ML20117N610

From kanterella
Jump to navigation Jump to search
Industrial Pretreatment Quarterly Self-Monitoring Results
ML20117N610
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 08/13/1996
From:
CENTERIOR ENERGY
To:
Shared Package
ML20117N598 List:
References
NUDOCS 9609190311
Download: ML20117N610 (1)


Text

.

l .

l l

INDUSTRIAL PRETREATMENT QUARTERLY SELF-MONITORING RESULTS Perry Nuclear Power Plant Permit No.: 1004911 10 Center Rd. Report Date: 8/13/96 Perry, Ohio 44081 Laboratory: Electro Analytical I

Date of Sample: 8/5/96 to 8/6/96 Time of sample: 16':28 Sample Location: Sewage Pump Station Name of Sampler: Beckler Laboratory Address: 7118 Industrial Park Blvd.

Mentor, OH 44060 l

Date of Analysis: t/7 to 8/12/96 Flows 33,000 gpd i

PARAMETER SAMPLE EPA ANALYSIS ANALYSIS TYPE METHOD DATE RESULT COD Composite 410.4 8/10/96 210 mg/L BOD Composite 405.1 8/12/96 110 mg/L J

TSS Composite 160.2 8/9/96 88 mg/L Silver Composite 272.1 8/12/96 c.01 mg/L Mercury composite 245.1 8/8/96 <.50 ug/L pH Grab 150.1 8/7/96 8.3 s u.  !

Oil / Grease Grab 413.1 8/12/96 16 mg/L Gravimetric '

I certify under penalty of law that I have personally examined and I am familiar with the information in this report and that, based on my inquiry of those persons immediately responsible for obtaining the information contained in this report, I believe that the information is true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment.

9 [ G / 9 /_ Sr. Vice President - Nuclear Sign dure [ Date Title l

I .

4 A

9609190311 960913 PDR ADOCK 05000440 R PDR

,