ML20126C892

From kanterella
Jump to navigation Jump to search
Forwards SALP Rept 50-412/85-99 for Apr 1984 - Mar 1985. Meeting to Discuss Assessment,Including Organizational Structure Reinsps & Electrical Concerns,Scheduled for 850619 in Shippingport,Pa
ML20126C892
Person / Time
Site: Beaver Valley
Issue date: 06/07/1985
From: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Carey J
DUQUESNE LIGHT CO.
Shared Package
ML20126C895 List:
References
NUDOCS 8506140562
Download: ML20126C892 (2)


See also: IR 05000412/1985099

Text

_ , ,

.a - ;e

Docket No. 50-412 JUN 0 71985

Duquesne Light Company

ATTN: Mr. J. J. Carey

Vice President

Nuclear Group

Post Office Box 4

Shippingport, Pennsylvania 15077

Gentlemen:

Subject: Systematic Assessment of Licensee Performance (SALP) Report 50-412/85-99

The NRC Region I SALP Board has assessed the performance of activities at the

Beaver Valley Power Station, Unit 2 for the period April 1, 1984 - March 31, 1985.

The SALP Board Report is enclosed. A meeting to discuss this assessment has been

scheduled for June 19, 1985. This meeting will be held in Shippingport, Pennsyl-

vania, near the site.

At the SALP meeting, you should be prepared to discuss our assessment, particularly

in the area of organizational structure, reinspections, and electrical concerns

discussed in the report and your plans to improve performance. The meeting is in-

tended to be a dialogue wherein any comments you may have regarding this report

may be discussed; and, if there is additional information which you believe could

alter the assessment, please feel free to identify such matters. Additionally,

you may provide written comments within 30 days after the meeting. Consideration

of any points raised during the meeting or in your written comments will be re-

flected in my characterization of your overall safety performance which will be

provided as part of the final SALP package.

4

Your cooperation with us is appreciated.

,

Sincerely,

,

I

j Original signed by

l Thomas E. Murleg

i

Thomas E. Murley

l Regional Administrator

i

Enclosure: SALP Report 50-412/85-99

.

!

h506140562850607

ADOCK 05000412

G

PDR

1

0FFICIAL RECORD COPY

I l

l

._ - -

.i :* 5

,

< Duquesne Light Company 2 JUN 0 71985

cc w/ encl:

E. J. Woolever, Vice President, Nuclear Construction Division

R. E.-Martin, Manager, Engineering

R. J. Swiderski, Manager, Startup Group

E. Ewing, Quality Assurance Manager

E. F. Kurtz, Jr. , Manager, Regulatory Affairs

P. RaySircar, Stone and Webster Engineering Corporation

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/ enc 1:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o encl)

DRP Section Chief

SALP Board Members

D. Holody, RI

-.J. Taylor, IE

RI R P i p

I R.

r zinger fing llan

a Mugley

j'f pp/meo2

j i y

0[3[g5 /;/3/85 6/g/85 6/f/85

1 0FFICIAL RECORD COPY