Revised Monthly Operating Rept for May 1992 for SONGS Unit 3,revising Unit Shutdowns & Power Reductions & Operating Status
ML20114B323
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 05/31/1992
From: Farr M
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20114B318 List:
References
NUDOCS 9208260076
Download: ML20114B323 (3)


Text

. . . . . - - . . - . - - - . . . . - . . . - . . . - . . - - - . . - _ . - = - . .. - . - - -

j'[rh.

r,hO,j) <

1; M -

+

wm. -..

)'_ gT t kr l[  !

% C~

. s t,l: . A ,

,, 2 h '

y$3]

r.

.cs f?;; ;

g;

.i g;

Tl 4*,

'l k ,*

%- ATTACHMENT A v.

', Revised Unit 3 May 1992 Unit Shutdowns and Power Reductions

(; ' and Revised Unit 3 May and June 1992 Operating Status

= <;.; '

]; ~ , SONGS Unit 2 and 3 Monthly Operating Report, July 1992 um T.f C .'

j! -

p:,

!0i n.

l 4' ju a .. .

(Y

/;

l-

')

!- 9200260076 920815 1

-PDR ADCCK 0500 l'l- , .R

~

4 es : . . . ,. .

.s+ ., . . ..

.. s

,~ j_

1+ ~ - , ,:. 9 . .. <

  • a UNIl SHUTDOWHS AND POWER REDUCTIONS DOCKET NO: 50-362- .

UNIT NAME:' SONGS - 3 REPORT MONTH: May 1992 DATE: August 15. 1992 ~

+ COMPLETED BY: M. H. Farr TELEPHONE: (714) 368-9787 Method of Shutting Cause & Corrective Du ra tion Down LER System Component Action to Reason 2

Reactor' No. Code' Code 5

Prevent Recurrence No. Date Type' (Hours)

  • NA AB BAF Continued from previous month's 66 920424 F 108.98 A 1 octage.

iP TA TFB Resumed turbine balancing from

" 65 920419 5 120.62 B 1 previous month.

101.60 A 3 3-92-003 AB CAP See note below.

67 920515 F This Note: On May 15, at 1006, with Unit 3 at 100's reactor power, RCP P003 tripped on neutral ground overcurrent.

caused a reactor trip signal to be generated. A short circuit failure (f the RCP P003 motor phase "C" surge protection capacitor occurred due to long tera vibration-induced abrasian damage to the mylar plastic insulation withiri the capacitor asscmoly. The surge capacitors for al, four Unit 3 RCPs were replaced with in-kind parts and the surge capacitors for the Unit 2 RCPs will be rer: 1ced during the next outage of sufficient duration. The RCP motor preventative r:nintenance program -ill be modified t;, include an Periodic replacement of the appropriate periodic examination, including testing, of the surge cenac, tors.

capacitors will be required as appropriate.

1 l

  • Data corrected since pr evious submittal . .

i

{

    • Line added since pre.'icus sutmittai,

'IEEE Std 505-19S4 j[r 2f-forced Reason: 'tte t h od :

1-Manual 5-Scheduled A-Equipment failure (Explain) tl 2-Marual Scram. 'lEEE Std 803A-1983 d fl-f taintenance or Test C-Refueling 3-Automatic Scram.

d  ;

D Regulatory Restriction 4-Continuas,on from p l Previous Month E-Operator Training & ticense Examinatior.

{l S-Reduction in the Average F-Adminis*rative j .! Daily Power level of more

o-Operational Error (Explain) r ,

H-Other (Explain) than 20'. from the previous vay il l 6-Other (Explain) bl mor.may/10 m

g ,--. . u

}y. . ,

$g.3 'y ,

h ..

NRC HONTHLY OPERATING REPORT h i DOCKET fiO: 50-362 UNIT NAME: SONGS - 3 O' DATE: Au;ast 15. 1992

'. COMPLETED BY: .M. M. Farr F TELEPHONE: (714j 368-9787 f* OPERATING S MTUS n:

1. Unit Name: _ San Onofre Nuclear Generatino Station. Unit 3 r 2. Reporting Period: May 3 92
3. Licensed Thermal Power (MWt)
3390

-t _4. Nameplate Rating (Gross MWe): 1127

5. Design Electrical Rating (Net tiWe): 1080 l 6. Maximum Dependable Capacity (Gross MWe): 1127 J '
7. Maximum Ocpendable Capacity (Net MWe): 1080 __
8. 'If Changes Occur in Capacity Ratings (items Number 3 lhrougn 7)
  1. *ince last Repor;, Give Reasons: NA
9. vower Level To Which Restricted, If Any (Net !!We): NA
10. Rea. ins For Restrictions, li' Any: NA This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 744.00 3m647.00 71.591.00
12. Number Of Hours Reactor Was Critical 461.40 1.614.71 S4.112.96
13. Reactor Reserve Shutdown liours 0.00 0.00 0.00

. 14. Hours Generator On-Line 412.80 _ l.455.80 521526.81

, 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00

, 16. Grcss Thermal Energy Generated (MWH) L185.9 / 0. 24 4.487.300.86 167.774./25.32

, 17. Gross Electrical Energy Generated (MWH) 3L5463.00 1.478.709.50 56.878.734.50
18. Het Electrical Energy Generated (MWH) 342.771.00 L 3_61636. 07 53a 681.743.36
19. Unit Service factor- 55.4S% 39.92% 73.37%
20. Unit Availability Factor ~

55,48*: 39.92% 73.37%

21. Unit Copacity Factor (Using MDC Net) 42.66% 34.62% 69.434

-22. Unit Capacity Factor (Using DER Net) 42.66% 34.62% _ 69.43'S

23. Unit Forced Outage Rate
  • 33.78's
  • 19.61%
  • 8.12%

n 24. Shutdowns Schedulec Over Next 6 Months (Type, Date, and Duration of Each):

~

None

25. If Shutdown At End'Of Report Pericd, Estimated Date of Startup: NA
26. Units in Test Status (Prior To Cornercial Operation): forecast Achieved L INITIAL CRITICALITY- NA NA L ' INITIAL ELECTRICITY NA NA COMMERCIAL 6PERATION NA NA Data corrected since previous submittal.

l mor.may/8 l

l r

.o  % -

.V :  ? . . -

.y . , ,. ' .,:. - a. . . -

.