ML20114B323

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for May 1992 for SONGS Unit 3,revising Unit Shutdowns & Power Reductions & Operating Status
ML20114B323
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 05/31/1992
From: Farr M
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20114B318 List:
References
NUDOCS 9208260076
Download: ML20114B323 (3)


Text

.

. -... -.. - - -.. - _. - = -.

h,j) j'[rh.

O r,

1; M -

+

wm.

)' T t kr

_ g l[

% :. s C~

t,l:. A,

h

,, 2 y$3]

r.

.cs f?;; ;

g;

.ig; Tl 4*,

'l k,*

ATTACHMENT A v.

Revised Unit 3 May 1992 Unit Shutdowns and Power Reductions

(; '

and Revised Unit 3 May and June 1992 Operating Status

= <;.;

]; ~,

SONGS Unit 2 and 3 Monthly Operating Report, July 1992 umT.f C.'j!

p:,

!0i n.

l 4' ju a...

(Y

/;

l-

')

9200260076 920815

-PDR ADCCK 0500 1

l',

l-

.R

~

4 es :...,..

.. s

.s+

.j_

,~

a 1+

~ -,,:. 9 UNIl SHUTDOWHS AND POWER REDUCTIONS DOCKET NO: 50-362-UNIT NAME:' SONGS - 3 REPORT MONTH:

May 1992 DATE: August 15. 1992

~

COMPLETED BY:

M. H. Farr

+

TELEPHONE:

(714) 368-9787 Method of Cause & Corrective Shutting Du ra tion Down LER System Component Action to 5

No.

Date Type' (Hours)

Reason Reactor' No.

Code' Code Prevent Recurrence 2

66 920424 F

108.98 A

1 NA AB BAF Continued from previous month's octage.

" 65 920419 5

120.62 B

1 iP TA TFB Resumed turbine balancing from previous month.

67 920515 F

101.60 A

3 3-92-003 AB CAP See note below.

This Note:

On May 15, at 1006, with Unit 3 at 100's reactor power, RCP P003 tripped on neutral ground overcurrent.

caused a reactor trip signal to be generated. A short circuit failure (f the RCP P003 motor phase "C" surge protection capacitor occurred due to long tera vibration-induced abrasian damage to the mylar plastic insulation withiri the capacitor asscmoly.

The surge capacitors for al, four Unit 3 RCPs were replaced with in-kind parts and the surge capacitors for the Unit 2 RCPs will be rer: 1ced during the next outage of sufficient duration.

The RCP motor preventative r:nintenance program -ill be modified t;, include an appropriate periodic examination, including testing, of the surge cenac, tors.

Periodic replacement of the capacitors will be required as appropriate.

1 l

Data corrected since pr evious submittal.

i

{

Line added since pre.'icus sutmittai, j[r

'tte t h od :

'IEEE Std 505-19S4 2f-forced Reason:

tl 5-Scheduled A-Equipment failure (Explain) 1-Manual d

fl-f taintenance or Test 2-Marual Scram.

'lEEE Std 803A-1983 3-Automatic Scram.

d C-Refueling 4-Continuas,on from p l D Regulatory Restriction E-Operator Training & ticense Examinatior.

Previous Month

{ l F-Adminis*rative S-Reduction in the Average j.!

o-Operational Error (Explain)

Daily Power level of more

r i

l l H-Other (Explain) than 20'. from the previous vay 6-Other (Explain) b l mor.may/10 m

u g

}y..

$g.3

'y h

NRC HONTHLY OPERATING REPORT h

DOCKET fiO:

50-362 i

UNIT NAME: SONGS - 3 O'

DATE: Au;ast 15. 1992 COMPLETED BY:

.M.

M. Farr F

TELEPHONE:

(714j 368-9787 f*

OPERATING S MTUS n:

1.

Unit Name: _ San Onofre Nuclear Generatino Station. Unit 3 r

2.

Reporting Period: May 3 92 3.

Licensed Thermal Power (MWt):

3390

-t

_4.

Nameplate Rating (Gross MWe):

1127 5.

Design Electrical Rating (Net tiWe):

1080 l

6.

Maximum Dependable Capacity (Gross MWe):

1127 J

7.

Maximum Ocpendable Capacity (Net MWe):

1080

8. 'If Changes Occur in Capacity Ratings (items Number 3 lhrougn 7)
  • ince last Repor;, Give Reasons:

NA 9.

vower Level To Which Restricted, If Any (Net !!We):

NA

10. Rea. ins For Restrictions, li' Any:

NA This Month Yr.-to-Date Cumulative 11.

Hours In Reporting Period 744.00 3 647.00 71.591.00 m

12.

Number Of Hours Reactor Was Critical 461.40 1.614.71 S4.112.96 13.

Reactor Reserve Shutdown liours 0.00 0.00 0.00 14.

Hours Generator On-Line 412.80 _

l.455.80 52 526.81 1

15.

Unit Reserve Shutdown Hours 0.00 0.00 0.00 16.

Grcss Thermal Energy Generated (MWH) L185.9 / 0. 24 4.487.300.86 167.774./25.32 17.

Gross Electrical Energy Generated (MWH) 3L5463.00 1.478.709.50 56.878.734.50 18.

Het Electrical Energy Generated (MWH) 342.771.00 L 3_61636. 07 53 681.743.36 a

19.

Unit Service factor-55.4S%

39.92%

73.37%

20.

Unit Availability Factor

~

42.66%

34.62%

69.434 55,48*:

39.92%

73.37%

21.

Unit Copacity Factor (Using MDC Net)

-22.

Unit Capacity Factor (Using DER Net) 42.66%

34.62% _

69.43'S 23.

Unit Forced Outage Rate

  • 33.78's
  • 19.61%
  • 8.12%

n 24.

Shutdowns Schedulec Over Next 6 Months (Type, Date, and Duration of Each):

~

None 25.

If Shutdown At End'Of Report Pericd, Estimated Date of Startup:

NA 26.

Units in Test Status (Prior To Cornercial Operation):

forecast Achieved L

INITIAL CRITICALITY-NA NA L

' INITIAL ELECTRICITY NA NA COMMERCIAL 6PERATION NA NA Data corrected since previous submittal.

l mor.may/8 l