ML20114B451

From kanterella
Jump to navigation Jump to search
Inservice Insp Rept for 840919-22 Re Exams Performed on Circumferential Pipe Welds to Determine If Oxygenated Borated Water Stagnated Inside Welds to Prevent Transgranular Stress Corrosion Cracking
ML20114B451
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 01/03/1985
From: Mary Anderson, Krause G
NORTHERN STATES POWER CO.
To:
Shared Package
ML20114B443 List:
References
NUDOCS 8501290185
Download: ML20114B451 (29)


Text

_ - _ . . -_ .-

PRAIRIEISLAND NUCLEAR l '

, GENERATING PLANT i Red Wing, Minnesota r

l UNITS 1 ANO 2 l l

4 l

i h

wwweAcous. sr.eaut

"'4'al!T1, i

INSERVICE INSPECTION - EXAMINATION

SUMMARY

PRAIRIE ISLAND NUCLEAR GENERATING PLANT - UNIT 1 l SEPTEMBER 19, 1984 THRU SEPTEMBER 22, 1984 4

NS8'E8cPo!385SSa o  ;

enn NORTHERN STATES POWER COMPANY l MINNEAPOUS. MINNESOTA Report Date: Cour.ercial Service Date:

1/3/05 Dece'nber 16, 1973 LCD100484RLA01-6M i

. PRAIRIEISLLND NUCLEAR l

GENERATING PLANT Red Wing, Minnesota UNITS 1 AND 2 l

h i

nHMwg APOLl1 e 17. Pat;L s

"'J'e #!'"*l, INSERVICE INSPECTION - EXAMINATION

SUMMARY

PRAIRIE ISLAND NUCLEAR GENERATING PLANT - UNIT 1 SEPTEMBER 19, 1984 THRU SEPTEMBER 22, 1984 i

e NORTHERN STATES POWER COMPANY MINNEAPOLIS. MINNESOTA Report Date: Commercial Service Date:

1/3/85 December 16, 1973 LCD100484RLA01-6M

)

l i

l NORTHERN STATES POWER COMPANY PRAIRIE ISLAND NUCLEAR GENERATING PLANT - UNIT 1

, INSERVICE INSPECTION - EXAMINATION

SUMMARY

SEPTEMBER 19, 1984 THRU SEPTEMBER 22, 1984 INSPECTION PERIOD 3 Report Date: Prepared by: L C Dahlman 1/3/85 M&SP Spe ialist Reviewed by:

M T Anderson M&SP Engineer Commercial Service Date: y

, December 16, 1973 Approved by: fagw. dws -

G T-Krause Superintendent, Materials and Special Processes LCD100484RLA01-6M

l Inservice Inspection - Examination Summary

~

PRAIRIE ISLAND NUCLEAR GENERATING PLANT - UNIT 1

, - INDEX -

1.0 INTRODUCTION

2.0

SUMMARY

3.0 DISCUSSION OF EXAMINATION 3.1 Inspection Boundary 3.2 Examination Methods 3.3 Examination Procedures 3.4 Equipment and Materials 3.5 Personnel 3.6 Evaluation 3.7 Examination Reports and Documentation APPENDIX A - ASME Class 2 Examinations Inservice Inspection - Examination Summary Tables Table S2.2.1 - Piping - Circumferential Butt Welds Table II - Baseline Comparison Summary Table III - Isometric Drawing Summary

. APPENDIX B -

l Table I - Personnel Listing Table II - Ultrasonic Calibration blocks Table III - Procedure Listing Table IV - Equipment and Materials APPENDIX C - Form NIS-1, Owner's Data Report for Inservice Inspections i

l .

l LCD100484RLA01-6M

INSERVICE INSPECTION - EXAMINATION

SUMMARY

PRAIRIE ISLAND NUCLEAR GENERATING PLANT - UNIT 1 SEPTEMBER 19, THRU SEPTEM3ER 22, 1984

1.0 INTRODUCTION

This report sunnarizes the inservice inspection examinations performed at Prairie Island Nuclear Generating Plant - Unit 1. This inspection was conducted during the period from September 19 thru September 22, 1984, in response to the NRC Staff Evaluation Meeting documented April 18, 1983.

Specifically, item 5 of Section 6 s.tates that ten welds will be examined every six months. The examinations were performed with the Unit in operation. Prairie Island - Unit 1 began commercial operation on December 16, 1973.

The examinations were performed on circumferential pipe welds in portions of the Safety Injection system that were identified as containing stagnant oxygenated borated water, and selection was based on those welds that are considered the most susceptible to trans-granular stress corrosion cracking.

Northern States Power Company contracted Lambert, MacGill, Thomas, Inc. to perform the examinations. Hartford Steam Boiler Inspection and Insurance Company, representing ANI, provided the Authorized Inspection.

2.0 INSPECTION

SUMMARY

The results of the nondestructive, (ultrasonic), examinations performed during this inspection revealed no relevant indications which might affect the integrity of the system. However, while performing these examinations UT personnel noted a small build-up of white residue located at 12:00 on the valve side of weld #W-86W. (It should be noted that ultrasonic examinations of pipe-to-valve welds from the cast, stainless steel valve side are impractical and generally not performed.)

The white residue, presumed to be dried boric acid solution, was removed and a very small, (barely discernable), leak was visible. The leak was approximately 1/2 inch from the weld centerline, valve side, with an approximate length of 1/32 inch. This through wall discontinuity was consequently weld repaTred and a visual inspection of the oppposite boric acid supply valve was performed.with no other evidence of leakage being

, observed.

