Property to Be Released Where Licensed Radioactive Matl Present & Disposition of Radioactive Matl ML20211J6771999-08-30030 August 1999 Submits Response to NRC 990802 Telcon Request for Gpu to Provide Environ Impact Assessment for Tscr 251 ML20211G1011999-08-25025 August 1999 Confirms Discussions & Agreement to Have Mgt Meeting in Region III Office on 990929.Purpose of Meeting to Discuss Decommissioning Activities,Priorities,Challenges & Successes & to Preview Plans & Schedules for Next Year ML20211K2391999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Nj ML20211C0161999-08-19019 August 1999 Advises That Info Submitted by Ltr,Dtd 990618, Licensing Rept for Storage Capacity Expansion of Oyster Creek Spent Fuel Pool, Holtec Rept HI-981983,rev 4,will Be Withheld from Public Disclosure,Per 10CFR2.790 ML20211B9011999-08-18018 August 1999 Forwards Rev 0 to EPIP 1820-IMP-1720.01, Emergency Public Info Implementing Procedure ML20210U4341999-08-17017 August 1999 Responds to to Chairman Dicus of NRC on Behalf of Fm Massari Concern About Oyster Creek Nuclear Generating Station Not Yet Being Fully Y2K Compliant ML20210V0561999-08-17017 August 1999 Advises of Plan to Stop Using Ofc Complex at Plant,Which Consumers Energy Co Had Provided for NRC Resident Inspectors Under 10CFR50.70(b)(1) ML20211D5661999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d).Attachments 1 & 2 Summarize Test Results at Palisades Plant,Big Rock Point Plant & Corporate Ofc ML20210S6961999-08-12012 August 1999 Forwards Insp Rept 50-155/99-04 on 990609-0730.No Violations Noted.No Safety Issues or Enforcement Items Were Identified During Insp ML20210Q7331999-08-12012 August 1999 Responds to Re TS Change Request (TSCR)264 from Oyster Creek Nuclear Generating Station.Questions Re Proposed Sale of Property within Site Boundary & Exclusion Area ML20210S6291999-08-11011 August 1999 Forwards Notification to NRC for Review & Approval of Program Intending to Manage & Provide Funding for Mgt of All Irradiated Fuel at Big Rock Point Until Title of Fuel Is Transferred to Secretary of Energy for Disposal ML20210L6311999-08-0606 August 1999 Discusses Licensee Response to GL 92-01,Rev1,Suppl 1, Rv Structural Integrity, for Plant.Staff Has Revised Info in Rv Integrity Database & Releasing as Rvid Version 2 ML20210L0321999-08-0303 August 1999 Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety & Documents Listed in App B Being Released in Part (Ref FOIA Exemption 6) ML20210H2701999-07-28028 July 1999 Informs That Big Rock Point Commits to Listed Actions with Regard to 990511 Amend Request to Delete Definition of Site Boundary & Remove Site Map,Based on Discussion with NRC on 990728 ML20210D2801999-07-22022 July 1999 Submits Response to Administrative Ltr 99-02 Operating Reactor Licensing Action Estimates. Estimate of Licensing Actions Projected for Fy 2000 Encl.No Projection Provided for Fy 2001 ML20209H5001999-07-14014 July 1999 Forwards Revised TS Pages 3.1-15 & 3.1-17 Which Include Ref to Note (Aa) & Approved Wording of Note H of Table 3.1.1, Respectively ML20210U4411999-07-12012 July 1999 Forwards Article from Asbury Park Press of 990708 Faxed to Legislative Officer by Mutual Constitute Fm Massari Indicating That Oyster Creek Nuclear Generating State Not Fully Y2K Compliant ML20209G1451999-07-0909 July 1999 Forwards Rev 1 to 2000-PLN-1300.01, Oyster Creek Generating Station Emergency Plan. Attachment 1 Contains Brief Summary of Changes,Which Became Effective on 990702 ML20209E0821999-07-0707 July 1999 Forwards TS Change Request 269 for License DPR-16,changing Component Surveillance Frequencies to Indicate Frequency of Once Per Three Months ML20209D6951999-07-0707 July 1999 Ack Receipt of Which Requested That NRC Reconsider Decision to Move NRC Resident Inspector from Big Rock Point Plant.Determined Decision to Be Correct One ML20209B7501999-07-0101 July 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Generic Ltr 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Licensee Y2K Readiness Disclosure for Ocngs,Encl