i i

V

%d j

OPERATING DATA REPO?!T m

i DOCKET NO.

50-317 g._.

DATE 01-10-85

^ '

i COMPLETED BY EVELYN BEWLEY TELEPHONE (301) 787-5365 OPERATING STATUS E! M M M M M K N M M M M M M M M M

1. UNIT NAME : CALVERT CLIFFS NO. I
2. REPORTING PERIOD M DECEMBER 1984
3. LICENSED THERMAL POWER (MWT) M 2,700 4.

NAMEPLATE RATING (GROSS MWE) M 918

5. DESIGN ELECTRICAL RATING (NET MWE)
  • 845

.l

_ MAXIMUM DEPENDABLE CAPACITY GROSS MWE M 860 _ _

7. MAXIMUM DEPENDABLE CAPACITY (HET MWE) M d25

'8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS HUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS M

~

9. POWER LEVEL TO WilICH RESTRICTED (HET MW) M
10. REASONS FOR RESTRICTIONS.

~l M, O, N, T H, L Y, -Y, R, M T O, N D, A, T E C,U,M,U, L A, T,,I V, E i

l11.HOURSINREPORTINGPERIOD 744.0 8784.0 84613.0

12. HUMBER OF HOURS REACTOR WAS CRITICAL 390.6 7531.0 67497.9 13 ;-' REACTOR ' RESERVE SHUTDOWN HOURS ~ - -
0. 0 -

97.2

'~ 1985.1

14. HOURS GENERATOR ON LINE 382.5 7424.9 66170.8
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0-0.0
16. GROSS TilERMAL ENERGY GENERATED (MWH) 1007090.

19640442.

}7.' GROSS ELECTRICAL ENERGY GENERATED (MWH) 341733.

6615895.

~ 163782737.

54043380.

~~

  • '18.

NET ELECTRICAL ENERGY GENERATED (MWH) 321709.

6321601.

51556566.

l19.UNITSERVICEFACTOR 51.4 84.5 78.2

~

A T

ING MDC NET) ~ ~^ - ~~~ ~~

~ ~ ~ ~

~

~ " - - '

22. UNIT CAPACITY FACTOR (USING DER NET) 51.2 85.2 72.1
23. UNIT FORCED OUTAGE RATE 45.6 15.1 8.4
24. SHUTDOWHS SCHEDULED DVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION)
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP

_26. UNIT IN TEST STATUS (PRIOR COMMERCIAL OPERATION) _ __

FORECAST._

_ _. ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATIDH

~M" 850123d569 841231

'~

Q PDR ADOCK 05000317 R

ll

-g-eon

G.

~

OPERATING DATA REPORT I

DOCKET NO.

50-318

~~

~

~

~DATE 01-10-85'

~

~~

~~

~-

j COMPLETED BY EVELYN BEWLEY TELEPHONE (301) 787-5345 OPERATING STATUS

..,. 3 " " " " " " " " " "f " ".

.~.

~_.e

1. UNIT NAME : CALVERT CLIFFS NO. 2
2. REPORTING PERIOD M DECEMBER 1984
3. LICENSED THERMAL POWER'(MWT) M 2,700.

9 I

4.__NAMEPL ATE. RATIHG_(GROSS._M_ WE)_ M 911

5. DESIGN ELECTRICAL RATING (HET MWE)
  • 845 6.__ MAX _IMUM, DEPENDABLE. CAPACITY _ GROSS MWE.M 860_.

i 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) M 825 h.IF._ CHANGES _0CCUR_ INCAPACITY _ RATINGS (ITEMSN, UMBER.3_THROUGH7) SINCE LAST REPORT. GIVE REASONS M

