s MONTHLY OPERATING REPORT DOCKET NO.
50-483 UNIT NAME 6 DATE necember s. 1984 COMPLsTsu BY J. T: Patterson TELEPHONE (314) 676-B207 PART A OPERATIONS
SUMMARY
November 1984 Power ascension testing in progress.
Completed month at 90% power.
O 1
PART B PORV AND SAFETY VALVE
SUMMARY
None i
l ch0[O83 DOC PDR CA-#804 05/09/84 QDP-ZZ-04204 Page 1 of 5
l Part C AVERAGE DAILY UNIT POWER LEVEL i
~
DOCKET NO.
50-483 UNIT Callaway DATE December 3, 1984 COMPLETED BY K. R.
Bryant TELEPHONE (314)676-8292 I
MONTH NOVEMBER 1984 a
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe Net) 0 i
164 37 237 0
2 3,
232 0
3 1, -
280 0
4 3
424 344 5
21 148 312 376 719 7
434 760 8
24 755 g
434 3
524 61 10 26 440 770 3,
l 612 895 12 13 428 884 29 l
618 744 34 y
15 0
NA 33 16 0
l
[0 84 l
Page 2 of 5 QDP-ZZ-04204
Part D OPERATING DATA REPORT 50-483
~
DOCKET NO.
UNIT Callaway DATE December 3, 1984 K. R. Bryant COMPLETED BY (314) 676-8292 TELEPHONE OPER ATING STATUS NOVEMBER 1984 gross HOURS IN REPORTING PERIOO:
720
- 1. REPORTING PERIOD:
- 2. CURRENTLY AUTHORIZED POWER LEVELlMWts: 3411 MAX. DEPEND. CAPACITY lMWo.Neti: Not vet known -
DESIGN ELECTRICAL RATING (MWo. Nets:
11M still in startup 100%
- 3. POWER LEVEL TO WHICH RESTRICTED flP ANY) (fAWo. Net):
- 4. REASONS FOR RESTRICTION llP ANYl:
THIS MONTH YR TO DATE CUMULATIVE 670 1202 1202 S. NUMSER OF HOURS REACTOR WAS CRITICAL 0
0 0
J. REACTOR RESERVE SHUTDOWN HOURS 478 555 555 7
- 7. HOURS GENERATOR ON LINE 0
0 0
- 8. UNIT RESERVE SMUTDOWN MOURS
- 9. GROSS THERMAL ENERGY GENER ATED lMWHI 878,649 978,918 978,918 272.112 290.217 290.217 to. GROSS ELECTRICAL ENERGY GENERATED (MWM)..
240.056 254.189 254.189
- 11. NET ELECTRICAL ENERGY GENERATED (MWH)
NA NA NA
- 12. REACTOR SERVICE P ACTOR
- 13. REACTOR AVAILABILITY PACTOR...
NA NA MA
- 14. UNIT SERVICE PACTOR NA NA NA
- 15. UNIT AVAILASILITY PACTOR NA NA MA MA MA MA
- 18. UNIT CAPACITY PACTOR lueng MDC)
"A M
- 17. UNIT CAPACITY P ACTOR tunne Demon MWel...
NA NA NA
- 18. UNIT PORCED OUTAGE RATE
- 19. SHUTDOWNS SCHEDULED OVER NEXT S MONTHS ITYPE. DATE. ANO DURATION OF EACMl:
None
- 20. IF SMUT DOWN AT END OF REPORT PERICO. ESTIMATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
PORECAST ACHIEVED INITIAL CRITICALITY l0/2/R4 INITI AL ELECTRICITY 10/74 /R4 COMMERCIAL OPERATION
- Forecast completion of ascension testing 1/1/85 including contingency, hh Page 3 of 5 QDP-ZZ-04204
o e-
\\
Part E DOCKET NO.
50-483 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway DATE December 5-14R4 COMPLETED BY J. T. Patterson TELEPHONE (3I4) 676-8207 REPORT MONTII NOVFtfRFR 14R4 METHOO OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO.
DATE S: SCHEDULED (HOURS)
REASON REDUC 8NG POWER CORRECTIVE ACTIONS / COMMENTS 9
10/30 Forced 3.2 A
3 Turbine Trip from 30% P'ower due to high vibrations.
10 11/5 Forced 20.5 A
3 Reactor Trip from 45% Power due to failed feedwater regulating valve.
11 11/6 Forced 12.5 A
3 Turbine Trip from 16% Power due to failed main feedwater recirculation valve.
12 11/10 Scheduled 11.0 B
2 Manual Reactor Trip from 48% Power while performing ETT-ZZ-07120, ' Rod Drop and Plant Trip.'
13 11/14 Forced 15.0 A
3 Turbine Trip from 56% Power due to circulating water pump trip.
14 11/26 Scheduled 2.0 B
1 Load reduction while performing sueusARY:
ETT-ZZ-07101, 'Large Load Reduction -
75% Power.'
CA-f804
- 05/09/84 Page 4 of 5 QDP-ZZ-04204
t o'
Part E DOCKET NO.
50-483 i
l UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway l
DATE December 5, 1984 COMPLETED BY J. T. Patterson REPORT MONTil NOVEMBER 1984 TELEPHONE (31'4) 676-8207 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO.
DATE S: SCHEDULED l HOURS)
REASON REDUCBMG FOWER CO IRECTIVE ACTMNTS 15 11/29 Forced 13.0 A
3 Turbine Trip from 80% Power due to loss of both electrohydraulic control pumps.
4
$UtesARY:
i CA-#804
- 05/09/84 Page 5 of 5 QDP-ZZ-04204
W J:
c.
l.I NIO N ELECTRIC COMPANY CALLWAY PLANT MAILING ADDREspS:
P. o. sox eso FULTON, MO. 6525I December 7, 1984 Director, Resource Management U. S. Nuclear Regulatory Commission Washington, DC 20555 ULNRC-991 DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT NOVEMBER 1984
Dear Sir:
The enclosed Monthly Operating Report for October 1984 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
/
(L W bv k
S. E. Miltenberger Manager, Callaway Plant T 4e(
JTP/WRC/RRG/drs Enclosure cc: Distribution attached l
N 4..
0, cc distribution-fer ULNRC-991 with enclosures Mr. James G. Keppler Regional Administrator Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Director Office of' Inspection & Enforcement
.U. S.. Nuclear Regulatory Commission Washington, DC. 20555 Records Center Institute of Nuclear Power Operations Suite 1500 1100 Circle 75 Parkway Atlanta, GA 30339 American Nuclear Insurers Library c/o Dottie Sherman The Exchange Suite 245 270 Farmington Avenue Farmington, CT 06032 NRC Resident Inspector Missouri Public-Service Commission D. F. Schnell J. F. McLaughlin J. E. Davis (Z40MOR)
R. L. Powers D. W. Capone A. C. Passwater/D. E. Shafer/D. J. Walker G. A. Hughes W. R. Robinson (QA Record)
P. T. Appleby SEM Chrono 3456-0021.6 Z40ULNRC G56.37 N. Date