ML20126A406

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Nov 1992 for McGuire Nuclear Station Units 1 & 2
ML20126A406
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 11/30/1992
From: Simmons N, Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20126A401 List:
References
NUDOCS 9212210037
Download: ML20126A406 (10)


Text

.

CF[F.Af DB DATA FEFDFT t @ El ND 50-369 0Aff htteter 15.1592 Of EF Ai!G STATUS COMFLETED EY P.A, Willins TELEFHONE 704-3515346

1. Urut Naat McGure 1
2. Feprting Feriodi knester 1,1992-Natsber 30,1992
5. Licensed Iter tal h ver (Nt):

3411

4. Naseplate Rattrq (Gross Ne):

13 % i Notes # Nan plate Pating

5. Design Elettrical Fating (het MWelt

!!!o (Gross MWe! taltvlated at

6. Muisus hpendable Casatity (6ron MWe, 1171 1450.000 W i

.90 peer 2

t 1129 factor per iage 111,

7. M utsus bpendatle Capacity (Net PWei
9. If Changen Occur in Capacity Rating
s. ten Wuster 3 Through 7) Since Last NUEEG-0020.

Rescrt. Cine Eustnu

9. hwer Level To Which Festritted, if Any (Net MWeb
10. Reastri for Fiestrictn ns, if anyt This Month Vr.-to-Date Cuaulative
11. Hours In Fen tting h riod 720.0 0040.0 96432.0
12. Nunter Of Hours Featttr Was Critical 720.0 6110.7 68112.2 13, Rea:ter Reserve Shutaten Hours

--0--

--0--

- 14. Hours Eenerater On-Lire 720.0 6097.6 67378.5

15. Unit Reserve Shutdown Hours

--0~

--0--

--0--

.16. Stoss Theraal Energy Generated (MWH) 2451002 202615B1 207247242

17. Gren Electrical Energy Sererated (NH) 945100 6938428 71298253
18. Net Electrical Energy Generated (MW) 813283 6640929 66071892
19. Unit Servite factor 100.0 75.8 69.9
20. Unit hailatility Factor 100.0 75.0 69.9
21. Unit Capacity f actor (Using MDC Net) 100.1 73.2 61.3 P2. Unit Capacity Fatter (using DER Wet) 95.7 70.0 59.0 C3, Unit Forced Outar Rate 0.0 24.2 13.7
24. Shatdenn Scheduled Over Next 6 Months (Type, hte, and Dur stion of Eachh Refueling - March 12, 1993 - 84 clays
25. If 55at her, At End Of Repcrt ferio1. Est1 sated Date of Startup:
26. Units in Test Status (Frit<r to Cessercial Operatirnh Forecast Achieved

!NillAL CRITICAL!!Y INITIAL ELECTRIC!1Y CCMEFCIAL OPEFATICN 9212210037 921215 PDR ADOCK 05000369 H

PDP

0FERA11NS DATA REPORT DOCKET NO 50-369 UN!i McBotre i DATEtrneber 15. 1992 COMPLETEDBf R.A. Williets IELEPHONE 704-392-5346 i

90NIH N0vester. 1992 lay,.

AVERABEDAILYPOWERLEVEL PA1 AVERAGEDAILYF0WERLEVEL (MWe Net)

(MWe Net)

I 1126 17 1134 2

!!26 IB 1135 3

1126 19

1131, 4

llE4 20 1131 t

5 1126 21 1131

~6 1126 22 1136 7

1125 23 1135 8

1126 24 1133 9

1103 25.

1132 10 1120 26 1134 11 1129 27.

I134 12 1131 28 1134 13 I131

- 29 '

i:?*

14 1130

~ 30 1132 15.

1131 16.

1130

,.+.-.,L.

.. -. - _.. ~

-...n..

...a-.

UNIT SHUTDC9NS Arid POWER REDUCTIONS DOCKET WO.

50-369 UNIT NAME Mu,v ihr, 1 DATE 14/ id/ 94 REPORT MONTH November 1992 COMPLETED BY ti.

