MONTHLY OPERATING REPORT DOCKET NO. 50-483 UNIT NAME 6 DATE necember s. 1984 COMPLsTsu BY J. T: Patterson TELEPHONE (314) 676-B207 -

PART A OPERATIONS

SUMMARY

November 1984 Power ascension testing in progress.

Completed month at 90% power.

O 1

PART B PORV AND SAFETY VALVE

SUMMARY

None i

l DOC ch0[O83 PDR CA-#804 05/09/84 QDP-ZZ-04204 Page 1 of 5

l Part C l i

AVERAGE DAILY UNIT POWER LEVEL

~

DOCKET NO. 50-483 -

UNIT Callaway DATE December 3, 1984 COMPLETED BY K. R. Bryant TELEPHONE (314)676-8292 I

MONTH NOVEMBER 1984

, a DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe Net) i 164 37 0

237 0 2 3, 232 0 3 1, -

280 0 4 3 424 344 5 21

, 148 312 376 719 7

434 760 8 24 g 434 3 755 524 61 10 26 440 770 3,

l 12 612 , 895 13 428 29 884 l 618 y 744 34 15 0 NA 33 16 0 l

[0 84 l Page 2 of 5 QDP-ZZ-04204

Part D OPERATING DATA REPORT DOCKET NO. 50-483

~

UNIT Callaway DATE December 3, 1984 K. R. Bryant COMPLETED BY TELEPHONE (314) 676-8292 OPER ATING STATUS

1. REPORTING PERIOD: NOVEMBER 1984 gross HOURS IN REPORTING PERIOO: 720
2. CURRENTLY AUTHORIZED POWER LEVELlMWts: 3411 MAX. DEPEND. CAPACITY lMWo.Neti: Not vet known -

DESIGN ELECTRICAL RATING (MWo. Nets: 11M still in startup 100%

3. POWER LEVEL TO WHICH RESTRICTED flP ANY) (fAWo. Net):

. 4. REASONS FOR RESTRICTION llP ANYl:

THIS MONTH YR TO DATE CUMULATIVE 670 1202 1202 S. NUMSER OF HOURS REACTOR WAS CRITICAL . . . .

J. REACTOR RESERVE SHUTDOWN HOURS .

0 0 0 7 7. HOURS GENERATOR ON LINE .

478 555 555

8. UNIT RESERVE SMUTDOWN MOURS . . ,

0 0 0 878,649 978,918 978,918

9. GROSS THERMAL ENERGY GENER ATED lMWHI to. GROSS ELECTRICAL ENERGY GENERATED (MWM) . . 272.112 290.217 290.217
11. NET ELECTRICAL ENERGY GENERATED (MWH) .. .

240.056 254.189 254.189 NA NA NA

12. REACTOR SERVICE P ACTOR ... . ..
13. REACTOR AVAILABILITY PACTOR . . . . ... .

NA NA MA

14. UNIT SERVICE PACTOR ,. ... . .. .

NA NA NA

15. UNIT AVAILASILITY PACTOR . . . . ..

NA NA MA

' 18. UNIT CAPACITY PACTOR lueng MDC) ...... ....... MA MA MA "A M "

17. UNIT CAPACITY P ACTOR tunne Demon MWel . . . . . ......
18. UNIT PORCED OUTAGE RATE ,... . ........ ...

NA NA NA

19. SHUTDOWNS SCHEDULED OVER NEXT S MONTHS ITYPE. DATE. ANO DURATION OF EACMl: None
20. IF SMUT DOWN AT END OF REPORT PERICO. ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): PORECAST ACHIEVED INITIAL CRITICALITY l0/2/R4 INITI AL ELECTRICITY 10/74 /R4 COMMERCIAL OPERATION *
  • Forecast completion of ascension testing 1/1/85 including contingency, Page 3 of 5 hh QDP-ZZ-04204

. . . . . o .

e-

\

Part E DOCKET NO. 50-483 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway DATE December 5- 14R4 COMPLETED BY J. T. Patterson REPORT MONTII NOVFtfRFR 14R4 TELEPHONE (3I4) 676-8207 METHOO OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON REDUC 8NG POWER CORRECTIVE ACTIONS / COMMENTS 9 10/30 Forced 3.2 A 3 Turbine Trip from 30% P'ower due to high vibrations.

10 11/5 Forced 20.5 A 3 Reactor Trip from 45% Power due to failed feedwater regulating valve.

11 11/6 Forced 12.5 A 3 Turbine Trip from 16% Power due to failed main feedwater recirculation valve.

12 11/10 Scheduled 11.0 B 2 Manual Reactor Trip from 48% Power while performing ETT-ZZ-07120, ' Rod Drop and Plant Trip.'

13 11/14 Forced 15.0 A 3 Turbine Trip from 56% Power due to circulating water pump trip.

14 11/26 Scheduled 2.0 B 1 Load reduction while performing sueusARY: ETT-ZZ-07101, 'Large Load Reduction -

75% Power.'

CA-f804

  • 05/09/84 Page 4 of 5 QDP-ZZ-04204

t o' i

Part E DOCKET NO. 50-483 l Callaway l

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME December 5, 1984 DATE COMPLETED BY J. T. Patterson

! REPORT MONTil NOVEMBER 1984 TELEPHONE (31'4) 676-8207 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO. DATE S: SCHEDULED l HOURS) REASON REDUCBMG FOWER CO IRECTIVE ACTMNTS 15 11/29 Forced 13.0 A 3 Turbine Trip from 80% Power due to loss of both electrohydraulic control pumps.

4

$UtesARY:

i CA-#804

  • 05/09/84 Page 5 of 5 QDP-ZZ-04204

W J: .,

c. >

l.I NIO N ELECTRIC COMPANY CALLWAY PLANT MAILING ADDREspS:

P. o. sox eso FULTON, MO. 6525I December 7, 1984 Director, Resource Management U. S. Nuclear Regulatory Commission Washington, DC 20555 ULNRC-991 DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT NOVEMBER 1984

Dear Sir:

The enclosed Monthly Operating Report for October 1984 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

/ (L W bv k S. E. Miltenberger Manager, Callaway Plant T 4e(

JTP/WRC/RRG/drs Enclosure cc: Distribution attached l

4..

N

0, .. . .. .

cc distribution-fer ULNRC-991 with enclosures Mr. James G. Keppler Regional Administrator Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Director Office of' Inspection & Enforcement

.U. S.. Nuclear Regulatory Commission Washington, DC. 20555 Records Center Institute of Nuclear Power Operations Suite 1500 1100 Circle 75 Parkway Atlanta, GA 30339 American Nuclear Insurers Library c/o Dottie Sherman The Exchange Suite 245 270 Farmington Avenue Farmington, CT 06032 NRC Resident Inspector Missouri Public-Service Commission D. F. Schnell J. F. McLaughlin J. E. Davis (Z40MOR)

R. L. Powers D. W. Capone A. C. Passwater/D. E. Shafer/D. J. Walker G. A. Hughes W. R. Robinson (QA Record)

P. T. Appleby SEM Chrono 3456-0021.6 Z40ULNRC G56.37 N. Date