9. POWER LEVEL TO WHICH RESTRICTED (NET MW) M
10. REASONS FOR RESTRICTIONS.

i MOHTHLY YRMTONDATE CUMULATIVE

'm o n nunnuM

^ ' Mununu

~

11. HOURS IN REPORTING PERIOD 744.0 8784.0 67968.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL

~13.' REACTOR RESERVE SHUTDOWN' HOURS ~~-

~~

~744,0

~~ 6631.0

' ' ~ ~

56558.8 0.0 10.2 ~~~

968.0

~~~

14. HOURS GENERATOR ON LINE 744.0 6504.1 55619.3
15. UNIT RESERVE SHUTDOWN H018RS 0.0 0.0 0.0

.t

16. GROSS THERMAL ENERGY GENcRATED(MWH) 1996846

-~ 16879243.

138720937.

~

111.7.' GROSS' ELECTRICAL ENERGY GENERATED (MWH) 67254.

5'38917.

' 45658203.

~ *i 18. NET ELECTRICAL ENERGY GENERATED (MWH) 64504.!.

5338446.

43542208, i 19. UNIT SERVICE FACTOR 107.0 74.0 81.8
20. UNIT AVAILABILITY FACTOR 100.0 74.0 f21.~ UNIT' CAPACITY FACTOR'(USING MDC NET)~

~

10 5.1 -' - ~ ~ ~ ' 7 3. 7 ~

~

-~

81.8 78.1

22. UNIT CAPACITY FACTOR (USING DER NET)-

102.6 71.9 75.8-i-23. UNIT FORCED OUTAGE RATE 0.0 7.9 6.1 24._ SHUTDOWNS SCHEDULED _0VER THE,HEXT 6 MONTHS.(TYPE, DATE, AND DURATION) :

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP :

26._ UNI.T. IN. _T_EST_.S_T A.~TUS (PRIOR COMMERCI AL OPER ATION)

FORECAST

~'

ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY

[

COMMERCIAL OPERATION

~ ^ ^

~ ~

- ~

Y V

. Y AVERAGE DAILt' UNIT POWER LEVEL i

e DOCKET HO.

50-317

. 1.

UNIT CALVERT CLIFFS NO.

DATE 01-10-85 CortPLETED BY EVELYN BEWLEY-TELEPHONE (301) 787-5365 1

DECEMBER 1984

.l Muununununununnuwwwwumunu DAY' AVERAGE DAILY ~ POWER LEVEL-

~ ~ ~ ~

' ~ ~ ~ ~ " ~ ~ '

'~" ~ -

(MWE - NET) 1 0.

2

-67.~~'~-~~--'~~~~~

"~

~ ~ ~ ~~' ~ - - ~ ~ ~ ~ ~ ~ ~ ~ ~ ' '

~ ~~ ~

~ ' ~

'^

3-867.

4 873.

5__

-_.878.

8,g.

7 877.

8 879.

9 879.

' ~ ~ - ^

10 8 7 9. '" ~

~~ -'

~~

~

' ~ - - ~ ~ '~-

" ~ ~

1 1.-

880.

12 572.

...._.. _ _. - _.. _ 13

..._ 0.

g 15 O.

16 0.

'17 0.

18

~~~ ~ ~ 0.

~~

~ ~~ ^~ ~ ~~ ~ ~

~

~

19 0.

20 0.

,~..~. -..

-_ 21 0.

23 0.

24 0.

25 O.

3__

.-~.685.

~

~

' ~"

~"~

~ ' ~

~ ~

~~

27 878.

28 879.

31 880.

i

-M w

-J 4'.%..=-

_siee-.

g A.

wn em..e.eer

-p

..e.nw e e

,.-es 11

V v'

)

AVERAGE DAILY UNIT POWER LEVEL

...I_

. DOCKET NO.

50-318.-.. -.. _.

UNIT CALVERT CLIFFS NO. 2 DATE 01-10-85 Cor1PLETED BY EVELYN BEWLEY

.. TELEPHONE.(301).787-5365...

DECEMBER 1984 MMMMMMMMMMMMMMMMMMMMMMMMM DAY AVERAGE DAILY PCWER LEVEL

~

~

(MWE - NET) 1 2 --

866.___

867.

3 869.

4 867.

_5_

865.

6 866.

7 866.

8 865.

9_

847.

= _ _

11 868.

12 866.

13' 14

_ _ _ _. _ __ 8 6 6. __

866.

15 845.

16 848.

17.

8 7 0. _. _.

19 869.

l 20 868.

21_._ _____.._ _..._867.

22 869.

23 871.

24 874.

_ 25 873..

I ___

26 873.

27 873.28-874.

I f

_ 2 9 _. _..

__ 874.

30 873.

' [,o 31' 871.

1 w,....e_w+m%--e-_e.,.w.

me.**

enm.

  • * +. -

e

-geW- - - - -

hd e'

.e--

.--M

.=

'e

.e 5

,m

.=m.

. - ~. -

50. 50-317 tr A n.c.a UNIT 5HUTDOWNS AND POWER REDL*CTIONS L* NIT NAME calvert cliffs No'.1 DATE January 14. 1785 -

COMPT.ETED 3Y E. Bewley December REPORT MONT16 TELifMONg (301) 787-5365

  1. L 5

3

$h Cause & ('oesective Leccewe h

!~ g 4

3i&

Ewns 33 h'8 Action so No.

Date 2

f[

E 9 ;f, y Repoes a vi b y'-

Psevent Recurrer.s*

o O

84-11 841201' S

41.3 B

1 CB PUMPXX Reactor was shut down to repair reactor coolant' leaks on 11B Reactor Coolant Pump.

84-12 841212 F

320.2 A

1 CD VALVEX Reactor was shut down to repair'.#11 Main Steam Isolation Valve.

t 3

4 F Forced Reason.

Method:

Esjiits C. Instructions

5. Scheduled A. Equipment fa ! vee (Esplain) 1 Manual for Freparation nf Data
8. Maintenance et Text 2 Manual Scram.

Ener, Sheets for t.icensee r Refact.c

.t Ausonossc scram.

Esent Repues it.E RI File (NUREr D Regt:later) Restsigteen

42. Cont i nuit t ion eltil I t; Operator Tearsmp & Lascuse Esaminalisin f_g,on,1 Redi:ct ion F Admanntsatiu bOEI'"

G4) pee 4: ion.1 L. sue (Espt.in)

Eshitna f $sene Sousee 89/77)

Il45hes(Esrlasal 4

-- - a

50-318 U'A a.4.4 SU.

