Monthly Operating Rept for Apr 1996 for McGuire Units 1 & 2
ML20117G601
Person / Time
Site: McGuire, Mcguire  
Issue date: 04/30/1996
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20117G593 List:
References
NUDOCS 9605210407
Download: ML20117G601 (9)


Text

.

I OPERATING E4TA REPORT DOCKET NO 50-369 DATE May 15. 1996 OPERATING STATUS COMPLETED BY R.A. Williaes TELEPHONE 704-382-5346

1. Unit Name: McGuire 1
2. Reporting Period: April 1, 1996-April 30, 1996
3. Licensed Thersal Power (MWti:

3411

4. Naseplate Rating (6foss MWelt 130$e Notes eNastplate Rating
5. Desfgn Electrical Rating (Net MWels 1180 (Gross MWel calculated as
6. Maxinus Dependable Capacity (Gross MWel:

1171 1450.000 MVA :.90 power

7. Maximus Dependable Capacity (Net MWelt 1129 factor per Page 111,
8. If Changes Occur in Capacity Ratings (Itees Nusber 3 Through 7) Since Last NURES-0020.

Report. Elve Reasons:

9. Power Level To Which Restricted, if Any (Net MWe):

10.ReasonForRestrictions,ifany:

1l i

This Month Yr.-to-Date Cumulative i

11. Hours In Reporting Period 719.0 2903.0 126359.0 l
12. Number Of Hours Reactor Was Critical 719.0 2324.5 90763.8
13. Reactor Reserve Shutdown Hours

--0--

- --0--

14. Hours Generator On-Line 719.0 2232.8 89764.3
15. Unit Reserve Shutdown Hours -

--0-- -

16. Gross Thersal Energy Generated (MWHI 2449220 7451464 282205566
17. Gross Electrical Energy Generated (MWH1 848345 2578606 96953886
18. Net Electrical Energy Benerated (MWH) 817453 2474376 92641947 l
19. Unit Service Fatter 100.0 76.9 71.0
20. Unit Availability Factor 100.0 76.9 71.0 l
21. Unit Capacity Factor (Using MDC Net) 100.7 75.5 64.0
22. Unit Capacity Factor (Using DER Net) 96.3 72.2 62.1 l
23. Unit Forced Outage Rate 0.0 2.5 13.3 l
20. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None

25. If Shut Down At End Of Report Period. Estisated Date of Startup l
26. Units In Test Status (Prior to Coseercial Operation):

Forecast Achieved l

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERAT!0N i

l 9605210407 960513 l

PDR ADOCK 05000369 R

PDR

1 t

OPERATING DATA REPORT t

l DOCKET NO 50-369 UNIT McGuire 1 DATE May 15,1996 COMPLETED BY R.A. Williams TELEPHONE 704-382-5346 s

MONTH April. 1996 E

AVERAGE DAILY POWER LEVEL E

AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1139 17 1136 2

1139 19 1136 3

1141 19 113B 4

!!41 20 1139

.5~

1136 21 1139 l

l 6

1136 22 1137 7

1137 23

!!38 j

i 8

1136 24 1135 9

1136 25 1136 18 1136 26 1137 11

!!36 27 1133 l-12

!!38 26 1133 13 1138 29 1135 l

14 1137 30 1135 i

15

!!37

'l 16 1138 l

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-369 UNIT NAME Mwulais 1 DATE ud/1d/96 REPORT MONTH April 1996 COMPLETED BY i<.

a.

williams TELEPHONE

(/uss-Juz-3346 (1)

(2)

(3)

(4)

(5)

R MET-E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE.

O P

DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S I

(1)

(2)

(3)

(4)

F Forced Reason-Method:

Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent y Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER (NUREG-0161))

D-Regulatory Restriction 4-Other (Explain)

File E-Operator Training & License Examination F-Administrative (5)

(Explain) (Explain)

Exhibit I - Same Source G-@erator Error H-Other

l..

l l

l DOCKET: 50-369 l

I l

UNIT: McGuire 1 Date:

05/15/96 t

i NARRATIVE

SUMMARY

I l'

t MONTH: April,1996 McGuire Unit I began the month of April operating at 100% full power. The unit operated at or near 100% full power for the entire month.

l 1

P' Prepared by: R. A. Williams l

i Telephone:(704)- 382-5346 l

i-

l MONTHLY REFUELING INFORMATION REOUEST 1.

Facility name:

McGuire. Unit 1 i

2.

Scheduled next refueling shutdown: February 1997 j

3.

Scheduled restart following refueling: May 1997 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or

{

other licerse amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

i 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 123 (b) in the spent fuel pool: 223 8.