3.0 DISCUSSION OF EXAMINATION 1

.LCD100484RLA01-6M Page 1 of 3

~

q l

i 3.1 Inspection Boundary The examination plan focused on piping circumferential butt welds in l portions of the Safety Injection system containing stagnant oxygenated l borated water. This piping consists of 8" diameter, Schedule 10 (0.148" wall) and 12" diameter, Schedule 10 (0.180" wall) austenitic stainless steel. The components examined and the examination report numbers are sunnarized in the attached Appendix A - ASME Class 2 Examinations, Table S2.2.1.  ;

3.2 Examination Methods Ultrasonic examination methods and techniques were used to perforn the volumetric examinations. The ultrasonic test system consisted of an ultrasonic digital / analog tester and a two-channel strip chart re-corder. One channel of the recorder was calibrated to represent ultrasonic screen height brated to indicate (amplitude))and metal path (range to thethe secondThis reflector. channel was cali-approach gives a permanent record of the examinations and allows further evalua-tion of any indications by the contractor's Level III ard Northern States Power Company.

The ultrasonic techniques utilized miniature (1/4" x 1/4"), 5.0 MHz transducers. These were mounted on high temperture wedges which provided refracted shear wave angles of 45 degrees and 52 degrees in the parts to be examined. A 2-1/2 V metal path was used for all examinations.

All visual examinations vere aided, when necessary, with artificial lighting and verified for adequacy with an 18% neutral gray card containing a 1/32" black line.

3.3 Examination Procedures The ultrasonic examination procedure for pipe welds complied with the reouirements of Appendix III of ASME Section XI issued in the Winter 1974 Addenda. All other examination procedures complied with the requirements of the 1974 Edition through and including the Summer 1975 Addenda of ASME Section XI. A listing of the procedures used for the examinations is shown in Table III of Appendix B.

3.4 Equipment and Materials All equipment and expendable materials used in the examinations are listed either by serial number or type along with their respective calibration date or batch number in Table IV of Appendix B.

The ultrasonic calibration standards used in the examinations are listed in Table II of Appendix B. These standards are owned and maintained by Northern States Power Company at the plant site.

'LCD100484RLA01-6M Page 2 of 3

3.5 Personnel Northern States Power Company Company contracted Lambert, MacGill, Thomas, Inc. to perform the ultrasonic examinations. Hartford Steam Boiler Inspection and Insurance Company, representir.g ANI, provided the Authorized Inspection.

All personnel involved in the performance or evaluation of examinations are listed along with their title, organization, and ASMT Level of certification in Table I of Appendix B.

Certifications for examination personnel are maintained on file by Northern States Power Company.

3.6 Evaluation Any indications disclosed in the examinations were evaluated by the examiner at that time in accordance with the rules of the procedure and ASME Section XI.

The ultrasonic examiner was aided in his evaluation by a calibration performed on a standard reference before each day's examination, checked before and after each individual examination, and at intervals not exceeding four (4) hours. In addition, the ultrasonic data was recorded on strip charts which were made a part of the inspection report, and permitted further evaluation.

3.7 Examination Reports and Documentation All examinations reports and documentation are maintained on file by Table S2.2.1 of Appendix A identifies Northern Statesreport the examination Power Company number s) for(.each item examined. Many of the items identify more than one examination report because of the different types of examinations performed on the item.

Table 52.2.1 of Appendix A summarizes all the examinations that have been performed to date and identifies the amount that will be examined in the future to complete the ten year examination requirements. For retrieval purposes, the prefix of the inspection report number corre-I sponds with the year that the inspection was performed. The examina-l t

tion report numbers for this outage are prefixed with "84 ".

l Table II of Appendix A compares the baseline examination results with

, the results obtained during this examination. Table III of Appendix A identifies the isometric drawings that were used for the examinations.

The personnel, ultrasonic calibration blocks, procedures, equipment and

' materials that were used for the inspection are identified in the

, tables of Appendix B. Appendix C contains the Form NIS-1, titled.

l "0wner's Data Report for Inservice Inspections".

LCD100484RLA01-6M Page 3 of 3

f e

9 APPENDIX A -

ASME CLASS 2 EXAMINATIONS O

. LCD100484RLA01-6M

T

t. . *
  • i Fora 9-0034,Rev 0 (H&SP 5.2)

NORTHERN STATES POWER CO. TABLE S221 PRAIRIE ISLAND UNIT 1 _ _ _ . .

PAGE I Op 8 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIPING-CIRCUMFERENTIAL BUTT, WELDS SU8 M E S M

, IW. R EO'D. AMT. ITEM INSPECTION ITEM PER. AMT, EXAM IDENTIFSCATION GORY ITEM TO SE EXAM 6NED REPORT NO.

