ML20114B348

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Jun 1992 for SONGS Unit 3,revising Operating Status
ML20114B348
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/30/1992
From: Farr M
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20114B318 List:
References
NUDOCS 9208260173
Download: ML20114B348 (1)


Text

..

Gs

'Da:.

NRC MONTHLY OPERATING REPORT DOCKET NO: J0-362 UNIT NAME:._SF:GS - 3 DATE: _Asta t 15, 1992 COMPLETED BY:

M. M. FA r TELEPHONE:

(714) 368-9787 OPERATING STATUS 1.

Unit Name: San Onofre Nuclear Generating Station. Unit 3 2.

Reporting Period:.. June 1992 3.

Licensed Thermal Power (MWt):

3390 4.

Nameplate Rating (Gross MWe):

1127 5.

Dasign Electri-al Rating (Net MWe):

1.080 6.

Maximum Dependable Capacity (Gross MWe):

1127 7.

Maximum Dependable Capacity (Net MWe):

10B0 8.

If t.hanges Occur in Capacity Ratings (Item < Number 3 Through 7) s Since Last Report, Give Reasons:

._ N A 6

9.

Power level T' Which Restricted, if Any (Net MWe):

NA 10.

Reasons for Restrictions, If Any:

NA This Month Yr.-to-Date Cumulative 11.

Hours In Reporting Period 720.00 4 367.00 72dll.00 a

12.

Number Of Mours Reactor V

?ritical 720.00 2.334.71 54.832.96 ~

13.

Reactor Reserve Shutdown i. rs 0.00 0.00 0.00 14.

Hours Generator On-Line 720.00 2.175.80 55.246.81 1'

15.

Unit Reserve Shutdown Hours 0.00 6.00 0.00 16.

Gross Thermal Energy Generated (MWH) 2 J 3,482.02 6.900,782.38 170 1_81 207.34 m

17.

Gross Electrical Energy Generated (MWii) 8E201.50 2.302.911.00 57.702,936.00 18.

Net Electrical Energy Generated (MWH) 783.443.00 Ll47.079.07 54.465.186.36 19.

Unit Service factor 100.00%

49.825 73.64%

.i 20.

Unit Availability Factor 100,004 49.82%

73.64%

21, UnitCapacityfactor(UsingMDCNet) 100,75%

45.52%

69.75 22.

Unit Capacity factor (using DER Net) 100.75%

45.52%

69.74%

23.

Unit forced Outage Rate 0.00%

14.03%

  • 8.02%

0 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

~

None 25, if Shutdown At End Of Report Period, Estimated Date of Startup:

NA 26.

Units in Test Status (Prior To Commercial Operation):

Forecast Achievea INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIA'. OPERATION NA NA Data corrected since previous submittal.

mor.jun/8 Y20826J173 9208.15 PDR ADOCK 05000261 R

PDR l---_i ii----- li'i E---

i-

"i

-