ML20126B426

From kanterella
Jump to navigation Jump to search
Final Deficiency Rept Re Overstressed Pipes,Pipe Supports & Equipment Nozzles Identified During Valve & Operator Weight Verification Program Required by IE Bulletin 79-14.Caused by Changes in Valve & Operator Weights.Oversize Charts Encl
ML20126B426
Person / Time
Site: North Anna 
Issue date: 03/07/1980
From: Brown S
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
References
REF-PT21-80-201-001 IEB-79-14, NUDOCS 8003120598
Download: ML20126B426 (3)


Text

_. -

=

Vepco VIRGINI A ELECTRIC AND POWER COMP ANY, RICHMONO, VIRGINI A 23261 March 7, 1980 Mr. Jamas P. O'Reilly, Director Serial No. I P A Office of Inspection & Enforcement PSE2.C/CGC:mac: wang U. S. Nuclear Regulatory Commission Region II Occ'<st ';o. EO-339 101 M eietta Street, Suite '100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

On February 7, 21, and 28,1980 reports, identified herein as the original report and suoplemental reports 1 and 2, resoectively, were We under the provisions of 10CFR50.55(e) concerning nonconformances identified during our reviet of I.E. Bulletin 71-lt..

Please reference our letter Serial No.193 of

'Mrch d,1980, which was our five-day written report under the provisions of i

10CFR21.

In our valve and operator waight verification progrtm required by I.E.

Bulletin 79-16, we have identified nonconformances in the form of overstressed pipes, pipe supports, and eauioment nozzles resulting from changes in valve and operator weights.

In our five-day report we enclosed a Table I which provided the details of each nonconformance in supolements 1 and 2.

'le have

^

updated that table and extendad it to include the nonconformances in our criginal report.

As indicatad in Table I, most of the construction required to correct these nonconf ormances has already benn comelated.

T'se items in Tab 1? I Pics Swe " construction in ornaress" will be cocapleted prior to the following milevores:

MSK 103AY Lo # Fuel 1

"SK 102D Initial C*iticalito MSK 105A Mode 4 This is our final report under the provisions of 10CFR50.55(e).

If there are any questions, please contact this office.

Very truly yours.

4

[h i) ~

  • D

(-Q

~

Sam C. Brown, Jr.

I Senior Vice President - Po'ae-S'Atton ag]

g J kg Engineering and Construction

.n 2 gob hj\\

cc: Mr. Victor Stello, Director Office of Inspection & Enforcement k

, ' Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation j

bh 8003120 J

..