Rev 3 to 1BOS 3.1.1-10, Bimonthly,Staggered Basis,Reactor Trip Breaker Shunt & Undervoltage Trip Independence Test - Train a
ML20117G206
Person / Time
Site: Byron, Braidwood, 05000000
Issue date: 03/25/1985
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20117G150 List:
References
1BOS-3.1.1-10, 4636P, NUDOCS 8505130452
Download: ML20117G206 (4)


Text

. . ~. _

1BOS 3.1.1-10 R3visicn 3 d

BIMONTHLY, STAGGERED BASIS, REACTOR TRIP BREAKER SHUIC AND UNDERVOLTAGE TRIP INDEPENDENCE TEST - TRAIN A A. STATEMENT OF APPLICABILITY:

The purpose of this procedure is to verify the operation of the shunt trip-and the undervoltage trip of the Train A Reactor Trip Brkr and the Train B Reactor Trip Bypass Bekr in : nodes 1, 2, 3*, 4*, 5* every 62 days and after maintenance or adjustment of the Reactor Trip Brkrs. Completion of the entire surveillance will insure the compliance with the Table 4.3-1 Note 11, 18 month Independent Verification of both undervoltage and shunt trips actuation requirements.

B. REFER'IlCES:

1. Technical Specifications 3.3.1. c3,.
2. Westinghouse Solid State Protection System Vendor's manual F-108. II" C3
3. 6/20 E-1-4030RD06 [C

<C

4. 6/20 E-1-4030RD07 l3 c
5. 6/20 E-1-4208A- C,3 L!
6. 6/20 E-1-4208B .Z-
7. 6/20 E-1-4030EF23 CC r3
8. 6/20 E-1-4030EF29 I- b-C. rxz.nr.vu1 SITES:
1. Receive permission from the Shift Engineer or designated SRO licensed assistant prior to performing this surveillance by having the Data Package Cover Sheet signed and dated.
2. Communications must be established between the main control room, the auxiliary electrical equipment room (IPA 09J) and the reactor trip switch gear panel (1RD05E).
3. Test Equipment. ,
a. Pushbutton switch with leads.

APPROVED MAR 2 5 F85 I"3I

9. O. S. R.

8505130452 850507 PDR ADOCK 05000454 p PDR - --

l

IBCS 3.1.1-10 R2 vision 3 D. PRECAUTICNS:

1. This surveillance may be performed on Reactor Trip Breaker A and Bypass Trip Breaker B only.
2. No radio communications s!all be used in the Auxiliary Electrical Equipment room.
3. This procedure will oren Reactor Trip Breaker A. Bypass Trip Breaker A must be closed dun ng execution of steps 4 through 21 to avoid a reactor trip.

E. LIMITATICNS AND ACTIONS:

1. In the event that the acceptance criteria is not met during the performance of this surveillance, IlEEDIATELY notify the Shift Engineer to initiate ICCAR BOS 3.1-la.
2. The two hour time limit for surveillance testing begins when Reactor Trip Bypass Breaker A (BYA) is racked to CONNECT position and CLOSED.

F. MAIN BODY: J 7

    • emenee******************************************************** C
  • CAUTION
  • _
  • DO NOI PROCEED WITH THIS PROCEDURE UNLESS THE GENERAL
  • h'

...............**e***ne....e**..***e......**********...... l

<~~

1. VERIFY that MCB General Warning annunciator 04B03 is CLEAR E C:

UNDERVOLTAGE TRIP h 7

2. VERIFY / RACK to CONNECT and CLOSE Reactor Trip Breaker A (RTA) at 1RD05E. c.,,,
3. RACK to the TEST and CLOSE Reactor Trip Bypass Breaker B (BYB) at C 1RD05E.

a eenneme**e *****eme ***eneeene***********e *********************

  • NCffE *
  • - The two hour time limit for surveillance testing begins *
  • to CONNECT and CLOSED. *

...e***ee.................e**eeme******e **eemene............. .