Present licensed fuel pool capacity: 1463 Size of requested or planned increase: =

9. -

Projected date oflast refueling which can be accommodated by present license capacity: March 2006***

DUKE POWER COMPANY DATE: May 15.1996 Name of

Contact:

R. A. Williams Phone: (704)- 382-5346 i

. i

i l

OPERATIN6 DATA REPORT i

l DOCKET ND 50-370 DATE May 15. 1996 DPERATING STATUS COMPLETED BY R.A. Williaes TELEPHONE 704-382-5346

1. Unit Names McGuire 2
2. Rept,rting Period April 1,1996-April 30,1996
3. Licensed Thereal Power (MWt):

3411

4. Naseplate Rating (Gross flie):

1305e Notes eNaseplate Rating

5. Design Electrical Rating (Net Mue):

!!B0 (6ross MWe) calculated as

6. Matious Dependable Capacity (Gross MWe):

1171 1450.000 MVA

.90 power i

7. Maxieus Dependable Capacity (Net NWe):

!!29 factor per Page 111,-

8. If Changes Occur in Capacity Ratings (! tees Nusher 3 Through 7) Since Last NUREE-0020.

Report. Give Reasons:

l F

9. Power Level To Which Restricted, If Any (Net MWe):

I

10. Reason for Restrictions, If any:

l l

l This Month Yr.-to-Date.

Cumulative l

!!. Hours In Reporting Period 719.0 2903.0 106655.0 l

12. Nusher Of Hours Reactor Was Critical 100.4 2284.4 84040.0 l
13. Reactor Reserve Shutdown Hours -

--0--

--0--

l

14. Hours Generator On-Line 100.4 2284.4 83015.2
13. Unit Reserve Shutdown Hours

- -0-- -

i

16. Gross Thereal Energy Generated (MWH) 325181 7670644 272910293
17. Gross Electrical Energy Generated (MWH)

!!3861 2705163 95208439

18. Cbt Electrical Energy Generated (MWHI 105050 2604193 91316550 l
19. Unit Service Factor 14.0 78.7 77.8 l
20. Unit Availability Factor 14.0 78.7 77.8 l
21. Unit Capacity Factor (Using MDC Netl 12.9 79.5 75.1
22. Unit Capacity Factor (Using DER Net) 12.4 76.0 72.6
23. Unit Forced Outage Rate 0.0 0.0 6.2
20. Shutdown Scheduled Over West 6 Months (Type, Date, and Duration of Each):

Currently Refueling l

23. If Shut Doen At End Of Report Period. Estieated Date of Startup: May 15. 1996
26. tinits In Test Status (Prior to Consercial Doeration):

Forecast Achieved INITIAL CRIT!CALITY INITIALELECTRICITY COMMERCIAL OPERATION 2

i

1 OPERATING DATA REPORT DOCKET NO 50-370 UNIT McGuire 2

)

DATE May 15. 1996 COMPLETED BY R.A. Williaes i

TELEPHONE 704-382-5346 i

i MONTH April,1996 QB, AVERAGE DAILY POWER LEVEL EAL AVERAGE DAILY POWER LEVEL (MWediat)

(MWe-Neti 1

1147 17 0

)

2 1147 IB 0

3 1149 19 0

4 1090 20 0

S 11 21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

29 0

13 0

29 0

14 0

30 0

15 0

16 0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-370 UNIT NAME mwuige. z DATE u :> f 13 / y b REPORT MONTH April 1996 COMPLETED BY 4

A.

williams TELEPHONE t ius i -s oz-:>3s b (1)

(2)

(3)

(4)

(5)

R MET-E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE.

O P

DURATION O

WN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

RX NO.

CODE CODE' PREVENT RECURRENCE 1

96 5 S

618.57 C

1 RC FUELXX END-OF-CYCLE 10 REFUELING OUTAGE (1)

( 2 )~

(3)

(4) l F Forced Reason-Method:

Exhibit G - Instructions l

S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent y Sneets For Licensee C-Refueling 3-Automatic Scram Event Report ( N G-0161))

(LER D-Regulato n Restriction 4-Other (Explain)

File E-Operator Training & License Examination F-Administrative (5)

(Explain) (Explain)

G-Operator Error Exhibit I - Same Source H-Other

i.

I l

(

~

DOCKET: 50-370 l

UNIT: McGuire 2 Date:

05/15/96 I

NARRATIVE

SUMMARY

MONTH: April,1996 McGuire Unit 2 began the month of April operating at 100% full power. The unit operated at or near 100%

full power until 04/04/96 at 1855, when the unit began decreasing power to begin end-of-cycle 10 refueling outage. The unit was taken off-line 04/05/96 at 0426 for end-of-cycle 10 refueling outage. He unit was in the refueling outage the remainder of the month.

I 1

l Prepared by: R. A. Williams i

Telephone: (704)- 382-5346

/

1 MONTHLY REFUELING INFORMATION REOUEST 1.

Facility name:

McGuire. Unit 2 2.

Scheduled next refu ling shutdown: Currently Refueline 3.

Scheduled restart following refueling: May 1996 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or

[

performance analysis methods, significant changes in design or new operating procedures).

l 7.

Number of Fuel assemblies (a) in the core: 191 (b) in the spent fuel pool: 2fl9 l

8.

Present licensed fuel pool capacity: 1461 Size of requested or planned increase: =

9.

Projected date oflast refueling which can be accommodated by present license capacity:

December 2003 l

DUKE POWER COMPANY DATE: May 15.1996 l

Name of

Contact:

R. A. Williams Phone: (70 4 - 382-5346 1

. =

.