ML20117N610
| ML20117N610 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 08/13/1996 |
| From: | CENTERIOR ENERGY |
| To: | |
| Shared Package | |
| ML20117N598 | List: |
| References | |
| NUDOCS 9609190311 | |
| Download: ML20117N610 (1) | |
Text
.
l l
l INDUSTRIAL PRETREATMENT QUARTERLY SELF-MONITORING RESULTS Perry Nuclear Power Plant Permit No.: 1004911 10 Center Rd.
Report Date: 8/13/96 Perry, Ohio 44081 Laboratory: Electro Analytical I
Date of Sample: 8/5/96 to 8/6/96 Time of sample: 16':28 Sample Location: Sewage Pump Station Name of Sampler: Beckler Laboratory Address: 7118 Industrial Park Blvd.
Mentor, OH 44060 l
Date of Analysis: t/7 to 8/12/96 Flows 33,000 gpd PARAMETER SAMPLE EPA ANALYSIS ANALYSIS TYPE METHOD DATE RESULT COD Composite 410.4 8/10/96 210 mg/L BOD Composite 405.1 8/12/96 110 mg/L J
TSS Composite 160.2 8/9/96 88 mg/L Silver Composite 272.1 8/12/96 c.01 mg/L Mercury composite 245.1 8/8/96
<.50 ug/L pH Grab 150.1 8/7/96 8.3 s u.
Oil / Grease Grab 413.1 8/12/96 16 mg/L Gravimetric I certify under penalty of law that I have personally examined and I am familiar with the information in this report and that, based on my inquiry of those persons immediately responsible for obtaining the information contained in this report, I believe that the information is true, accurate, and complete.
I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment.
9 [ G / 9 /_
Sr. Vice President - Nuclear Sign dure
[
Date Title l
I 4
A 9609190311 960913 PDR ADOCK 05000440 R
,