ML20117N601

From kanterella
Jump to navigation Jump to search
Industrial Pretreatment Quarterly Self-Monitoring Results
ML20117N601
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 06/18/1996
From:
CENTERIOR ENERGY
To:
Shared Package
ML20117N598 List:
References
NUDOCS 9609190308
Download: ML20117N601 (1)


Text

!

l* .*

INDUSTRIAL PRETREATMENT QUARTERLY SELF-MONITORING RESULTS Perry Nuclear Power Plant Permit No.: 1004911 10 Center Rd. Report Date: 6/18/96 Perry, Ohio 44081 Laboratory: Electro-Analytical Date of Sample: 6/5 to 6/6/96 Time of sample: 14:13 Sample Location: Sewage Pump Station Name of Sampler: Peders/Groh Laboratory Address: 7118 Industrial Park Blvd.

Mentor, Ohio 44060-5314 Date of Analysis: 6/6 to 6/14/96 Flows 33,000 gpd PARAMETER SAMPLE EPA ANALYSIS ANALYSIS TYPE METHOD DATE RESULT COD Composite 410.4 6/14/96 230 mg/L BOD Composite 405.1 6/12/96 75 mg/L TSS Composite 160.2 6/11/96 52 mg/L Silver Composite 200.7 6/12/96 .01 mg/L Mercury Composite 245.1 6/7/96 <.50 ug/L pH Grab 150.1 6/6/96 8.1 s.u.

Oil / Grease Grab 413.1 6/13/96 19 mg/L Gravimetric I certify under penalty of law that I have personally examined and I am familiar with the information in this report and that, based on my inquiry of those persons immediately responsible for obtaining the information contained in this report, I believe that the information is true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment.

4 '

9 [o [9 G Sr. Vice President - Nuclear Signature /

Date Title i

e u k 9609190308 960913 PDR ADOCK 05000440 R PDR

\