ML20114B579

From kanterella
Jump to navigation Jump to search

Informs That Permanent Source of Emergency Power Supply Available to Technical Support Ctr as of 850110,per Item 5A of 840703 Confirmatory Order
ML20114B579
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/22/1985
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Harold Denton, John Miller
Office of Nuclear Reactor Regulation
References
NUDOCS 8501290340
Download: ML20114B579 (1)


Text

r O

l%SC00 Sin Electnc mra cwmr 231 W. MICHIGAN, P.O. BOX 2046. MitWAUKEE, WI 53201 January 22, 1985 Mr.

H.

R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D.

C.

20555 Attention:

Mr. J. R. Miller, Chief Operating Reactors, Branch 3 Gentlemen:

DOCKET NOS. 50-266 AND 50-301 EMERGENCY PCNER SUPPLY FOR TECHNICI.L SUPPORT CENTER POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Item SA of the NRC's Confirmatory Order dated July 3, 1984 committed Wisconsin Electric Power Company to have a permanent emergency power supply available to the Technical Support Center (TSC) by December 1984.

Our letter dated December 12, 1984 requested an extension until January 21, 1985 due to equipment delivery delays.

The purpose of this letter is to inform you that as of January 10, 1985 a permanent source of emergency power has been available to the TSC.

Very truly yours, V

fG Vice Presi nt-Nuclear Power C. W.

Fay Copy to NRC Resident Inspector 0

i o