. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-293 UNIT Pilarim 1 DATE April 12, 1985 COMPLETED BY P. Hamilton TELEPHONE (617)746-7900 MONTH March 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

-(MWe-Net) (MWe-Net) 1 667. 17 0.

2 667. 18 0.

3 666. 19 0.

4 667. 20 172.

5 667. 21 560.

6 669. 22 642.

7 665. 23 668.

8 644, 24 666.

9 439. 25 667.

10 640. 26 667.

11 665. 27 668.

12 667. 28 669.

13 668. 29 666.

14 667. 30 668.

15 367. 31 667.

16 0.

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each

' day in the reporting month. Compute to the nearest whole megawatt.

ph p** M 3 % h' p

OPERATING DATA REPORT

- , a DOCKET NO. 50-293 DATE April 12.1985 j COMPLETED BY P. Hamilton TELEPHONE (617)746-7900 OPERATING STATUS

1. Unit Name Pilarim 1 Notes ,
2. Reporting Period March 1985 l
3. Licensed Thernal Power (MWt) 1998
4. Nameplate Rating (Gross MWe) 678
5. ' Design Electrical Rating (Net MWe) 655
6. Maximum Dependable Capacity (Gross MWe) 683
7. Maximum Dependable Capacity (Net MWe) 663
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

None

9. Power Level To Which Restricted, If Any (Net MWe) None
10. Reasons For Restrictions, If Any N/A This Month Yr-to-Date Cumulative
11. Hours In Reporting Period 744.0 2160.0 107904.0
12. Number Of Hours Reactor Was Critical 636.0 1732.0 71648.6
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 628.5 1654.8 69223.3
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1211568.0 2834304.0 119786112.0
17. Gross Electrical Energy Generated (MWH) 419100.0 971980.0 40204194.0
18. Net Electrical Energy Generated (MWH) 403323.0 933952.0 38630879.0
19. Unit Service Factor 84.5 76.6 64.2
20. Unit Availability Factor 84.5 76.6 64.2
21. Unit Capacity Factor (Using MDC Net) 81.8 65.2 54.0
22. Unit Capacity Factor (Using DER Net) 82.8- 66.0 54.7
23. Unit Forced Outage Rate 14.7 22.2 9.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None

25. If Shut Down At End Of Report Period, Estimated Date of Startup -
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY l

INITIAL ELECTRICITY COMMERCIAL OPERATION __

(9/77) l

REFUELING INFORMATION The following refueling information is included in the Monthly Report as requested in an NRC letter to 8ECo, dated January 18, 1978:

For your convenience, the information supplied has been enumerated so that each number corresponds to equivalent notation utilized in the request.

1. The name of this facility is Pilgrim Nuclear Power Station, Docket Number 50-293.
2. Scheduled date for next Refueling Shutdown: August 1986
3. Scheduled date for restart following refueling: November 1986 >

4.

5. Due to their similarity, requests 4, 5, & 6 are responded to collectively:
6. The new fuel, which was loaded during the 1983-84 refueling outage, is of the same P8x8R design, as loaded the previous outage and consists of 160 P8DRB282 assemblies. In addition, 32 GE6B-P80RB282 assemblies were also loaded.
7. (a) There are 580 fuel assemblies in the core.

(b) There are 1,128 fuel assemblies in the spent fuel pool.

8. (a) The station is presently licensed to store 2320 spent fuel assemblies. The actual spent fuel storage capacity is 1770 fuel assemblies at present.

(b) The planned spent fuel storage capacity is 2320 fuel assemblies.

