ML20125E436

From kanterella
Jump to navigation Jump to search
Ack Receipt of 800107 Interim Deficiency Rept Re Wkm Valve Cracks.Rept Will Be Reviewed & Evaluated.Nrc Is Awaiting Final Rept
ML20125E436
Person / Time
Site: Washington Public Power Supply System
Issue date: 02/01/1980
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20125E438 List:
References
NUDOCS 8002140060
Download: ML20125E436 (1)


Text

4n atow

  • [5 'o

'gn UNITED STATES E"

NUCLEAR REGULATORY COMMISSION

d.  :. E REGION V o, [ 1990 N. CA L IFORNIA BOULEVARD

%  %# e SUITE 202, WALNUT CREEK PLAZA

+,,,e WALNUT CREE K, CALIFORNIA 94500 FEB 1 1980 Docket No. 50-460 50-513 Washington Public Power Supply System P. O. Box 958 Richland, Washington 99352 Attention: Mr. N. O. Strand Managing Director Gentlemen:

Subject:

Report on WKM Valve Cracks, WNP Nos. 1/4 (Your Letter of January 7, 1980)

Thank you for your letter, referenced above, which forwarded an interim report pursuant to 10 CFR 50.55(e) regarding the subject matter.

Your report will be reviewed and evaluated, and we are looking forward to receipt of your final report on this matter.

Sincerely,

.t. A -

R. H. Engelken Director 8002140 Obb