C.

s1MMuns TELEPHONE

</us)-adz-dzbJ (1)

R)

(3)

(4)

(5)

(2 MET-i E

IiOD T

A' OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S 4

+

4 1

I L(1)-

(2)

(3)

(4)

F Forced Reason; Method:

Exhibit G - Instructions S Scheduled

.A-Equi ment Failure Explain)-

1-Manual

'forPrehetsForLicensee ration of Data i

B-Main enanc~ or tes 2-Manual Scram Entry S C-Refueling 3-Au'omatic Scram Event Report (LER (NUREG-0161))

D-Regulatory R9striction 4-Other (Explain)

File 1

E-Operator Training & License Examination l

F-Administrative (5)

G-Operator Error (Explain)

Exh' bit I - Same Scurce i

H-Other (Explain) 7 l-

)

i

[

d DOCKET No:

50 369 i

UNIT:

McGuire 1 DATE:

12/15/92 UARRATIVE

SUMMARY

MONTil:

November 1992 McGuire Unit 1 began the month of November operating at 100% full power.

The unit operated at or near 100% for the entire month.

Prepared by:

N. C. Simmons ielephone.

704-382-5263

MoliTilLY REFUELIl1G Il4 FORMAT 10!i REOUEST t

1.

Facility name: McGuire, Unit 1 2.

Scheduled next refueling shutdown: March 1993 3.

Scheduled restart following refueling. June 1993 Tile PROJECT MAIJAGER llAS BEEli ADVISED BY SEPARATE COMM'U111CATIOli OF Ally T.S.

Cl!A!1GE OR LICEllSE AMEllDMEllT.

Ti!EREFORE,

QUESTIOllS 4 T!!ROUGli 6 WILL 110 LO!JGER BE MAlliTAINED 111 TilIS REPORT.

4.

Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?

If yes, what will these bo?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unroviewed-safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (now or different design or i

supplier, unreviewed design or performance analysis methods,-

significant changes in design or now oporating procedures).

7.

Number of Fuel assemblies (a) in the core: 191 (b) in the spent fuel pool 512 8.

Present licensed fuel pool capacity: 1M1 Siza of requested or planned incroace:

9.

Projected date of last refueling which can be accommodated by procent licensed capacity: March 2006 DUKE POWER COMPAliY OATE:

December 15, 1992 llame of

Contact:

E.

A.

Williams Phone:

294 382-5346 l

i l-l l

l

i 0FEF A11NS LAT A FLf 0Fi DOCfEi NO

$0-370 LATE krister 15. 1992 CrEntlN351Algi COMPLETED BY F.A. Willites TELEFHONE 704-M2-5346

1. Unit hase: PtGeire 2
2. f tporting f eried: ha ester 1, 1992-Novetter 30,1972
3. Litersed itersal Ftwer (Ntli 3411 4, Nameplate Fating (6 toss M e):

13%e kates aNaseplate fatir.g

5. Design Electrical Rating (het Ne):

!!D (Bross Wel calculated as

6. Maritas Dependable Capattty (Brcss Ne)t 1171 1450.000 MA

.90 power

7. Mails.it Dependable Capacity (Net N e):

1129 factor per Page ill,

6. If Changes Occur in Capatity Ratings (!tess Nuater 3 through 7) Since last NUEEB-0020.

Feprt. Blve Feater,st

9. Fener level to Wntth Festricted, if Any (Ne' Ne):
10. Feason f or festrictions, if any:

This Month Yr. to-Date Cusulative

11. Hats in lieporting Feriod 720.0 6040.0 76728.0
12. N cter Of Hours Peactor Was Critical 720.0 5470.9 58672.4
13. Feacter Feserve Shutdown Hcurs

--0--

--0--

14. Hours Gerierater On-Line 720.0 5400.2 57753.1
15. thut Reserve Shutdenn Hours

--0--

--0--

--0--

16. Bross Iberaal Energy Generated (GH) 2449669 17B58021 185874451
17. Grots Electrical Energy Generated (NH1 65B449 6197723 66028639 IB. Net ElectrItal Energy Generated (NH) 6266 %