ML20210L0491999-06-30030 June 1999 Partially Deleted Request for FOIA Documents Re Source of High Alarms Generated by Radiation Effluent Detector or Detectors in Discharge Canal at Big Rock Point on 980314,15 & 25.Partially Deleted Info Encl ML20196G1361999-06-23023 June 1999 Provides Status of Corrective Actions Proposed in in Response to Insp Rept 50-219/98-80 & Revised Schedule for Completion of Actions Which Are Not Yet Complete ML20196E6421999-06-22022 June 1999 Forwards Revised Pages of TS Change Request 261,dtd 990618. Replacement Requested Due to Several Dates Being Omitted on Certain Pages ML20196E1601999-06-21021 June 1999 Forwards Insp Rept 50-155/99-03 on 990416-0608.No Violations Noted.Overall,Reactor Decommissioning Activities Performed Satisfactorily ML20209D7011999-06-21021 June 1999 Requests That NRC Reconsider Decision to Move Resident Inspector from Big Rock Point NPP ML20195G6631999-06-0707 June 1999 Discusses 981204 Intiation to Investigate Whether Contract Valve Technician Was Discriminated Against for Raising Concern Re Use of Untrained/Unqualified Workers Performing Valve Repairs.Technician Was Not Discriminated Against ML20195G6541999-06-0707 June 1999 Discusses 981204 Initiation to Investigate Whether Contract Valve Technician,Was Discriminated Against for Raising Concern Re Use of Untrained/Unqualified Workers Performing Valve Repairs.Technician Was Not Discriminated Against ML20209B0561999-06-0404 June 1999 Informs That NRR Has Reorganized,Effective 990328.Forwards Organizational Chart ML20195D0551999-06-0303 June 1999 Forwards TS Change Request 226 to License DPR-16,permitting Operation with Three Recirculation Loops.Certificate of Svc & Tss,Encl ML20195D0371999-06-0303 June 1999 Forwards Revised Defueled Ts,Per 990511 Util Request.Page Format in Attachments 1 & 2 of Submittal Do Not Agree with Current Facility Defueled TS Format.Replacement of Encl Pages Requested ML20207F6631999-06-0303 June 1999 Forwards Rev 33 of Big Rock Point Plant Security Plan,Which Incorporates Exemption from Certain Requirements of 10CFR73 That Reflect Permanent Shutdown & Defueled Condition of Facility.Encl Withheld IAW 10CFR73.21(c) 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217G4111999-10-12012 October 1999 Informs of Changes to Big Rock Point Defueled Emergency Plan, That Meet Requirements of 10CFR50.54(q) & Can Be Made Without NRC Approval.Changes to Plan Are Listed ML20217E0181999-10-0606 October 1999 Provides Nj Dept of Environ Protection Comments on Oyster Creek Nuclear Generating Station TS Change Request 267 Re Clarifications to Several TS Sections ML20216J7591999-09-30030 September 1999 Informs NRC That Remediation Efforts for Software Sys Etude & Rem/Aacs/Cico Have Been Completed According to Schedule & Now Y2K Ready 05000219/LER-1998-011, Forwards LER 98-011-02, Three Small Bore Pipe Lines Did Not Meet Design Bases for Siesmic & Thermal Allowables. Engineering Std Will Not Be Completed Until End of 4th Quarter of 1999 Due to Scheduling Conflicts1999-09-30030 September 1999 Forwards LER 98-011-02, Three Small Bore Pipe Lines Did Not Meet Design Bases for Siesmic & Thermal Allowables. Engineering Std Will Not Be Completed Until End of 4th Quarter of 1999 Due to Scheduling Conflicts ML20217C5111999-09-30030 September 1999 Forwards Info Re Management & Funding of Irradiated Fuel Notification,Per 10CFR50.54(bb),in Response to NRC Telcon Rai.Revs to Original 990811 Submittal Are Indicated by Redline/Strikeout Method ML20217C2761999-09-30030 September 1999 Forwards Big Rock Point Plant Annual Rept of Facility Changes,Tests & Experiments,Iaw 10CFR50.59(b)(2).Rept Provides Summary of Changes to Facility Performed Since 981001.No Activities Classified as Tests or Experiments ML20216K1421999-09-29029 September 1999 Provides NRC with Name of Single Point of Contact for Purpose of Accessing Y2K Early Warning Sys,As Requested by NRC Info Notice 99-025 ML20217D1661999-09-27027 September 1999 Forwards Proprietary Completed NRC Forms 396 & 398,in Support of License Renewal Applications