JUN 0 71985
Docket No. 50-412
Duquesne Light Company
ATTN:
Mr. J. J. Carey
Vice President
Nuclear Group
Post Office Box 4
Shippingport, Pennsylvania
15077
Gentlemen:
Subject:
Systematic Assessment of Licensee Performance (SALP) Report 50-412/85-99
The NRC Region I SALP Board has assessed the performance of activities at the
Beaver Valley Power Station, Unit 2 for the period April 1, 1984 - March 31, 1985.
The SALP Board Report is enclosed.
A meeting to discuss this assessment has been
scheduled for June 19, 1985.
This meeting will be held in Shippingport, Pennsyl-
vania, near the site.
At the SALP meeting, you should be prepared to discuss our assessment, particularly
in the area of organizational structure, reinspections, and electrical concerns
discussed in the report and your plans to improve performance.
The meeting is in-
tended to be a dialogue wherein any comments you may have regarding this report
may be discussed; and, if there is additional information which you believe could
alter the assessment, please feel free to identify such matters.
Additionally,
you may provide written comments within 30 days after the meeting.
Consideration
of any points raised during the meeting or in your written comments will be re-
flected in my characterization of your overall safety performance which will be
provided as part of the final SALP package.
4
Your cooperation with us is appreciated.
Sincerely,
,
,
I
j
Original signed by
l
Thomas E. Murleg
i
Thomas E. Murley
l
Regional Administrator
i
Enclosure:
SALP Report 50-412/85-99
.
h506140562850607
!
G
ADOCK 05000412
1
0FFICIAL RECORD COPY
I l
l
._
-
-
.i :* 5
,
< Duquesne Light Company
2
JUN 0 71985
cc w/ encl:
E. J. Woolever, Vice President, Nuclear Construction Division
R. E.-Martin, Manager, Engineering
R. J. Swiderski, Manager, Startup Group
E. Ewing, Quality Assurance Manager
E. F. Kurtz, Jr. , Manager, Regulatory Affairs
P. RaySircar, Stone and Webster Engineering Corporation
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bec w/ enc 1:
Region I Docket Room (with concurrences)
Senior Operations Officer (w/o encl)
DRP Section Chief
SALP Board Members
D. Holody, RI
-.J. Taylor, IE
RI
R
P
i
I
R.
p
j'f pp/meo2 y
i
0[3[g5
/;/3/85
6/g/85
6/f/85
a
zinger
fing
Mugley
llan
r
j
1
0FFICIAL RECORD COPY