Monthly Operating Rept for Nov 1984
ML20113G718
Person / Time
Site: Callaway Ameren icon.png
Issue date: 11/30/1984
From: Miltenberger S, Patterson J
UNION ELECTRIC CO.
To:
NRC
References
ULNRC-991, NUDOCS 8501240484
Download: ML20113G718 (7)


Text

..

s MONTHLY OPERATING REPORT DOCKET NO.

50-483 UNIT NAME 6 DATE necember s. 1984 COMPLsTsu BY J. T: Patterson TELEPHONE (314) 676-B207 PART A OPERATIONS

SUMMARY

November 1984 Power ascension testing in progress.

Completed month at 90% power.

O 1

PART B PORV AND SAFETY VALVE

SUMMARY

None i

l ch0[O83 DOC PDR CA-#804 05/09/84 QDP-ZZ-04204 Page 1 of 5

l Part C AVERAGE DAILY UNIT POWER LEVEL i

~

DOCKET NO.

50-483 UNIT Callaway DATE December 3, 1984 COMPLETED BY K. R.

Bryant TELEPHONE (314)676-8292 I

MONTH NOVEMBER 1984 a

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe Net) 0 i

164 37 237 0

2 3,

232 0

3 1, -

280 0

4 3

424 344 5

21 148 312 376 719 7

434 760 8

24 755 g

434 3

524 61 10 26 440 770 3,

l 612 895 12 13 428 884 29 l

618 744 34 y

15 0

NA 33 16 0

l

[0 84 l

Page 2 of 5 QDP-ZZ-04204

Part D OPERATING DATA REPORT 50-483

~

DOCKET NO.

UNIT Callaway DATE December 3, 1984 K. R. Bryant COMPLETED BY (314) 676-8292 TELEPHONE OPER ATING STATUS NOVEMBER 1984 gross HOURS IN REPORTING PERIOO:

720

1. REPORTING PERIOD:
2. CURRENTLY AUTHORIZED POWER LEVELlMWts: 3411 MAX. DEPEND. CAPACITY lMWo.Neti: Not vet known -

DESIGN ELECTRICAL RATING (MWo. Nets:

11M still in startup 100%

3. POWER LEVEL TO WHICH RESTRICTED flP ANY) (fAWo. Net):
4. REASONS FOR RESTRICTION llP ANYl:

THIS MONTH YR TO DATE CUMULATIVE 670 1202 1202 S. NUMSER OF HOURS REACTOR WAS CRITICAL 0

0 0

J. REACTOR RESERVE SHUTDOWN HOURS 478 555 555 7

7. HOURS GENERATOR ON LINE 0

0 0

8. UNIT RESERVE SMUTDOWN MOURS
9. GROSS THERMAL ENERGY GENER ATED lMWHI 878,649 978,918 978,918 272.112 290.217 290.217 to. GROSS ELECTRICAL ENERGY GENERATED (MWM)..

240.056 254.189 254.189

11. NET ELECTRICAL ENERGY GENERATED (MWH)

NA NA NA

12. REACTOR SERVICE P ACTOR
13. REACTOR AVAILABILITY PACTOR...

NA NA MA

14. UNIT SERVICE PACTOR NA NA NA
15. UNIT AVAILASILITY PACTOR NA NA MA MA MA MA
18. UNIT CAPACITY PACTOR lueng MDC)

"A M

17. UNIT CAPACITY P ACTOR tunne Demon MWel...

NA NA NA

18. UNIT PORCED OUTAGE RATE
19. SHUTDOWNS SCHEDULED OVER NEXT S MONTHS ITYPE. DATE. ANO DURATION OF EACMl:

None

20. IF SMUT DOWN AT END OF REPORT PERICO. ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

PORECAST ACHIEVED INITIAL CRITICALITY l0/2/R4 INITI AL ELECTRICITY 10/74 /R4 COMMERCIAL OPERATION

  • Forecast completion of ascension testing 1/1/85 including contingency, hh Page 3 of 5 QDP-ZZ-04204

o e-

\\

Part E DOCKET NO.

50-483 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway DATE December 5-14R4 COMPLETED BY J. T. Patterson TELEPHONE (3I4) 676-8207 REPORT MONTII NOVFtfRFR 14R4 METHOO OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO.

DATE S: SCHEDULED (HOURS)

REASON REDUC 8NG POWER CORRECTIVE ACTIONS / COMMENTS 9

10/30 Forced 3.2 A

3 Turbine Trip from 30% P'ower due to high vibrations.

10 11/5 Forced 20.5 A

3 Reactor Trip from 45% Power due to failed feedwater regulating valve.

11 11/6 Forced 12.5 A

3 Turbine Trip from 16% Power due to failed main feedwater recirculation valve.

12 11/10 Scheduled 11.0 B

2 Manual Reactor Trip from 48% Power while performing ETT-ZZ-07120, ' Rod Drop and Plant Trip.'

13 11/14 Forced 15.0 A

3 Turbine Trip from 56% Power due to circulating water pump trip.

14 11/26 Scheduled 2.0 B

1 Load reduction while performing sueusARY:

ETT-ZZ-07101, 'Large Load Reduction -

75% Power.'

CA-f804

  • 05/09/84 Page 4 of 5 QDP-ZZ-04204

t o'

Part E DOCKET NO.

50-483 i

l UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway l

DATE December 5, 1984 COMPLETED BY J. T. Patterson REPORT MONTil NOVEMBER 1984 TELEPHONE (31'4) 676-8207 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO.

DATE S: SCHEDULED l HOURS)

REASON REDUCBMG FOWER CO IRECTIVE ACTMNTS 15 11/29 Forced 13.0 A

3 Turbine Trip from 80% Power due to loss of both electrohydraulic control pumps.

4

$UtesARY:

i CA-#804

  • 05/09/84 Page 5 of 5 QDP-ZZ-04204

W J:

c.

l.I NIO N ELECTRIC COMPANY CALLWAY PLANT MAILING ADDREspS:

P. o. sox eso FULTON, MO. 6525I December 7, 1984 Director, Resource Management U. S. Nuclear Regulatory Commission Washington, DC 20555 ULNRC-991 DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT NOVEMBER 1984

Dear Sir:

The enclosed Monthly Operating Report for October 1984 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

/

(L W bv k

S. E. Miltenberger Manager, Callaway Plant T 4e(

JTP/WRC/RRG/drs Enclosure cc: Distribution attached l

N 4..

0, cc distribution-fer ULNRC-991 with enclosures Mr. James G. Keppler Regional Administrator Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Director Office of' Inspection & Enforcement

.U. S.. Nuclear Regulatory Commission Washington, DC. 20555 Records Center Institute of Nuclear Power Operations Suite 1500 1100 Circle 75 Parkway Atlanta, GA 30339 American Nuclear Insurers Library c/o Dottie Sherman The Exchange Suite 245 270 Farmington Avenue Farmington, CT 06032 NRC Resident Inspector Missouri Public-Service Commission D. F. Schnell J. F. McLaughlin J. E. Davis (Z40MOR)

R. L. Powers D. W. Capone A. C. Passwater/D. E. Shafer/D. J. Walker G. A. Hughes W. R. Robinson (QA Record)

P. T. Appleby SEM Chrono 3456-0021.6 Z40ULNRC G56.37 N. Date