9. With present spent fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 642 fuel assemblies.

4

,m -- + - , , - - - . ,,--------,,,,n,, -- - - - - , - - , , ,- -. - - , - - -

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-293 UNIT NAME Pilarim 1 DATE April 12, 1985 COMPLETED BY P. Hamilton TELEPHONE (617) 746-7900 REPORT MONTH March 1985 METHOD OF LICENSE CAUSE & CORRECTIVE DURATION SHUTTING EVENT SYSTEM COMPONENT ACTION TO NO. DATE TYPEl (HOURS) REASON 2 DOWN REACTOR 3 REPORT # CODE 4 CODES PREVENT RECURRENCE 8 3/9/85 F N/A B N/A N/A N/A N/A Power reduced for backwash and maintenance.

9 3/15/85 F 115.5 A 3 85-006 JE V Stuck Yarway valve was replaced.

1 2 2 3 4&5 F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

& License Examination 9-Other (LER) File (NUREG-1022) t 9

A

~

BOSTON EDISON COMPANY PILGRIM NUCLEAR POWER STATION DOCKET NO. 50-293 Operational Summary for March 1985 The month commenced with the unit.at 100% power which was maintained until the ninth when power was reduced for a condenser backwash and maintenance on the "B" travelling screen. Subsequent to completion of these tasks, the unit was returned to-100% power on the tenth and maintained at that level until the fifteenth.

On the fifteenth, a reactor scram occurred during surveillance testing of the reactor water level safeguards system (Ref.: LER 85-006). While shut down, maintenance was performed on the reactor water sample system and secondary containment dampers (Ref.: LER 85-007).

Upon completion of maintenance activities, the unit was returned to service on the twentieth at approximately 0830 hours0.00961 days <br />0.231 hours <br />0.00137 weeks <br />3.15815e-4 months <br />. Power was steadily increased to an average daily level of 100% by the twenty-third and maintained at that level until the end of the month.

Safety Relief Valve Challenges Month of March 1985 Requirement: NUREG-0737 T.A.P. II.K.3.3 There were no safety relief valve challenges during the month.

Month March 1985 PILGRIM NUCLEAR POWER STATION MAJOR SAFETY RELATED MAINTENANCE CORRECTIVE ACTION SYSTEM COMPONENT MALFUNCTION CAUSE MAINTENANCE TO PREVENT ASSOCIATED RECURRENCE LER i RPS Yarway Unit Scram Sticky Valve Replaced valve Plan to modify 85-006

Valve manifold. system.

DPIS-261-72A HVAC Secondary Inoperable Broken Drive Replaced drive Plan to modify 85-007 (To Containment Gears gears. system. be issued.)

Isolation

] Dampers

} Rx Wtr. Rx Water Would not meet Burr on Rebuilt solenoid; Rebuilt valve. N/A i Sample Sample Valve timing Actuator removed burr.

1 A0-220-44 requirements. stem.

4 i Main M.S. Drain Inoperable Thermal Installed Recommended valve N/A i Steam Line Binding new motor. be left open i Isolation during shutdown.

valve M0-220-1 Main Acoustic Alarm after Unknown Verified circuitry N/A N/A Steam Monitor sc ram, as satisfactory.

203-3B Core Core Spray Would not Broken Bolt. Installed new Monitor weekly. N/A Spray Test Valve fully close. in Bonnet bolts and M0-1400-4A torqued.

e

'l O $

4

e BOSTON EDISON COMPANY

. 800 BOYLETON STREET

. BOSTON, MASEACHUSETTu 02199 WILLIAM D. HARRINGTON esmoomviss passiesnt NYSLSAR April 12 ,1985 BECo Ltr. #85- 072 Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Comission Washington, D.C. 20555 Attn: Document Control Desk License No. DPR-35 '

Docket No. 50-293

Subject:

March 1985 Monthly Report

Dear Sir:

In accordance with PNPS Technical Specification 6.9. A.2, a copy of the Operational Status Summary for Pilgrim Nuclear Power Station is attached for your inforraation and planning.

Respectfully submitted, W. D. Harrington

caw Attachment cc: Regional Administrator, Region I U.S. Nuclear Regulatory Comission 631 Park Avenue King of Prussia, PA 19406 .

. .,