C2.1 C-G CIRCUMFERENTIAL BUTT WELDS MAIN STEAM A 32-MS-1 -

MAIN STEAM B 32-MS-2 - - -

MAIN STEAM A 30-MS-1 TWO 1 1 MS-7 79-125, 128 MAIN STEAM B , -

30-MS-2 - - -

MAIN STEAM A 31-MS-1 ONE 1 1 MS-12 77-25, 30 MAIN STEAM B 31-MS-2 - - -

MAIN STEAM A RELIEF HDR, 30-MS-1 - - -

MAIN STEAM B RELIEF HDR, 30-MS-2 THREE 1 1 MS-186 81-162, 189 MAIN STEAM A 6-MS-1 TWO 4 4 MS-147 80A-1, 14 MS-148 80A-3, 13 MS-149 80A-2, 12 MS-150 80A-10, 34 MAIN STEAM B 6-MS-2 ONE 1 1 MS-136 77-22, 8 TWO 4 4 MS-135 80A-4, 16 MS-136 80A-7, 17 MS-137 80A-5, 15 MS-138 80A-6, 44 ro = = i n-a. i. .ii*

LC0010583RLA13-LT

l Fo m 9-0034,Hev.0 (H&SP 5.2)

NORTHERN STATES POWER CO. TABLE' S2.2.1 PRAIRIE ISLAND UNIT _ l PAGE 2 OF U INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITFM: PIPING-CTRCUFIFERENIIAL uull WELDS SUS ITEM gpy Eh" INSP.

PER, REQ'D.

AMT.

AMT.

EXAM ITEM INSPECTION GORY ITEM TO BE EXAMINED IDENTIFlCATION REPORT NO.

C2.1 C-G (CONT'D)

FEEDWATER A 16-FW-12 THREE 1 -

2 FW-144, 164 81-144,179,90,75,87 -

16-FW-13 TWO 18 19 FW-147 79-129 FW-161, 162 79-SP-5,4 FW-164 79-SP-2,1/80A-26,78 81-104 FW-164 82-029, 068, 087 FW-164 83C-001, 00lR, 003, 006, 117 FW-148 79-SP2-1,72,74,105 FW-149 79-SP2-1,9,60,106 FW-150 79-SP2-1,10,61,107 FW-227 79-SP2-6,6R,ll,65, 108/80A-31, 50 FW-151 79-SP2-1,12,64,109 FW-152 79-SP2-1,13,69,110 FW-153 79-SP2-5,14,68,111 FW-154 79-SP2-1,15,67,112 FW-155 79-SP2-1,16,71,113 FW-156 79-SP2-1,17R,85,114 FW-157 79-SP2-1,4,55,115 FW-158 79-SP2-1,21,59,116 FW 159 79-SP2-7,7R,22,52, 117, 97, 98, 99 FW-159 Baseline 79-SP2-103,104,118 FW-159 80A-24, 48 FW-160 79-SP2-8R,23,63,119/

80A-25, 49 79-SP2-2,53,24,120 FW-213 FW-161 79-SP2,2,25,57,121 FW-162 79-SP2-2,26,56,122 FW-164 79-SP2-2,28,58,123 con ir m ..n.

LCD010583RLA13-LT

\

Form 9-0034,Rav.0 (H&SP 5.2). .

NORTHERN STATES POWER CO. S2_2.1 TABLE PRAIRIE ISLAND UNIT 3 1 PAGE OF 8 INSERVICE. INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIPING-CIRCUMFERENTIAL BUTT WELDS-SUG #

DE IPT INSP. R EO'D. AMT. ITEM ITEM PER. INSPECilON GORY - ITEM TO SE EXAM 8NED MT. EXAM IDENTMilON REPORT M C2.1 C-G (CONT'D)

FEEDWATER B 16-FW-15 ONE 1 1 FW-220 77-15, 9 16-FW-16 TWO 4 4 FW-214, FW-216 79-SP-7, 8, 1 FW-214 79-SP2-19, 32, 70 FW-216 79-SP2-19,30,79,125/

80A-23, 51, 52, 105 THREE - -

FW-216 81-89, 76, 76R, 88 FW-216 82-023, 030, 030R, 067, 088 FW-216 83C-002,002R,004, 005,118 FEEDWATER A (8 IN) 3-AF-11 'TWO 2 2 FW-165, AFH-202 79-SP-17, 18 FW-165, AFW-202 79-SP2-127, 128 FEEDWATER B (8 IN) 3-AF-12 TWO 2 2 FW-127, AFW-129 79-SP-19, 20 FW-127, AFW-129 79-SP2-129, 130 REFUELING WATER STORAGE TANK DISCHARGE 14-SI-1 TWO 1 1 W-195 80-60 THREE 1 1 W-178 81-198 12-SI-3A TWO 2 2 W-186, W-261 80-54, 55 THREE 2 4 W-184, 83-82, 104, 40 W-261, 186 83-67, 105, 68, 116 "

W-187 83-69, 117 12-51-38 TWO 1 1 W-194 80-56 THREE 1 4 W-194, 258 83-74, 122, 73, 121 W-191, 190 83-71, 120, 72, 119 Fosene s p.aers e/re LCD010583RLA13-LT

\

v . . .

Form 9-0034,Rcv.0 (E SP 5.2)

NORTilERN STATES POWER CO. TABLE S2 2 1 PRAIRIE ISLAND UNIT- __ l --

PAGE 4 OF 8 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIPING-CIRCUMFERENTIAL BUTT WELDS SOS T INSP. REO'D. AMT. ITEM ITEM DE 8PT 8MSPECTION GORY ITEM TO BE EXAMONED R. MT. EXAM WENW M em RENT W.

