ML20126C784

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-293/85-12 on 850521-24.No Violation Noted.Requests That Concerns Re HPCI Oil Sys Be Addressed within 30 Days
ML20126C784
Person / Time
Site: Pilgrim
Issue date: 06/10/1985
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrington W
BOSTON EDISON CO.
Shared Package
ML20126C788 List:
References
NUDOCS 8506140523
Download: ML20126C784 (2)


See also: IR 05000293/1985012

Text

{{#Wiki_filter:_ - ______-______ ________ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _

 ..
    .
      Docket No. 50-293                   JUN 101985
      License No. DRP-36
      Boston Edison Company M/C Nuclear
      ATTN:   Mr. William D. Harrington
              Senior Vice President, Nuclear
      800 Boylston Street
      Boston, Massachusetts     02199
      Gentlemen:
      Subject:   Inspection 50-293/85-12 (5/21-24/85)
      This refers to the routine safety inspection of the Pilgrim Nuclear Power Station
      by Mr. F. A. Casella of this office.                            Areas examined during this inspection are
      described in the enclosed NRC Region I Inspection Report. The inspection findings
      were discussed by Mr. Casella with Mr. Ziemianski and other members of your staff
      at the end of the inspection.
      During this inspection, it was noted that, in response to NRC Circular 80-07, you
      had established a High Pressure Coolant Injection (HPCI) System lubricating oil
      sampling program at a 3-month sampling frequency. But, no sampling results were
      available for HPCI oil samples taken after July 1982. Further, the analyses were
      identified as being provided by the supplier of the oil, and total reliance on the
      supplier was identified as the means of identifying problems with the oil. We are
      concerned that you do not appear to have effectively implemented the commitment
      made by you in this case. We are further concerned that you do not appear to have
      an effective means of assuring that the lubricating oil in the HPCI System is
      suitable for service. Please address these concerns and provide us with a written
      reply in 30 days, emphasizing how you assure that the HPCI oil system will pro-
      perly support HPCI operation.
      Your cooperation with us in this matter is appreciated.
                                                                        Sincere 1y, Drint :: S$gg,, gys
                                                                                          W                                                            O
                                                               ,
                                                                        Edward C. We zinger, Chief

l

                                          q                              rojects Branch No. 3                                                            J

> '

                                             t                          Division of Reactor Projects
      Enclosure:   NRC Region I Report  50l93/85-12
                                                                                                                                                         l
                     st"Wil
                      G
                                  MI$2'
                   _     _ _ _ _ _ _ _ _ - _ _ _                         _ _ _ - _____      -

_

       -
 ..
    ..
          Bosten Edison Company M/C' Nuclear                                              2
                                                                                              jgy I g 1985
          cc w/ enc 1:
          A. V. Morisi, Manager, Nuclear Management Services Department
          C. J. Mathis, Station Manager
          Joanne Shotwell, Assistant Attorney General                                                      -
          Paul Levy, Chairman, Department of Public Utilities
          W. J. Nolan, Chairman, Plymouth Board of Selectmen
          Plymouth Civil Defense Director
          Senator Edward P. Kirby                                                                            '
          Public Document Room (PDR)
          local Public Document Room (LPDR)
          Nuclear Safety Information Center (NSIC)
          NRC Resident Inspector
          Commonwealth of Massachusetts (2)
          bec w/ enc 1:
          Region I Docket Room (with concurrences)
          Senior Operations Officer (w/o encls)
          Section Chief, DRP
          Director, DRS
          Director, DRSS

t l l ' F P P

         s                                                              R@IDRP,A
            4 lla/meo                                                   Wenzinger
          6/7/85
                                                 [[                                    6h
                                                                       0FFICIAL RECORD COPY
                                                 _ - _ _ _ _ _ _ _ _ _

}}