C.
VIItOINI A Er.1: critic AND POWiCit COFil'ANY H icii >t o s t). VIRGINIA 23201 December 11, 1992 U. S. Nuclear Regulatory Commission Serial No.92-793 Attention: Document Control Desk NL&P/JMJ:jm]
Washington, D.C. 20555 Docket Nos.
50 338 50 339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for North Anna Power Station Units 1 and 2 for the month of November 1992.
Very truly yours, 5
M. L. Bowling, Manager Nuclear Licensing and Programs Enclosure cc:
U.S. Nuclear Regulatory Commission 101 Marietta Street, NW Suite 2900 Atlanta, GA 30323 Mr. M. S. Lesser NRC Senior Resident inspector North Anna Power Station 16003.
[
921217o066 921130 gDR ADOCK 0500 8
ll[
VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT-MONTH:
November YEAR:
1992
~
Approvedi station Manager.
,~l'
-~
1-
CPERAflNG DATA RFP02T DOCKET No.:
50 338 DATE: Decenter 7,1992 CONTACT: G. E. Kane PHONE: (703) 894 2101 OPERATING STATUS 1.
Uni t N ame s................................ N or t h Anna 1 2.
R epor t i ng P er i od s......................... N ovette r 1992 3.
L i c ensed The rma l Power (MWt ):.............
2,748 4.
Nameplate Rating (Gross MWe).............
947 5.
Design Electrical Rating (Net MWe).......
907 6.
Maximun Dependable Capacity (Gross MWe):..
894 7.
Maximum Dependable Capacity (Net MWe)....
848 8.
If changes occur in Capacity Ratings (ltems No. 3 thru 7) since last report, give reasonst,,,,.N/A 9.
Power level to which restricted, if any (Net MWe): _ N/A
- 10. Reasons for restrictions, if any:
N/A This Month T-t D Cumulative
- 11. Hour s i n R epor t i ng P er i od...............................
720.0 8,040.0 126,612.0
- 12. Nunber of Hours Reac t or was Cr i t i ca l.....................
720.0 6,498.3 93,186.8
- 13. R eac t or R eserve shut down Hours...........................
0.0 36.3 6,758.0
- 14. Hours Generator 0n Line..................................
720.0 6,481.2 90,252.7
- 15. Unit Reserve shutdown Hours..............................
0.0 n.0 0.0
- 16. Gross Thermal Energy Generated (MWH)..................... 1,209,022.4 16,242,690.2 239,195,462.6
- 17. Gross Electrical Energy Generated (MWH)..................
388,646.0 5,348,580.0 78,606,427.0
- 18. Net Electrical Energy Generated (MWM)....................
359,100.0 5,066,642.0 74,421,259.0
- 19. Unit service Factor......................................
100.0%
B0.6%
71.3%
- 20. Un i t A ve l l ab i l i t y F ac t or.................................
100.0%
B0.6%
71.3%
- 21. Unit Capacity Factor (using MDC Net).....................
58.8%
72.8%
65.8%
- 22. Unit Capacity Factor (using DER Net).....................
55.0%
69.5%
64.8%
- 23. Forced Outage Rate.......................................
0.0%
0.0%
11.5%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each)_ Steam Generator Replacement and Refueling Outage, January 1993, approximately 120 days.
- 25. If Shutdown at end of Report Period, estimated time of Start @s N/A
- 26. Units in Test Status (Prior to Comercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERAfl0N 1
7-g.*
e s
l,
}
i i
j AVERAGE DAILY UNIT POWER LEVEL Docket No.
50-338 Unit NA-1 Date Dec.
7.
1992
{
Contactt G.
E.