for Listed Individuals,Per 10CFR55.57.Encl Withheld ML20212E1971999-09-16016 September 1999 Forwards Rev 11 of Gpu Nuclear Operational QAP, Reflecting Organizational Change in Which Functions & Responsibilities of Nuclear Safety & Technical Support Div Were Assigned to Other Divisions ML20212B5571999-09-10010 September 1999 Forwards Rev 11 to Oyster Creek Emergency Dose Calculation Manual, IAW 10CFR50,App E,Section V ML20211N2941999-09-0303 September 1999 Responds to NRC 990802 Telcon Request for Environ Impact Assessment of TS Change Request 251 Concerning Movement of Loads Up to 45 Tons with RB Crane During Power Operations ML20211J6771999-08-30030 August 1999 Submits Response to NRC 990802 Telcon Request for Gpu to Provide Environ Impact Assessment for Tscr 251 ML20211K2391999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Nj ML20211B9011999-08-18018 August 1999 Forwards Rev 0 to EPIP 1820-IMP-1720.01, Emergency Public Info Implementing Procedure ML20211D5661999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d).Attachments 1 & 2 Summarize Test Results at Palisades Plant,Big Rock Point Plant & Corporate Ofc ML20210S6291999-08-11011 August 1999 Forwards Notification to NRC for Review & Approval of Program Intending to Manage & Provide Funding for Mgt of All Irradiated Fuel at Big Rock Point Until Title of Fuel Is Transferred to Secretary of Energy for Disposal ML20210H2701999-07-28028 July 1999 Informs That Big Rock Point Commits to Listed Actions with Regard to 990511 Amend Request to Delete Definition of Site Boundary & Remove Site Map,Based on Discussion with NRC on 990728 ML20210D2801999-07-22022 July 1999 Submits Response to Administrative Ltr 99-02 Operating Reactor Licensing Action Estimates. Estimate of Licensing Actions Projected for Fy 2000 Encl.No Projection Provided for Fy 2001 ML20209H5001999-07-14014 July 1999 Forwards Revised TS Pages 3.1-15 & 3.1-17 Which Include Ref to Note (Aa) & Approved Wording of Note H of Table 3.1.1, Respectively ML20210U4411999-07-12012 July 1999 Forwards Article from Asbury Park Press of 990708 Faxed to Legislative Officer by Mutual Constitute Fm Massari Indicating That Oyster Creek Nuclear Generating State Not Fully Y2K Compliant ML20209G1451999-07-0909 July 1999 Forwards Rev 1 to 2000-PLN-1300.01, Oyster Creek Generating Station Emergency Plan. Attachment 1 Contains Brief Summary of Changes,Which Became Effective on 990702 ML20209E0821999-07-0707 July 1999 Forwards TS Change Request 269 for License DPR-16,changing Component Surveillance Frequencies to Indicate Frequency of Once Per Three Months ML20209B7501999-07-0101 July 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Generic Ltr 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Licensee Y2K Readiness Disclosure for Ocngs,Encl ML20210L0491999-06-30030 June 1999 Partially Deleted Request for FOIA Documents Re Source of High Alarms Generated by Radiation Effluent Detector or Detectors in Discharge Canal at Big Rock Point on 980314,15 & 25.Partially Deleted Info Encl ML20196G1361999-06-23023 June 1999 Provides Status of Corrective Actions Proposed in in Response to Insp Rept 50-219/98-80 & Revised Schedule for Completion of Actions Which Are Not Yet Complete ML20196E6421999-06-22022 June 1999 Forwards Revised Pages of TS Change Request 261,dtd 990618. Replacement Requested Due to Several Dates Being Omitted on Certain Pages ML20209D7011999-06-21021 June 1999 Requests That NRC Reconsider Decision to Move Resident Inspector from Big Rock Point NPP ML20195D0551999-06-0303 June 1999 Forwards TS Change Request 226 to License DPR-16,permitting Operation with Three Recirculation Loops.Certificate of Svc & Tss,Encl ML20195D0371999-06-0303 June 1999 Forwards Revised Defueled Ts,Per 990511 Util Request.Page Format in Attachments 1 & 2 of Submittal Do Not Agree with Current Facility Defueled TS Format.Replacement of Encl Pages Requested ML20207F6631999-06-0303 June 1999 Forwards Rev 33 of Big Rock Point Plant Security Plan,Which Incorporates Exemption from Certain Requirements of 