4. RACK to CONNECT and CLOSE Reactor Trip Bypass Breaker A (BYA) at 1RD05E and record the time.

TIME 1 1

5. PLACE the " Logic A" Test Switch at 1PA09J, Logic Test Panel in position 7.

APPROVED

- MAR 25 885 ~

(4636P)

B. O. S. R.

y , - - w--,, ,, n . , , , ,,. , --.+~e--w -

v.,-

1BCS 3.1.1-10 Ravision 3 c6. DEPRESS and HOLD any two of the four Manual Test Input pushbuttons at IPA 09J Logic Test Panel to actuate the Undervoltage Trip and VERIFY the following:

a. Reactor Trip Breaker A (RTA) is CPEN at 1RD05E.
b. Reactor Trip Bypass Breaker B (BYB) is OPEN,at 1RD05E.
7. RELEASE the two Manual Test Input pushbuttons at IPA 09J Logic Test Panel and PLACE the Logic A Test switch at IPA 09J Logic Test Panel in the OFF position.

INDEPENDENT VERIFICATION  %

C SHUNT TRIP. t C

8. CLOSE Reactor Trip Breaker A (RTA) at 1RD05E _

L.

9. CLOSE Reactor Trip Bypass Breaker B (BYB) at 1RD05E. -
10. INSTALL a pushbutton test switch between terminals TB3-12 (BYBO) and <

TB3-9 (BYBT) at 1RD05E Cab. 1. M CC

11. DEPRESS the test pushbutton to actuate the shunt trip to Reactor Trip C Bypass Breaker B (BYB). ha e.:.

~

d12. VERIFY Reactor Trip Bypass Breaker B (BYB) is OPEN at 1RD05E.

C

13. REMOVE the test pushbutton switch between terminals TB 3-12 (BYBO) O

~

and TB3-9 (BYBT) at 1RD05E Cab. 1.

14. INSTALL a test pushbutton switch between terminals TB3-2 (RTAP) and TB3-5 (RTAT) at 1RD05E Cab. 2.
15. DEPRESS'the test pushbutton to actuate the shunt trip to Reactor Trip dreaker A (RTA).

416. VERIFY Reactor Trip Breaker A (RTA) is OPEN at 1RD05E.

- 17. R N- the test pushbutton switch between terminals TB3-2 (RIAP) and

> TB3-5 (RTAT) at 1RD05E Cab. 2. ,

1 T 18. WITHDRAW Reactor Trip Breaker A (RTA).

i a .g> E T

,0 g.~c Z 19. RECORD the number displayed on the Reactor Trip Breaker (RTA) g cn O counter. Counter reading .

< 20. RACK Reactor Trip Breaker A (RTA) to the CONNECT position.

m g 21. CLOSE Reactor Trip Breaker A (RTA) at 1RD05E.

INDEPENDENT VERIFICATION

            • ene*************eeeeee********enee********enene***eeene **
  • CAUTION *
  • menee*****e****ee ****ee************************************** e, (4636P)

IBOS 3.1.1-10 R2 vision 3 i

22. OPDJ cnd RACK to DISCONNECT Ructor Trip Bypisa Besakir A (DYA) at l 1R205E and record the time . I TIME INDEPENDENT VERIFICATION
23. WITHDRAW Reactor Trip Bypass Breaker A (BYA).
24. RECORD the number displayed on the Reactor Trip Bypass Breaker A (BYA) counter. Counter reading .
25. RACK to DISCCNNECT Reactor Trip Bypass Breaker B (BYB) at 1RD05E.

INDEPENDENT VERIFICATICN G. ACCEPTANCE CRITERIA:

1. This surveillance test shall be considered acceptable if Reactor Trip Breaker A (RTA) and Reactor Trip Bypass Breaker B (BYP) trip on both an undervoltage and a shunt trip actuation.

>- 1 z

O z

O M

c:

O I

z c::

O u

APPROVED MAR 25 885 (4636P)

B. O. S. R.