C2.1 C-G (CONT'0) 12-SI-11 THREE 1 1 W-187 81-30 7 W-188, 189 83-070, 118, 83, 161 W-100, 101 83-84, 129, 85, 123 W-102, 103 83-86, 124, 90, 128 W-104 83-89, 125 1 W-104 838-002, 006 1 W-103 84A-013, 014 12-SI 4 TWO 1 1 W-196 80-57 THREE 1 1 W-202 82-076, 092 10-SI-8 STREAM 1 TWO 1 1 W-206 80-50 STREAM 2 THREE -

1 W-213 82-089, 090 CONTAINMENT SUMP 8 DISCHARGE LINES 14-SI-33A - - -

14-SI-338 - - -

12-SI-34A - - -

12-SI-348 TWO 1 1 W-5 80-82 ALTERNATE CONTAINMENT SPRAY PUMP SUCTION 6-RH-10A BRANCH 1 TWO 1 1 W-269 80-53 l BRANCH 2 TWO 2 2 W-5 80-65 -

l W-7 80-67 6-RH-10B BRANCH 1 TWO 2 2 W-230, W-270 80-52, 51 THREE 2 2 W-229, W-283 81-66, 65 LCD010583RLA13-LT

/

m a

  • Forms 9-0034,Rev.0 (ESP 5.2)

NORTHERN STATES POWER CO. TABLE S2.2.1 PRAIRIE ISLAND UNIT _. l.- PAGE 5 OF 8 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIPING-CIRCUMFERENTIAL BUTT WELDS sua ITEM j", T ,$,i, g 7 IW. MR M T. ITEM INWECT M GORY ITEM TO SE EXAMINED MR. M T. EXM MNTmTM REMT M.

, C2.1 C-G' (CONT'D) i BRANCH 2 TWO 2 2 W-113, W-128 80-33, 66 THREE 1 1 W-129 81-64 RESIDUAL HEAT REMOVAL DISCHARGE 12-RH-6A TWO 1 1 W-17 80-81 12-RH-6B TWO 1 1 W-6 80-83

~

8-RH-9A TWO 1 1 W-112 80-46

. 8-RH-98 TWO 2 2 W-195, W-193 80-21, 22 THREE 1 1 W-243 81-45 I

' ~

8-RH-7A TWO 1 2 W-88, 89 80-49, 47 1

9-RH-78 TWO 3 3 W-138,W-206,W-143 80-19, 23, 20 SAFETY INJECTION

PUMPS SUCTION

+

6-SI-13A TWO 1 1 W-17W 80-3

! 6-SI-13B TWO 2 2 W-134, 141W 80-58, 2 1

8-SI-17 TWO 2 2 W-239, W-99 80-97, 95 THREE 1 1 W-98 81-32

! 4 W-99, 239 83-55, 61, 54, 60 W-98, 97 83-56, 59, 51, 58 1 W-97 84-001, 011 1 W-99 84A-002, 016 8-SI-18 TWO 7 7 W-243, 235, 236 80-96, 99, 104 W-74, 75, 80, 81 80-106,107,105,103 THREE 2 2 W-68/W-58 81-67/83-98,42 56 W-92, 91 83-52, 20, 48, 19

. W-238, 86W 83-49, 18, 32, 17 W-85, 243 83-34, 46, 53, 62 W-94, 237 83-57, 63, 64, 141 ro== or e <* . ire LCD010583RLA13-LT

\

t , . ,

Form 9-0034,Hev.0 (H&SP 5.2)

NORTHERN STATES POWER CO. TABLE S2.2.1 PRAIRIE ISLAND UNIT _ - _1 PAGE 6 OF 8 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIPING-CIRCUMFERENTIAL BUTT WELDS.

sus LTEM M

GORY

% o",E ,p S EM 8 TEM TO SE EXAM 6NED INSP.

PER.

R E O'D.

AMT.

AMT.

EXAM BTEM IDENTIFICATION INSPECT 80N REPORT NO.

C2.1 C-G (CONT'D)

W-88, 87 83-65, 140, 66, 47 W-235, 83 83-33, 50, 28, 26 W-234, 236 83-24, 25, 23, 16 W-81, 80 83-22, 15, 21, 14 W-79, 78 83-12, 9, 11, 7 W-76, 77 83-10, 3, 2, 4, 5 W-75, 74 83-6, 8, 75, 142 W-73, 72 83-87, 143, 88, 147 W-71, 70 83-91, 149, 92, 150 W-233, 69 83-93, 155, 94, 156 W-68, 67 83-101,152,102,153 W-66, 64 83-103, 154, 97, 29 W-63, 62 83-96, 27, 81, 30 W-61, 60 83-80, 31, 79, 35 W-59, 58 83-78, 36, 77, 37 W-57, 242 83-41, 38, 76, 39 W-52, 51 83-145,139,127,138 W-50, 53 83-115,151,126,137 W-277, 278 83-111,136,110,135 W-279, 280 83-109, 134, 108, 44 W-281, 282 83-107,133,100,132 W-54, 46 83-99,131,148,159 W-47, 48 83-112,157,113,158 W-49, 55 83-114, 160, 45, 43 9 W-282, 235 83A-009,016,001,004 W-92, 59 83A-003,005,007,014 W-66, 73 83A-008,015,010,017 W-75, 77 83A-011,018,012,019 W-78 83A-013, 020 8 W-70, 81 84-006,016,005,015 W-83, 88 84-004,013,003,014 W-243, 52 84-002,012,010,020 W-54, 280 84-008,018,009,019

,o ,-a....n.

LCD010583RLA13-LT

-\

s .. . .