Kane Phonet (703) 894-2101 i
i, 4
MONTH:
November 1992 i
}
l l
DAY AVERAGE DAILY POWER DAY AVERAGE DAILY LEVEL LEVEL (MWe-Net)
LEVEL (MWe-Ne t ) '
v i
1
-583 17 485 j
2 580 18 484 3
569 19 483 4
567 20 472 5
565 21 465 l
6 540 22 469 7
534 23 457 i
8 532 24 455 l
9 519 25 452 10 519 26 449 11 517 27 445 12 515 28 439 13 500 29 418 l
14 500 30 436 j
15 499 l
16 494 l-i i
i Instructionst 0.n this format, list.the-average daily unit power level in MWe-4 -
Net for each day in the reporting month.
Compute to the nearest whole megawatt.
i I
e' - '. [-.
.'~
h.k.
UNIT SHUTDOWNS AND POWER REDUCTIONS DerKET NO.:
50-338 i
UN T NAME:
NA-1 l
DATE: Dec.
7, 1992 SEPORT MONTH: Nov. 156-CONTACT:
G.
E. Kane PHONI-
!703) 894-2101 1
2 3
4 5
No.
Date Type Duration Rcason
'ethod of Licensee System Cor ponent cause & Corrective (hrs)
SNutting Event Code
- sle Action to Dccn Reactor Report #
Prevent Recurrence oNo entry this month.
1:. Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (expla 0 1= Manual Exhibit. F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain)
Exhibit H - Same Source
Page 1
of __1 I
UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:
50-338 Report Month November Unit Name:
-NA-1 Years 1992 Date: Dec.
7.
1992
Contact:
G.
E. Kane
- No entry this month, i
4 i
i i
t l ~.
i-4 i
I -
3 i
j..
l l
l I "
l lr-
l, NORTH ANNA POWER STATION UNIT NO.
1 MONTH:
November 4
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a
summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
2 i
Date Time Data l
November 01, 1992 0000 Began month with unit at 65% power, 626 MWe, in a power coastdown.
l November 30, 1992 2400 Ended month with unit at 50% power, 475 MWo.
s i
4 l
4
~.
q.*
j OPERATING DATA REPC3T 4
DOCKET NO.:
50 339 DATE: Decenber 7,1992 j
CONTACT:
G. E. Kane PHONE: (703) 894-2101 i
1 OPERATING STATUS 4
i 1.
Uni t N ame s............................... Nor t h Anna 2 2.
Rsport i ng Peri odt......................... November 1992 3.
Licensed Thermal Power (MWt):.............
2893 4.
Nameplate Rating (Gross MWe):.............
947 5.
Dasign Electrical Rating (Net MWe):.......
907 6.
Mexleun Dependable capacity (Gross MWe):..
957 j
7.
Maximum Dependable capacity (Net MWe):....
909 j
8.
If changes occur in capacity Ratings (Itees No. 3 thru 7) since last report, give reasons:
N/A 4
4 9.
Power level to which restricted, if any (Net MWe): ___N/A
- 10. Raasons for restrictions, if any:
N/A This Month Y-t-D CLnulative
- 11. H ours i n R epor t i ng Pe r i od...............................
720.0 8,040.0 104,880.0
- 12. Nunser of Hours Reac t or was Cri t ical.....................
720.0 6,5 64.3 86,300.2
- 13. Raactor R eserve Shut down Hours...........................
0.0 187.0 6,244.4 d
4
- 14. H ours G ener at or on-L i ne.................................
720.0 6,494.7 85,269.1 l
- 15. Uni t R eserve Shut down H ours..............................
0.0 0.0 0.0
- 16. Gross Thermal Energy Generat ed (MWH).................. 2,081,686.5 18.156,153.7 229,973,286.8
+
- 17. Gross Elec trical Energy Generat ed (MWH)..................
683,163.0 5,949,645.0 75,329,771.0
- 18. Ne t E lect r i cal E nergy Generat ed (MWH )....................
650,783.0 5,651,429.0 72,151,162.0 s
- 19. Unit Service Factor.....................................
100.0%
80.8%
81.3%
- 20. Unit Availability Factor.................................
100.0%
S0.8%
81.3%
- 21. Unit capacity f actor (using HDC Net).....
99.4%
77.3%
76.4%
- 22. Unit capacity Factor (using DER Net).....................