10CFR73 That Reflect Permanent Shutdown & Defueled Condition of Facility.Encl Withheld IAW 10CFR73.21(c) ML20195C5511999-05-25025 May 1999 Forwards Book of Controlled Drawings Currently Ref But Not Contained in Plant Ufsar.Drawings Were Current at Time of Submittal ML20206N7711999-05-11011 May 1999 Forwards Rev 0 to Oyster Creek Emergency Plan, IAW 10CFR50.47(b) & 10CFR50.54(q).Changes Became Effective on 990413 ML20206P4501999-05-11011 May 1999 Requests Transcript of 990413 Public Meeting in Rockville,Md Re Decommissioning of Big Rock ML20206J2411999-04-30030 April 1999 Submits Corrected Copy of Ltr Forwarding 1998 Consumers Energy Co Annual Rept. Ltr Contains Corrected Docket & License Number for Big Rock Point.With One Oversize Encl ML20206E7821999-04-29029 April 1999 Forwards Annual Radioactive Environ Rept for 1998 for Big Rock Point Plant. Rept Includes Summaries,Interpretations & Statistical Evaluation of Results of Radiological Environ Monitoring Program ML20206H9441999-04-28028 April 1999 Forwards Application for Amend to License DPR-16,requesting Approval to Handle Loads Up to & Including 45 Tons Using Reactor Bldg Crane During Power Operations,Per NRC Bulletin 96-002 ML20206D3801999-04-26026 April 1999 Forwards Rev 11 to UFSAR, & Rev 10 to Fire Hazards Analysis Rept, for Oyster Creek Nuclear Generating Station, Per 10CFR50.712(e) ML20206B6991999-04-26026 April 1999 Forwards Copy of Rev 11 to UFSAR & Rev 10 to Oyster Creek Fire Hazards Analysis Rept. Without Fire Hazard Analysis 05000155/LER-1992-008, Advises That Util Terminated Corrective Actions Re LER 92-008 of Loss of Station Power 125 Volt Dc sys.SOP-28 Has Been Deleted in Entirety.Commitments No Longer Applicable1999-04-26026 April 1999 Advises That Util Terminated Corrective Actions Re LER 92-008 of Loss of Station Power 125 Volt Dc sys.SOP-28 Has Been Deleted in Entirety.Commitments No Longer Applicable ML20206C8261999-04-22022 April 1999 Submits Financial Info IAW Requirements of 10CFR50.71(b) & 10CFR140.21 ML20206A9931999-04-22022 April 1999 Forwards Number of Personnel & Person Rems by Work & Job Function Rept for Period Jan-Dec 1998. Included in Rept Is Listing of Number of Station,Util & Contractor Personnel as Well as Diskette Reporting 1998 Occupational Radiation ML20205P8411999-04-15015 April 1999 Forwards TS Change Request 267 to License DPR-16,modifying Items in Sections 2 & 3 of Ts,Expanding Two Definitions in Section 1 & Modifying Bases Statements in Sections 2,3 & 4. Certificate of Svc Encl ML20205P9401999-04-12012 April 1999 Informs NRC That Gpu Nuclear Is Modifying Oyster Creek FSAR to Reflect Temp Gradient of 60 F & to Correct Historical Record 05000219/LER-1998-015, Forwards LER 98-015-01,as Original Submittal on 981028 Inadvertently Indicated That Suppl Would Be Submitted.Suppl Should Not Have Been Required as Only Change Is on Cover Page1999-04-0505 April 1999 Forwards LER 98-015-01,as Original Submittal on 981028 Inadvertently Indicated That Suppl Would Be Submitted.Suppl Should Not Have Been Required as Only Change Is on Cover Page ML20205H1081999-03-31031 March 1999 Forwards Current Funding Status for Decommissioning Funds Established for OCNPP,TMI-1,TMI-2 & SNEC ML20196K7881999-03-29029 March 1999 Forwards Rept on Certification of Financial Assurance for Decommissioning for Big Rock Plant,Per 10CFR50.75(f)(1).Copy of Trust Agreement Between Consumers Energy & State Bank & Trust Co,Included in Rept ML20205F0611999-03-25025 March 1999 Submits Info on Sources & Levels of Property Insurance Coverage Maintained & Currently in Effect for Oyster Creek Nuclear Generating Station,Iaw 10CFR50.54(w)(3) ML20205E1171999-03-24024 March 1999 Forwards Rev 39 to Oyster Creek Security Plan & Summary of Changes,Iaw 10CFR50.54(p).Rev Withheld ML20204E5861999-03-16016 March 1999 Submits Current Limits of Property Insurance Maintained at Consumers Energy Co Operating Nuclear Power Plants ML20207K2471999-02-25025 February 1999 Forwards Fitness for Duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Ny 1999-09-30