Forun 9-0034,Rev.0 (M&sP 5.2)

NORTHERN STATES POWER CO. TABLE S2 2 1 PRAIRIE ISLAND UNIT .-- - _. I PAGE /

OF 5 BNSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIPING-CTRCUHFERENTIAL BUTT WELDS sus $#, E S M REQ'O.

INSP. AMT. STEM INSPECTION ITEM E. EXM SOENTimTION GORY ITEM TO SE EXAMINED .

REMT NO.

8 W-86W 84A-001, 017 W-91 84A-003, 015 W-234 84A-004, 011 W-83 84A-005, 012 W-68 84A-006, 019 W-59 84A-007, 008 W-281 84A-010, 009 W-79 84A-018, 020 C2.1 C-G (CONT'D) 8-VC-71A THREE -

1 W-55 84-007, 017 8-VC-71B - - -

RESIOUAL HEAT REMOVAL SUCTION 10-SI-9A - - -

10-SI-98 TWO 1 1 W-39W 80-10 -

ACCUMULATOR OISCHARGE LINES 12-SI-28A ONE 1 1 SI-1317 77-35, 56 12-SI-288 - - -

12-SI-29A - - -

12-SI-29B TWO 1 1 SI-33 79-49, 47 RESIDUAL HEAT REMOVAL SUCTION 12-RH-5A TWO 1 1 W-66 80-87 THREE 2 2 W-72, W-63 81-40, 43 12-RH-5B TWO 2 2 W-37, W-42. 80-11, 25 1

8-RH-5A TWO 1 1 W-64 80-92 i

THREE 1 1 W-27 82-093, 094 l

raaaa i n-m*

  • irs LCD010583RLA13-LT

Form 9-0034,Rsv 0 (H&SP 5.2)

NORTHERN STATES POWER CO. S2 2 1 TABLE PRAIRIE ISLAND UNIT _l B PAGE DF B INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIPING-CIRCUMFERENTIAL BUII WELDS SUB M ONE OR S M ITEM INSP. R EQ'D. AMT. ITEM INSPECTION GORY STEM TO SE EXAMINED PER. AMT. EXAM IDENTIF6 CATION REPORT NO.

8-RH-58 TWO 1 1 W-35 80-18 8-RH-4A TWO 2 2 W-60, W-59 80-94, 93 8-RH-4B TWO 1 1 W-31 80-17 10-RH-3 ONE 2 2 RH-1045R, RH-1048 77-76, 77 TWO 1 1 W-23 80-101 THREE 2 2 W-27 82-93, 94 W-1044 83C-091 C2.1 C-G (CONT'D) .

RESIDUAL HEAT REMOVAL DISCHARGE -

10-RH-11 TWO 3 3 RH-1, W-177 79-103/80-89, 88 W-176 THREE 2 2 W-170/ W-3 81-42/82-042 6-RH-12 THREE 1 1 W-8 82-101 8-RH-7A TWO 2 2 W-88, 89 80-49, 47 8-RH-7B TWO 3 3 W-138, 143, 206 80-19, 20, 23 8-RH-9A TWO 1 1 W-112 80-46 8-RH-9B TWO 2 2 W-195, 193 80-21, 22 SAFETY INJECTION 6-SI-108 ONE 1 1 SI-1290 77-48, 57 6-SI-10A TWO 3 3 W-128, 131, 126 80-72, 73, 71 REACTOR VESSEL SAFETY INJECTION 6-SI-25A TWO 1 1 SI-1291 79-75 THREE 1 1 W-1292 82-099 6-51-258 ONE 1 1 SI-15 77-35, 58

'aaa " "" *i" LCD010583RLA13-LT

\

l 4 o *

  • j Form 9-0036,Rev.0 (M&SP 5.2)

NORTHERN STATES POWER COMPANY TABLE II PRAIRIE ISLAND UNIT I PACE 1 OF_ 2 BASELINE COMPARISON

SUMMARY

NSF NDE W BASELINE REPORT BASELINE ISI EXAMINATION COMPONENT / SYSTEM ISO METHOD , IDENT. NO. INDICATIONS INDICATIONS LIMITATIONS C2.1 CIRCUMFERENTIAL BUTT *ALL SCANS LIMITED l WELDS 8Y HEAT TRACE LINES BORIC ACID SUPPLY 84 UT W-281 84A-009 S-2, 3, 4, NONE HEAT TRACE (HT)

SPOT 0 3:0f 9 3:30, 9:30 AND

25% 12:00 UT 84A-010 S-2, 3, 4, NONE HT 3:30, 9:30 &

SPOT 0 3:0( 12:30 67%

SAFETY INJECTION 82 UT W-59 84A-007 S-1, 40% NONE HT 3:00 & 6:00 PUMPS' SUCTION

  • S-2, 35% &

i 45%

j UT 84A-008 NONE NONE HT 3:00 & 6:00 .

82 UT W-68 84A-006 S-1, 2, 801 NONE HT 3:00 & 8:00 S-3, 66%

S-4, 94%

UT 84A-009 NONE NONE HT 12:30, 3:30, i

AND 9:30 82 UT W-79 84A-018 NONE NONE HT 2:00 & 8:30 i UT 84A-020 NONE NONE HT 2:00 & 8:30 i

j 82 UT W-234 84A-004 NONE NONE HT 1:30 & 9:30 1

UT 84A-011 NONE NONE HT 1:30 & 9:30 l 82 UT W-83 84A-005 NONE NONE HT 12:00, 3:00, 5:00 AND 6:00 UT 84A-012 NONE S-3 OD GEO., HT 12:00, 3:00, 150% 5:00 AND 6:00 LCD100484RLA02-LT

\

s . . .

