Interim Deficiency Rept (55(e)-85-09) Re Issuance of Trim Design Details by Itt Grinnell Engineering W/O Approved Design Drawings.Initially Reported on 850306.Investigation Continuing.Final Rept Will Be Submitted by 850927
ML20116D606
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 04/08/1985
From: Mangan C
NIAGARA MOHAWK POWER CORP.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
(55(E)-85-09), (55(E)-85-9), (NMP2L-0380), (NMP2L-380), NUDOCS 8504290484
Download: ML20116D606 (2)


Text

.-...

,n_

NUMOHAWK Y NIAGARA NBAGARA MOHAWK POWER CORPORATION /300 ERIE BOULEVARD WEST, SYRACUSE, N Y.13202/ TELEPHONE (315) 4741511 April 8, 1985 (NMP2L 0380)

Mr. R. W. Starostecki, Director U.S. Nuclear Regulatory Commission Region I Divisi0n of Project and Resident Programs 631 Park Avenue King of Prussia, PA 19406 RE: Nine Mile Point - Unit 2 Docket No. 50-410

Dear Mr. Starostecki:

Enclosed is an interim report in accordance with 10CFR50.5S(e) for the problem concerning issuance of trim design details by ITT Grinnell without approved design drawings.

This problem was reported via tel-con to J. Linville of your office on March 6,1985.

Very truly yours, C V Vice President Nuclear Engineering and Licensing CVM/GG/cla

( 0882H) xc: Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 2055S R. A. Gramm, NRC Resident Inspector Project File (2) 8504290484 850408 t

PDR ADOCK 05000410 t

S PDR

't A

r NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT - UNIT 2 DOCKET NO. 50-410 Interim Report for a Problem Concerning Trim Design Details

( 55(e )-85-09)

Description of the Problem During a review of a planner package by ITT Grinnell Quality Assurance and the Authorized Nuclear Inspector, it was discovered that ITT Grinnell Engineering had issued trim design detail s to Construction wi thout approved design drawings.

ITT Grinnell used a s tandard detail from Speci fication hb.

WP2-P301C which did not apply. A specific design drawing was required.

The matter is still under investigation, and a final report will be submitted by September 27, 1985.

~

..