[Table view] Category:TELEGRAMS-CORRESPONDENCE
MONTHYEARML20126E3601971-02-0909 February 1971 Submits Addl Info Re Proposed Change 27.Discusses Safety of Auxiliary Neutron Sources ML20126E3661971-01-19019 January 1971 Responds to Request for Addl Info Re Tech Specs Changes 21, 22 & 24.Discusses Reactivity of gadolina-bearing Fuel & Potential Use of New Fuel Storage Racks ML20084H1931970-07-0202 July 1970 Confirms Telcon on 700702 Re Trip Setting for High Flow in Condensate Line in Differential Pressure of 27 Inches & Establishment of Procedure for Personnel to Manually Actuate Condenser Sys ML20084H1891970-07-0202 July 1970 Informs That Trip Setting Re Set to Differential Pressure of 27 Inches & Personnel Alerted to Manually Actuate Condenser Sys in Event of High Flow in Line ML20101U6691968-07-0505 July 1968 Responds to Re Release of Two Remaining Stub Tubes for Repair.Unable to Determine How Meaningful Info Could Be Obtained from Surveillance Program to Expose Clad & Unclad Samples of Stub Tube Matl ML20084C1821968-06-25025 June 1968 Responds to NRC Re Release of Two Remaining Stub Tubes for Repair.Insufficient Technical Justification Exists to Phase Out Tube Sample Surveillance Program.Stub Tube Repair Operation Proceeding W/O Sample Surveillance Program ML20126E2181968-06-13013 June 1968 Advises That New Peak Clad Temp Calculation Results in 2,200 F.Addl Info to Be Submitted ML20126E3421966-09-26026 September 1966 Submits Addl Info Re Proposed Change 10 to Tech Specs Per 660729 Request,Including Time Constant Vs Fuel Energy Content Relationship Used in Previous Calculations ML20126E3461966-08-16016 August 1966 Submits Addl Info in Support of Proposed Change 10 to Tech Specs of License DPR-6,per 660729 Telcon ML20126E2851966-05-0202 May 1966 Submits Addl Info in Response to Questions Re Details of Accident Analysis Which Supports Request for Change 8 to Tech Specs.Substitution of zircaloy-clad Fuel for Stainless steel-clad Fuel Does Not Present Hazard ML20126E3271965-03-0202 March 1965 Submits Addl Info in Support of Request for Change to Tech Specs Per ML20126E3301964-09-28028 September 1964 Submits Info Re Operating Difficulties at Facility Concerning Failure in Main Steam Bypass Valve Control Sys. Intends to Reload Facility to Normal Core Size During Outage & Resume Normal Operation ML20126E2161964-07-15015 July 1964 Submits Info in Response to 640326 Request Re Changes to Tech Specs Change Requests 47 & 49 & Supplements Info Submitted on 640521.Provides Outline of Physics Tests to Be Run on 44-bundle Core ML20126E2321964-07-13013 July 1964 Submits Supplemental Info to 640326 Proposed Changes 3,25, 14,15,20 & 32 Re Calibr of Incore Monitoring Sys ML20126E2061964-05-28028 May 1964 Requests That Oak Ridge Operations Ofc Be Authorized to Provide GE 173.90 Kg of U-235 by 640612 to Meet Schedule for Delivery of 35 Fuel Bundles to Facility ML20126E2011964-02-24024 February 1964 Submits Info Re Proposed Sections C & E of Containment Testing Procedure 1971-02-09
[Table view] Category:VENDOR/MANUFACTURER TO NRC
MONTHYEARML20069H3401982-10-13013 October 1982 Advises That Company No Longer Performing Analyses for Exxon Nuclear Supplied Fuel Under Irradiation in Plant.Util Made Separate Arrangements.Util Utilizing or Planning to Utilize Fuel for Operating Conditions Outside Analyzed Conditions ML20052B6341982-04-27027 April 1982 Provides Addl Info Re Fuel Rod Bowing in Support of XN-NF-81-21(P), Generic Mechanical Design for Exxon Nuclear Jet Pump BWR Reload Fuel. Neutronic Effects of Fuel Rod Bowing in BWRs Expected to Be Small ML19289E6471979-05-10010 May 1979 Forwards Mar 1979 Mark I Containment Program Activity Review ML18043B1451979-03-20020 March 1979 Forwards Proprietary Rept NEDE-23749-1-P, Comparison of Analytical Model for Computing Safety Relief Valve Discharge Line Transient Pressures & Forces to Monticello T-Quencher Test Data. Withheld (Ref 10CFR2.790) ML20126E2181968-06-13013 June 1968 Advises That New Peak Clad Temp Calculation Results in 2,200 F.Addl Info to Be Submitted 1982-04-27