UNIT (D STATES
4
o
,
y.
- . .
NUCLEAn nEGULATOnY COMMissl0N
I
g
REGION 811
.
g
GLE N f LLYN. ILLINOIS 60137
.....
DEC 1 ^ W
Docket No. 50-440
)
Centerior Service Company
A11N:
Mr. R. A. Stratman
Vice President
fluclear - Perry
l
c/o lhe Cleveland Electric illuminating
Company
10 Center Road
Perry, OH 44081
Dear Mr.-Stratman:
This refers to the inspection conducted by Messrs. A. Vegel, E. Duncan, and
P. Hiland of this office on October 20 through November 20, 1992.
The
'
inspection included a review of activities authorized for your Perry Nuclear
Power Plant, Unit 1, facility. At the conclusion of the inspection, the
findings were discussed with those members of your staff identified in the
enclosed report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
(
and representative records, interviews with personnel, and observation of
activities in progress.
l
Based on the results of this inspection, certain of your activities appeared
to be in violation of NRC requirements, as specified in the enclosed Notice of
Violation (Notice).
The violation is of concern due to your failure to take
prompt action in accordance with Technical Specification guidance, which
demonstrated an apparent weakness in your understanding of the basis of the
Technical Specifications.
During this inspection, one additional item appeared to be in violation of NRC
requirements.
However, as described in the enclosed inspection report, you
identified this violation.
Thertfore, the violation will not be subject to
enforcement action because your efforts in identifying and correcting the
violation meet the criteria specified in Section VII.B of the * General
Statement of Policy and Procedure for NRC Enforcement Actions," (Enforcement
Policy, 10 CFR Part 2, Appendix C (1992)).
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response,
in your
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence. After reviewing your response to this
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
9212220108 921210
ADOCK 05000440
0
I Eol
ni
.__ - __ -
. . . _ . . .
.
.
.
DEC 101992
Centerior Service Company
2
.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, enclosures, and your response to this letter will be placed in
the NRC Public Document Room.
The responr,es directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
~
Sincerel ,_
l~ J _ "g
L. Robert' dF6ger, Chief
Reactor Projects Branch 3
Enclosures:
2. Inspection Report
No. 50-440/92022(DRP)
Q111Lihution
cc w/ enclosure:
a
F. R. Stead, Director, Nuclear
Support Department
D. P. Igyarto, General Manager,
Perry Nuclear Power Plant
K. P. Donovan, Manager,
Licensing and Compliance Section
S. F. Kensicki, Director, Perry
Nuclear Engineering Dept.
H. Ray Caldwell, General
Superintendent Nuclear Operations
DCD/DCB (RIDS)
OC/LFDCB
Resident inspector, Rill