Forwards Insp Rept 50-482/92-31 on 921011-1121 & Notice of Violation
ML20126A485
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 12/11/1992
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Withers B
WOLF CREEK NUCLEAR OPERATING CORP.
Shared Package
ML20126A488 List:
References
NUDOCS 9212210081
Download: ML20126A485 (6)


See also: IR 05000482/1992031

Text

pR M

UNITE J STATES

4

NUCLEAR REZULATORY COMMISSION

,,

(

-}

}

REGION IV

\\

C

611 RY AN PLAZA oRIVE, SulT L 400

V,

AR LINGTON. T E XAS 76011 8064

DEC i i 1992

Docket No. STN 50-482

License No. NPF-42

Wolf Creek Nuclear Operating Corporation

ATTN:

Bart D. Withers

President and Chief Executive Officer

P.O. Box 411

Burlington, Kansas 66839

Gentlemen:

SUBJECT: NRC INSPECTION REPORT 50-482/92-31 (NOTICE OF VIOLATION)

Th'.s letter refers to the inspection conducted by Messrs. G. A, Pick and L. E.

Myers of this office during the period of October 11 through November 21,

1992.

The inspection included a review of activities authorized for your Wolf

Creek Generating Station. At the conclusion of the inspection, the findings

were discussed with you and those members of your staff identified in the

enclosed report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examination of procedures

and representative records, interviews with personnel, and observations of

activities in progress.

An unresolved item was identified during this inspection (Section 4.3) that

involved a failure to properly control heavy loads over spent fuel elements.

This event will be reviewed further to evaluate the work control process, as

well as complian , with the requirements of Technical Specification 3.9.7.

Based on the r

uts of this inspection, certain of your activities appeared

to be in violation of NRC requirements, as specified in the enclosed Notice of

Violation (Notice). Violation A pertains to an inodequate alarm response

procedure. This violation was identified by the NRC and is of concern because

the task group formed to evaluate a refueling water storage tank low boron

concentration condition failed to identify the procedure weakness

(Section 3.2).

Violation B pertains to inadequate postmaintenance test

instructions,

This violation is of concern because it is indicative of

continuing problems in the areas of work planning and control- (Section 3.6).

Violation C pertains to one example of failure to follow procedure that

resulted in decreased letdown flow and a loss of charging flow (Section 8).

This violation is of concern because it represents a continuation of a

negative performance trend involving operator inattention to detail.

You_r staff identified that a data transfer error of design sper.ifications

3

resulted in an inadequate repair to a safety-related motor-operated valve

9212210081 921211

/

PDR

ADOCK 05000482'

G

PDR

l

c

,

i

<

= ,

>

m * '.

NE

Wolf Creek Nuclear Operating-

2-

-

m

-Corporation?

Ibecauseofth'emaintenanceinstruction'swerenotappropriatetothe

circumst,nces. The inadequate maintenance stemmed from a failure to properly

control i otor-operated valve-design information, which is a violation of

10 CFR 50,' Appendix B, Criterion 111. This violation was not cited because.

the criteria .in paragraph Vll.B.2 of 10 CFR 2, Appendix C (Enforcement

Policy), were satisfied,

lhis_ violation was an isolated occurrence, and the-

licensee staff took prompt and effective corrective actions (Section 3.6)'.

You are required to respond to this letter and should follow the instructions

~

specified in the enclosed Notice when preparing your response.

In-your

response, you should document the specific actions taken and'any additional _

. actions you plan to prevent recurrence. After reviewing your_ response to th_is

Notice, including your proposed corrective. actions and the results of_ future

inspections, NRC will determine whether further NRC enforcement actions is

necessary to ensure compliance Wth NRC regulatory ~ requirements.

._

In:accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

'this: letter and its enclosures will be placed in the NRC Public Document Room.

The response directed by this letter and the enclosed Notice-is not subject to

the clearance procedures of. the Office of Management and Budget as required by

the Paperwork Reduction Act of 1980, Pub. L. No.96-511.

Should you'have any questions concerning this Inspection, we will be S eased

to discuss them with you.

4

Sincerely,

.

'A. Bill Beach, Director

Division of Reactor Projects

~

Enclosures:

l'.

Appendix.'A - Notice of Violation

2. -Appendix B'- NRC Inspection Report

-50-482/92-31-w/ attachments

cc w/ enclosure:

Wolf _ Creek _ . Nuclear Operating Corp.