99.7%
77.5%
75.8%
- 23. F o r c ed Out a g e R a t e.......................................
0.0%
1.1%
5.6%
4 i
r i
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each)::__N/A l
)
J
- 25. If Shutdown at end of Report Period, estimated time of Startup:
N/A
- 26. Units in Test Status (Pria. to Consnercial Operation):
Forecast Achieved INITIAL CRITICAL!TY INITIAL ELECTRICITY COMMERCI AL OPERATION
.. _ - _ _. _. ~.. _..... _ _.... -.. _.. _.
g..
i AVERAGE DAILY UNIT POWER LEVEL 4
'j
{
Docket No.:
50-339 Unit:
NA-2 H
Date:
Dec.
7, 1992 j
Contact:
G.
E.
Kane j
Phone:
(703) 894-2101
)
i MONTH:
November 1992 DAY AVERAGE DAILY POWER-DAY AVERAGE DAILY LEVEL j
LEVEL (MWa-Net)
LEVEL (MWe-Net) 1 900 17 905 j
2 900 18 905
]
3 900' 19 906 l
4 903 20 891 5
905 21 904
?
6 905 22 904 j
7 905 23 904 8
906 24 904 9
905 25 904 j.
10 907 26 903 j
11 907 27 902 i
12 907
-28 903 l
13 905 29 904 14 906 30-905' 15 906
.16 906 i
I i.
i i
Instructions:
On this-format, list the average' daily unit power. level in MWe-
' Net for each day in the reporting month.
Compute _to the nearest-whole megawatt, e
1 i=
4 k
i II 1
1
.. ~..
., ~ ~
~
~ -....
UNIT SHUTDOWNS AND POWER REDUC" IONS DOCKET NO.:
50-339 UNIT NAME:
NA-2 DATE: Dec.
7, 1992 REPORT MONTH: Nov. 1992 CONTACT:
G.
E.
Kane PHONE: (703) 894-2101 1
2 3
4 5
No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs)
Shutting Event Code Code Action to Down Reactor Report #
Prevent Recurrence o No entry this month.
F 1: Type
.2: Reason 3: Method 4:
F= Forced A= Equipment. Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain)
Exhibit H - Same Source
j --.
t j.
t I
t l
1..
Page 1
of J i
i i
i UNIT SHr:TDOWN AND POWER-REDUCTIONS Explanation Sheet i
Docket No.:
50-339 i
i Report Month November Dr.it Name:
NA-2 1
4 j
Year:
1992 Date: Dec, 7,
199?
a i
Contact:
G.
E.
Kane 4
i s
l
- No entry this month.
i i
i 1
e I.
e i
h i
iij il
(
i
{
4
?
4 1
i i
i A,
1 8
4
,.-~ 4.
l'!.<
NORTH ANNA POWER STATION UNIT NO.:
2
{
MONTH:
November __
SUMMARY
OF OPERATING EXPERIENCE i
l Page 1 of'1 l
Listed below in chronological sequence is a
summary of i
operating experiences for this month which required load reductions l
or resulted in significant non-load related incidents.
1 i
Date Time Data November 01, 1992 0000 Began month with unit at 100% power, j
944 MWe.
"D" water box isolated.
l l
November _01, 1992 2052 "D" water box returned to service, j
output increased to 949 MWe.
November 01, 1992 2300
- solated "C" water box for maintenance,- output decreased to 944 MWe.
t i
November 04, 1992 1428 "C" water box returned to service, l
output increased to 950 MWe, November 20, 1992 1156 Commence rampdown to 90% power for i
TVFT.
{
1232 Unit stable at 90% power,'865 MWe.
I 1519 Commenced ramp to 100% power following satisfactory completion of TVFT.
1718 Unit stable at 100% power, 948 MWe.
{
November 30, 1992 2400 Ended month with unit at 100%- power, l
945 MWe.
l i
l i-i l
I I
. - - -., _, _. _, _. _, _.,.,.