ML20125C607
| ML20125C607 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 12/11/1979 |
| From: | Manry M GEORGIA POWER CO. |
| To: | |
| References | |
| NUDOCS 8001100542 | |
| Download: ML20125C607 (2) | |
Text
.
s Y F. eW",W %
i m 1 RO TELEGRAM FORMAT, p'~:- :,.
P. D. CHENDIW
- c. m. Urr.ar
.f*; ~01 8AXLEY, GEORGIA 3g _
31513
- u. s. xm I&#"
PMS MR. JAMES P. O'REILLY f '2"d UNITED STATES NUCLEAR REGULATORY COMMJSSION 1
DIRECTOR OF INSPECTION AND ENFORCEMENTI f Il P 2
- 3 'l REGION II s-SUITE 3100 M
101 MARIETTA STREET
/h ATLANTA, GEORGIA 30303
SUBJECT:
HATCH UNIT i. DOCKET NO. 50-321, NOTIFICATION OF REPORTABEL OCCURRENCE NO 50-321/1979-98 t
NOTIFIED: R. Rogers DATE:
12-10-79 1
TIME:
1415 DESCRIPTION OF REPORTABLE OCCURRENCE: Non-compliance of Technical Specification 3.5.E Initial Condition j
On 12-10-79 while operating at 80% power, it was discovered that RCIC was in-operable on 12-8-79 without proving HPCI operable per Tech Specs 3.5.E.2 and without meeting shutdown requirements per Tech Specs 3.5.E.3.
RCIC tripped on High Turbine Exhaust Pressure and was properly logged by shif t personnel but shif t personnel failed to intnediately prove H,PCI operable.
HPCI has been proven operable on 12-09-79 Nature of Occurrence:
Failure to consider RCIC systeminoperable af ter a trip on high turbine exhaust pressure on 12-8-79.
Therefore, the HPCI system we,s not proven operable as require by Tech. Spec. 4.5.E.2 Also, Tech. Spec. section 3.5.E.3 was not compiled with.
Irvnediate Corrective Action:
None as far as system operability is concerned.
.Cause:
Personnel oversight 90008250 S_upplemental Corrective,_ Action:
e
_le-emphasized the importance of complying with limited condition of operation as stated in Tech. Spec.
q
'7 '
i Page 1 of 2
==-._.==.;;....._=.:...m=.___=___.=.---__,.=____a___-
.I so oli oo SN
(
S
...w.-
- s a s y MMLT -
i
_ Status of Redundant or Backup Systems:
At time of discovery, the backup system was operable as demonstrated on 12-9-79.
Impact to _0th_er Units:
None.
Operation of RCIC on Unit I has no effect on Unit two system.
Justification for ContinJed Operation:
The RCIC and HPCI system are both operable as demonstrated 12-9-79.
l 1
t hm.f/4L M. Manry Plant Manager 9000825i o
I
. =. :...==...==== =, _, _ _n_=_;..__ ===, _, _ ra L 2, G,_,,,,=,
. -