,

ATTN: -Otto Maynard,-Director

Plant Operations-

P.O. : Box-- 411 :

Burlington, Kansas- 66839-

.

Shaw, Pittman, Potts-&-Trowbridge-

ATTN: , Jay Silberg, Esq.

2300 M Street,--NW

-Washington,

D.C._-

20037

,

<

,

r

f

g - ' -

e

-t.s3-

1

es

v

w

i +, pre-

~~g

,ser - s

e

-

e-

o

3

fl '

!> .

.. ~

Wolf Creek Nuclear Operating

-3-

'

Corporation-

-

Public Service Commission

' ATTN:

.C. John Renken

Policy & Federal Department

P.O. Box 360

Jefferson City, Missouri

65102

U.S. Nuclear Regulatory Commission

ATTN:

Regional Administrator, Region Ill

799 Roosevelt Road

Glesi Ellyn, Illinois 60137

Wolf Creek Nuclear Operating Corp.

i

ATTN: Kevin J. Moles

Manager Regulatory Services

P.O. Box 411

Burlington, Kansas 66839

Kansas Corporation Commission

ATTN:

Robert Elliot, Chief Engineer

Utilities Division

'

1500 SW Arrowhead Rd.

Topeka, Kansas 66604-4027.

Office of the Governor

State of Kansas

Topeka, Kansas 66612

!

Attorney General

1st Floor - The Statehouse

l

Topeka, Kansas 66612

r

!

Chairman, Coffey County Commission

<

- Coffey County Courthouse

'

!

Burlington, Kansas 66839-1798

l

Kansas Department of Health

and Environment

Bureau of Air Quality & Radiation

Control

ATTN: Gerald Allen, Public

Health Physicist

Division of Environment.

Forbes Field-Building 321

Topeka, K0nsas 66620

l

. .

t

l

<

.

- . -

, - . . . - .

~ - , - , .

-.-.,2.

. . . , - - , . , . ,

.-.

. , , ,

, . , . -.,-,,,.:..-

, . +

- . ,

. _

- _ , - . . -

. . _ _

_ - _

- . . .

__. _..

._

__

____

.

.~

~ l

. L-

^

l-

Wolf Creek Nuclear Operating

-4-

'

Corporation

Kansas Department of Health and Environment

ATTN:

Robert Eye, General Counsel

--

LS0B,-9th F1oor

-900 SW Jackson

Topeka, Kansas 66612

.,

4

a

d

t

-

' .*

Y'#-4**w rMe+.-b

-+mem,.7g_,,

.,.7m.3e,s.%yy,ge,,,

__

t

-b

I

DEC1IlE

Wolf Creek Nuclear Operating

-5-

Corporation

~bec to DMB (IE01)

bec distrib. by RIV:

J. L. Milhoan

Resident Inspector

Section Chief (DRP/D

DRP

DRSS-FIPS

Section Chief (RIII, DRP/3C)

RIV Fi'le

SRI, Callaway, Rlli

MIS System

RSTS Operator

Project Engineer (DRP/D)

Lisa Shea, RM/ALF, MS: MNBB 4503

Section Chief (DRP/TSS)

DRS

G. F. Sanborn, E0

J. Lieberman, OE, MS: 7-H-5

G. A. Pick, SRI

4

__

M

D:

SRI:DRE g

\\A@1,Howell

RIV:RI:DRP/D

GAPick

AEM ach

LEMyers:sa

it/ ?;/92

/ 9 /92

tt/ti/92

/ /92

..

f

a

Wolf Creek Nuclear Operating

-5-

DEC i 1 EB2

Corporation

bec to DMB (IE01)

bec distrib. by RIV:

J. L. Hilhoan

Resident inspector

Section Chief (DRP/D

DRP

DRSS-FIPS

Section Chief (Rill, DRP/3C)

RIV File

SRI, Callaway, Rill

MIS System

RSTS Operator

Project Engineer (DRP/D)

Lisa Shea, RM/ALF, MS: MNBB 4503

DRS

Section Chief (DRP/TSS)

G. F. Sanborn, E0

J. Lieberman, OE, MS: 7-H-5

G. A. Pick, SRI

-

_

RIV:Rl:DRP/D

SRI:DR @ q

DRP/

D:

LEMyers:sa

GAPick L7

'A Howell

AIIWach

/ /92

ft/$/92

N/ 0) /92

it/68 /92

I

. . _ . . . . - . . .