Form 9-0036,Rev.0 (M&SP 5.2)

NORTHERN STATES POWER COMPANY TABLE II PRAIRIE ISLAND UNIT I PAGE 2 OF 2 BASELINE COMPARISON

SUMMARY

NSP NDE W BASELINE REPORT BASELINE ISI EXAMINATION COMPONENT / SYSTEM ISO METHOD IDENT. NO. INDICATIONS INDICATIONS LIMITATIONS ws 82 I UT W-86W 84W-001 NONE VISUAL LEAK AT HT 9:30, 10:00 12:00; 1/2" FROM AND 11:30; NO S-1 WELD ON VALVE VALVE j

SIDE 1/32" LONG UT 84A-017 NONE (SAME AS AB0VE) HT 9:30, 10:00 i

AND 11:30 NO S-1

  • VALVE REPAIRED WITH AN APPROXIMATE
2" x 4" PATCH OVER EFFECTIVE AREA.

1 82 UT W-91 84A-003 NONE NONE HT 3:00, 4:00, .

5:00, 8:00 AND 10:00 UT 84A-015 NONE NONE HT 3:00, 4:00, ,

5:00, 8:00 AND

10
00 82 UT W-99 84A-002 S-1, 50% NONE HT 2:30 & 9:30 i

UT 84A-016 NONE NONE HT 2:30 & 9:30 S-2 LIMITED "T" 82 UT W-103 84A-013 NONE S-1, OD GE0; 80% NONE i S-4, OD GE0; 1101

, UT 84A-104 S-1, 50% S-2, OD GE0; 25% S-1 LIMITED "T" i e LCD100484RLA02-LT

r . . .

'o j TABLE 3 NWHSiled STATES IGEiR 00. pg- 3 op 3 l'HAlkili IStAS 1841T 2 IFartRIC SlHWtY - CLASS 2 1

BliVISICH , M 504NI OR SYSTtH (BOP gj gjg%,g, [

ast l ...

I 2-1S1-17 0 STEAN CENERATORS A4 3 - -

2-151-46 0 MAIM ETEAM (CENERAI. VIEW) A - - -

2-ISI-46A 0 A 32" 32-2HS-1 NO.

2-158-465 0 A 31" 31-}HS-1 24 30" 30-2HS-1 23

. 6" 6-2HS-1 1 2-ISI-47 0 MAIM STEAN (CENERAL VIEW) E - - -

2-ISI-41A 0 5 12" 32-2HS-2 NO.

l 2- 1:. 5 -4 7 a 0 a 11" 3 1 - 2885 - 2 24 30" 30-2HS-2 23 ,

6" 6-2tlS-2 7

. 2 - l u i - 4 ts 0 FEEINATER (CEllEltAL VifW) A - -

ggg 2-lui-AnA A A 16" 16 -21 W- 13

? - 1 :.1 - 4 e t 0 A 16" 16-21M-12 11 16" 16-28u-Il 11 l 8" 3-2AF-Il IM. _ ,

l 2-8S8-49 0 FEEDWATER (CENERAL VIEW) B - -

13h6

) 2-ISS-49A 0 3 16" 16-2fw-16

, 2-ISI-49a O B 16" 16-2FW-15 13 8" 3-2AF-12 NO.

22 2-ISI-50 1 BIIS PUHF S SUCTION (WELDS) 5 10" 10-2RM-3 8" S-2RN-48 29 2-ISI-51 I sus ruHP S SUCTION (HANGERS) B 8" S-2RM-58 29 5

12" 12-2BM-5B 32 5

10" 10-2SI-9a 22 B

4" S-2BH-4A 29 2-151-52 g RNA PUHF A SUCTIOli (WELDS) A 8" S-2au-5A 29 2-8S1-53 g ama tute A suCTsols (ManCEas) A 32 A 12" 12-2RM-5A d'

A 10" 10-2SI-9A

)

~~

y , o

  • NORTHERN STATES POWER CO.

PRAIRIE ISLAND UNIT 2 PACE 2 of 3 ISOMETRIC SinflARY - CI. ASS 2

-~

NSP ISO S l.I NE LINE UT - CAI..

HilH11ER P OR SYSTEH I.00P SIZE HUtlBER STAtlDARD j 2-131-54 1 RilR PUHP B DISCilARCE (WELDS)

  • 8 8"
2-1S1-55 8-2Ril-78 29 l 0 RalR PUNP 8 DIScilARCE (HANGERS) 8" B 8-2Ril-98 29 i

1 B 6" 6-2SI-105 27 2-ISI-56 1 RilR PUHF A DIScilARGE (WELDS) A 8" 8-2Ril-7A 29 [

i 2-151-57 0 1 RilR PUNP A DISCHARCE (HANCERS) A 8" 8-2Ril-9A 29 A 10" l, 10-2R11-1 L 22 l

A 6" 6-2Ril-12 27 l 2-ISI-58 1 CONTAINHENT SUllP B DIScilARGE B 12" 12-21UI-6B 32 l j

8 14" 14-2SI-33B [10. -

i 8 12" 12-2SI-348 lid.

1 2-ISI-W CONTAINHElfr SI'llP 8 DISCllARGE l

A 12" 12-2Hil-6A 12

l A 14" 14-2SI-33A IM.