5922792 63303203

19. Unit Service fattcr 100.0 67.2 75.3
20. Unit Anilability Fa.ttr 100.0 67.2 75.3
21. Unit Capacity Fattor (Using MDC Net) 101.7 65.3 72.1 P2. Unit Capacity fetter (Using DER Net) 97.3 62.4 69.9
23. linkt Forced Outage Eate 0.0 4.1 7.7 26 Shutdtwn Scheduled Over Next 6 Months (Type, Date, and Duration of Eachlt hone
25. If But Down At End Of Fepert Perted. Estimated Date of Startup:
26. Unin In fest Status (Prior to Centercial Operationit Forecast Achieved IN!IIAL CRIT!CALITY lhlTIAL ELECTRIClit COMERCIAL 0FEP4t!0N

.._...,_.....___...m...

i OPERATIh6 DATA REPORT 00CLET NO

$0-370 UNIT Pc691re ? _

DATE Derrsber 15.191-COMPLETEDBY R.A. Willlass 1

TELEPHONE. 704-382-5346

-l l

MONTH Novesber,1992 i

(Al-AVERAGE DAILY F0WER LEVEL p].1 AVERA6E DAILY F0WER LEVEL (MWe* Net)

(MWe Net)

!!46 17 1150 2

1146 18 1151 3

1145 19 1150 f

4 1145 20

!!47 5

1146 21 1169 6

1145 22 1150 7-1144 23 1851 B

1145 24 1150 9

1146 25 1150 10

!!47 26 1151

'll 1147 Et 1151-12 1149 28 11.51 5

13 1149 29 1151

-.14

!!4B 30 1152--

15 1148 16 1149 i

r.

,n

.-..=.....,_n,,6_-=,_..

1.-..

.w

.,,.:n---a,

,a n

.-r L+

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

SG-370 UNIT NAME nurulut, z DATE 12/13/9z REPORT MONTH November 1992 COMPLETED BY N.

c. sinMuad TELEPHONE i/v4J->uz-dzoJ (1)
8) REi-(2 (3)

( 4- )

(5)

~

E HOD T

A OF LICENSE

.M Y-S SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1)

(2)

(3)

(4)

F Forced Reason-Method:

Exhibit G - Instructions S' Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance'or test 2-Manual Scram Entry Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER (NUREG-Ol61))

D-Regulatorg' R9striction 4-Other (Explain)-

File E-Operator 1 raining & License Examination F-Administrative.

(5)

G-Operator Error (Explain)

Exhibit I - Same Source H-Other (Explain)

._ _ m _...

i i

UNIT: McGuire 2 DATE:

12/15/92 NARRATIVE

SUMMARY

MONTH:

November 1992 McGuire Unit 2 began the snonth of November operating at 100% full j

power. The unit operated at or near-100% for the entire month.

The

. I unit ended the (nonth at 100% full power.

i l

I h

i L

Prepared by: N. -- C. Simmo_ns-~

. Telephone:

704-382-5263 fk=

H s

.=t

-y-,

pg- - -f, af sv

-..-w.e i e sy ++ g rw +

si--+

vpey>=

1-ye.

y r

y,+y g

er.w-we y

e--

t g 7-

lio.!.DJiLY R1:FUEld1LG_11EOjillATIOli REQUfE1' l.

Facility name: Jiggnjre, Unit _a 2.

Scheduled next refueling shutdown: July 1993 3.

Scheduled restart following refueling: Sentomber 1993 Tile PROJECT 14AllAGER liAS BEE!1 ADVISED BY SEPARATE CO!414U!11CATIO!1 OF Al1Y T.S.

CilA!1GE OR LICE!!SE A!4E!1D14EllT.

TilEREFORE, QUESTIOllS 4 T11ROUGli 6 WILL 110 LOI1GER BE 14AI!1 TAI!!ED IN TilIS REPORT.

4.

Will refueling or resumption of operation thereafter require a j

technical specification change or other license amendment?

If yes, what will these be?

If no, has rel.oad design and core configuration been reviewed by Safety Review Committee regarding unroviewed safety queutions?

s f

S.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (now or different design or

supplier, unroviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

11 umber of Puel accomblies (a) in the core: 193 (b) in the spent fuel pool: ]_41 8.

Present 1iconsed fuel pool capacity: 1463 Size of requested or planned increase: ---

9.

Projected date of last refueling which can be accommodated by present licensed capacity: Ee_g_g g lte r 2 0 0 3 DUKE POWER C0!4PANY DATE:

December 15 17,22 flame of

Contact:

R._J. W i l l i_ ann Phone:

294-382-5364