A 12" l l-lS I- l' A  ::a l .

l l-ISt-no 1 SAFEIY lillECfl0N l'II !PS SitCT10:1 A6h h" 6-2St-1JA .M g

6-2St-13B 28 2-1S1-61 1 BORIC ACID SUPPLY TO SAFETY INJECTION -

12" 12-211-1. 33 l l

8" 8-2JI-1 30 i

8" 8-2SI-It' 30

!' 2-1S1-62 0 2-ISI-63 SAFETY INJECTION PUNP 22 SUCTION (WEI.DS) 2 6" 6-2RN-108 27 0 SAFETY INJECTION PUHP 22 SUCTIOli (llANGER: )

2-1S1-64 0 2-IS1-65 SAFETY INJECTION PUHF 21 SUCTION (WELDS) A 6" 6-2Ril-10A 27

0 SAFETY INJECTION PUHP 2L SilCTION (llANGERt ) '

i 2-ISI-66 1 REMIELING HATER STORACE (WELDS) 14" 14-2SI-1 IH). l TANK DISCHARCE 12" 12-2St-3A 2-!SI-67 0 13 j

REFUELING WATER STORACE (llANCERS) 12" 12-2SI-38 33 TANK DISCalARCE 12" 12-2SI-4 i

33 l

- - _ _ _ _ _ _ ~

o

  • 2 NORTHERN STATES POWER CD. -

TABLE -

3 PRAIRIE ISI.AllD UNIT 2 PACE 3 OF 3 ISOMETRIC SUllHARY - CLASS 2 NSP LSO -

LINE LINE Ur - CAL.

NUHBER REVISION COHPONENT OR SYSTEH LOOP SIZE NUMBER STAllDARI) 2-[SI-67 0 Continued 10" 10-2St-8 3t 12" 12-2St-li 33 .

2-ISI-68 1 BORIC ACID TANK 21 #21 2-ISI-69 1 RESIDUAL NEAT EXCHANCERS #2t & #2 - -

11 0 .

2-ISI-70 0 REACTOR VESSEL SAFETY INJECTION (WELDS) B 6" 6-2St-258 6 2-ISt-71 0 REACTOR VESSEL SAFETY INJECTION (HANCERS '

2-ISI-12 0 REACTOR VESSEL SAFETY INJECTION (WELDS) A 6" 6-2St-25A 6 2-ISI-13 0 REACIOR VESSEL SAFETY INJECTION (IIANGERS '

2- I S I - 7!. 1 BORIC ACID SUPPLY (WELDS) -

8" 8-2St-18 10 2-ISI- N i ACCtHUI.ATOR Dir:.'llANCE A 12" 12-2SI-28A il 1.!" l2-2SI-29\ li at $2" l l-JS t -2dts li 12" 12-2S I -2*> u !L 2-1S1-16 1 ACCtAtlLATOR TANKS #21 & 22 - -

NO.

I l

i l

O

A . -- -

i l

i O

O i

l APPENDIX B M LZ I -

PERSONNEL LISTIyg m s m c cALI= ATIoN BtocRs m E Er _ "ROCEDURE P LISTING TABM IV -

EQUIPMENT AND MATER E S 4

. 1 v---,_ - - . _ _ .,. - - - - - - - . . . _ _ _ . . _ _ _ _ . , _ , ,_ _,__

NORTHERN STATES POWER COMPANY. -

APPENDIX n PRAIRIE ISLAND - UNIT I TABLE PERSONNEL LISTING PAGE lof 1 EXAMINER TITLE ORGANIZATION UT PT VT ET RT

- AVER, R G TECHNICIAN LMT(2) gg gi 77 gg(la), ,

CAPPELL, R M TECHNICIAN LMT I II II II(la), ,

KELLERHALL, R A SUPERVISOR LMT III III III III(la) ,

SEVERTSON, R J TECHNICIAN LMT I - - - - -

ANDERSON, M T M&SP NSP III III III III(la), gyg ENGINEER DAHLMAN, L C M&SP NSP II III III III(la) , y;;

SPECIALIST BRUSSEAU, F ANII HARTFORD STEAM BOILER INSURANCE COMPANY 4

l FOOTNOTES:

(la) Inspection experience and NDE qualifications were judged to be adequate to perform visual examinations in accordance with NSP-VT-1.

(2) Organization: (LMT) Lambert,MacGill, Thomas,Inc.

515 Aldo Avenue Santa Clara, CA 95055 LCD100484RLA03-6M

~

NORTHER?l STATES POWER COMPANY APPENDIX B PRAIRIE ISLAND - UNIT I TABLE II ULTRASONIC CAtlBRATION BLOCKS PAGE 1 of 1 PIPE SCHEDULE SERIAL OR CALIBRATION NSP No. SIZE & DIA. MATERIAL DATE

& THICKNESS HEAT NUMBER REPORTS 30 8" Sch. 10 .148" J 312 TP-304 64718 RGA-001 9-21-84 RGA-002 9-20-84 RGA-005 9-19-84 RGA-006 9-19-84 RGA-007 9-22-84 RAK-b01 9-19-84 RAK-002 9-19-84 RAK-003 9-20-84 RAK-004 9-21-84 RAK-005 9-22-84 33 12" Sch. 10 .180" A RGA-003 9-19-84 RGA-004 9-19-84 0

O I

LCD100884RLA01-LT

i e - - ,

NORTHERN STATES POWER COMPANY APPENDIX B PRAIRIE ~ ISLAND - UNIT I TABLE 773 PROCEDURE LISTING

, PAGE 1 of 1 PROCEDURE NUMBER FIELD PLANT APPROVAL FIELD CHANGE AND REVISION CHANGE PROCEDURE TITLE CHANGE DESCRIPTION DATE REMARKS NSP-UT-1, REV. I 1 ULTASONIC EXAMINATION 6-9-82 NONE C0VER EXAMINATION VOLUME OF PIPE WELDS OF S/S PIPING WELDS LESS THAN .200 INCH WALL THICKNESS NSP-UT-2, REV. 1 N/A AUTOMATIC DATA RECORDING 6-22-83 NONE NSP-Vl-1, REV. 2 N/A VISUAL EXAMINATION 6-22-83 NONE i

l

~

) LCD100884RLA02-LT

NORTHERN STATES POWER COMPANY' APPENDIX B PRAIRIE ISLAND - UNIT I TABLE Y EQUIPMENT AND MATERIALS PACE 1 0F 1 MATERIAL OR TYPE OR CALIBRATION EQUIPMENT SERIAL NUMBER R BATCII REMARKS JLTRASONIC:

NORTEC 1310 S/N 409 CAL 08/16/84 NORTEC 1310 S/N 167 CAL. 08/23/84 10RTEC 1310 S/N 371 CAL. 08/17/84 RECORDERS:

3 RUSH 220 S/N 18687 CAL. 08/07/84 3 RUSH 220 S/N 18940 CAL. 06/22/84 TEMP. GAUGES:

PTC SURFACE S/N 619 CAL. 05/11/84 CERTIFIED BY THERMOMETER S/N 630 CAL. 07/19/84 MANUFACTURER ROMPAS BLOCKS:

304 S/S S/N 046 CERT 10/28/83 EARLE M JORGENSEN C0 iATERIALS:

JLTRASONIC LMT - GEL BATCH if12484 00 PLANT LMT - GEL BATCH 71110812 JLTRASONIC IRANSDUCERS: S/N: SIZE: FREQUENCY:

t l

iARISONIC 8404 1/4" x 1/4" 5.0 MHZ iARIS0NIC R941 1/4" x 1/4" 5.0 MHZ t

e LCD100884RLA03-LT

) __

t APPENDIX C FORM NIS-1 OWNER'S DATA REPORT FOR INSERVICE INSPECTION t

FORMN!S!i OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS (As Required by the Provisions of the ASME Code Rules) 1.) Owner: Northern States Power Company Address: 414 Nicollet Mall, Minneapolis, Minnesota 55401 2.) Plant: PRAIRIE ISLAND NUCLEAR GENERATING PLANT Address: WELSH, MINNESOTA g 3.) Plant Unit: I 4.) Owner (Certificate of Authorization): --

5.) Commercial Service Date: 12-16-73 6.) National Board Number for Unit: --

7.) Components Inspected:

Manufacturer Component or Manufacturer or Installer State or National Appurtenance or Installer Serial No. Province No. Board No.

ASME CLASS II C2.0 PIPING PRESSURE B0UNDARY C2.1 CIRCUMFERENTIAL BUTT WELDS BORIC ACID NAVC0 --- --- ---

SUPPLY TO SAFETY INJECTION 281 SAFETY NAVC0 --- --- ---

INJECTION PUMPS' SUCTION W-59, 68, 79, 234, 83, 86W, 91, 99, 103 s

LC0100884RLA04-LT Page 1 of 2

FORM N?S-1 (back) 8.) Examination Dates 9-19-84 to 9-22-84 9.) Inspection Interval 12-16-73 to 12-16-83 10.) Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval.

This report summarizes the inservice inspection examination performed at Prairie Island Nuclear Generating Plant - Unit 1. This inspection was conducted during the period from September 19 to September 22, 1984, in response to the NRC Staff

, Evaluation Meeting documented April 18, 1983, specifically item 5 of Section 6 wnich

. states that 10 welds be examined every six months.

11.) Abstract of Conditions Noted.

The results from the inservice inspection examinations revealed one weld containing boric acid build up as the result of a thru wall transgranular crack, all remaining welds revealed no indications.

12.) Abstract of Corrective Measures Recommended and Taken.

The weld with the thru wall leak was repaired by placing an approximate 2" x 4" welded patch over the area of the leak.

L5 certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of the ASME Code, Sectio,n XI.

Date L 1 ann 3 19 ( 5 S1gned hA Gas $ 51 kswL$ m B h (Y0 m-~

p u Owner '

V/

Certificate of Authorization No. (if applicable) Expiration Date NM -

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid comission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of# / ,uit; r-e and employed by M:Myt cn*& #cn eE of //tr-Av e on>>. havp inspected the components de-scribed in this Owner's Data Report during the period ?/n h u to Nu A' , and state that to the best of my knowledge and belief, the Owner ~has performed examinations and taken corrective measures described in this Owners' Data Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Data report. Furthermore, neither the Inspector nor his employer shall be

. liable in any manner for any personal injury or property. damage or loss of any kind arising from or connected with this inspection.

o Date / 3 19 8' r

^ /

%d/ / / %) s . W __ Commissions int M u i W' 77D/

L Inspector's 5'ignature National Board, State, Province & No

! LCD100884RLA04-LT Page 2 of 2 i

._ ^