UNIT SHUTDOWNS AND POWER REDUCTIONS

'L' NIT NAME calvert cliffs N6.2

. D ATE.. Janua ry 14 1985

  • COMPLETED gy E. Bewley REPORT MONTig December TELEPHONE (301) 787-5365 "L

15 48

=

e,,

5%

Cauw A ('c.,sessive a 1 k_I I

7$m 4

Ewns g,

_q ggg,,,,

- Na.

Date 5

2 6 j!

c:E Repuee a ev v

p,,,,,,,,c,,, n c gm{

u C

No outages or reductions to report.

1 l

t-T f

3 4

F: Forced Reason.

MethcJ:

Enhetut C. instreetions 5: SchedulcJ A Equiprnent Failure (Esplain) 1 Manual for Frepar.o un of Data 8.Maintes.a.. e of Test 24tanual Scram.

Ense, sheets ro Licensee t' Refuet.c; 1 Aulunatsc Scra n.

Esent Recues (LE RI File (NUREf D-Regt:lator) Restsi.sion 4utontinuation 01619 I. Opet:alor Tsaining & l.secnw Esarsnation 5-1,oad. Redt:c t i on F Ademnnteatise UC I'"

G4hevaison.1 Eteur (Espiarn)

E sti&s ! - Saow Sousec t**/ 77)

It4'ihen tE si tain)

January 2,1985

~ REFUELING INFORMATION REQUEST 1.

Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No.1 2.

Scheduled date for next Refueling Shutdown: March 30,1985 3.

Scheduled date for restart following refueling: May 18,' 1985 '

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amer.dment?

Resumption of operation after refueling ;will not require changes to Technical

. Specifications.

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

February 20,1985

. 6.

Important licensing considerations associated with the refueling.

Reload fuel will be similar to that reload fuel inserted into the previous cycle.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

(a) 217 (b) 868 i

Spent Fuel Pools are common to Units 1 and 2 8.

(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

(a) 1830 (b)0 9.

The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load. -

I April,1991 1

7 g

_k,,'

,2

January 2,1985 REFUELING INFORMATION REQUEST

1. Name of Facility: - Calvert Cliffs Nuclear Power Plant, Unit No. 2.
2. Scheduled date for next refueling shutdown: October 5,1985.
3. Scheduled date for restart following refueling: December 8,1985.
4. Will refueling or resumption of operation thereafter require a technical specification change or other licensed amendment?

Resumption of operation after refueling will require changes 'to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.

5. Scheduled date(s) for submitting proposed licensing action and supporting information.

September 2,1985

6. Important licensing considerations associated with refueling.

j; Reload fuel will be similar to that reload fuelinserted in the previous cycle.

7. The number of fuel assemblies (a) in the core and (b) in the Spent Fuel Storage Pool.

(a) 217 (b) 868 1

Spent Fuel Pool is common to' Units 1 and 2.

8. (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been required or is planned, in number of fuelassemblies.

(a) 1830 (b)0

9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.

April,1991 l

l i

SUMMARY

OF UNIT 1 OPERATING EXPERIENCE FOR 1

DECEMBER 1984 12/1 At the beginning of this reporting period, Unit I was at 429 MWe with the reactor at 59% power in the process of shutting down to repair reactor coolant leaks on 11B Reactor Coolant Pump (RCP) shaf t seal cartridge upper sensing line and packing leaks on a pressurizer instrument and a pressurizer sample valve. At 0103 the unit was removed from the grid.

12/2 Commenced start-up at 0157. The reactor was taken critical at 1325 and the unit paralleled to the grid at 1823.

12/3 Resumed full load operation (869 MWe) at 0431.

12/4 Reduced load to 833 MWe at 0840 to clean main condenser water boxes.

Resumed full load operation (879 MWe) at 1240.

12/12 At 1505 shutdown was commenced when 11 Main Steam Isolation Valve (MSIV) was declared inoperable.

12/25 Commenced start-up at 1158. At 2142 the reactor was taken critical.

12/26 At 0052 the unit was paralleled to the grid and reached full power (868 MWe) at 1145.

12/31 At the end of this reporting period, Unit I was at 880 MWe with the reactor at 100% power.

SUMMARY

OF UNIT 2 OPERATING EXPERIENCE FOR DECEMBER 1984 12/1 At the beginning of this reporting period, Unit 2 was operating at 868 MWe with the reactor at 100% power.

12/8 At 2240 reduced power to 730 MWe to tast main turbine control valves.

12/9 Resumed fullload operation (868 MWe) at 0600.

12/14 Decreased load to 845 MWe at 2155 for Moderator Temperature Coefficient measurement. -

12/16 Resumed full load operation (870 MWe) at 2300.

12/31 At the end of this reporting period, Unit 2 was at 872 MWe with the reactor at 100% power.

]

.=

S

- + o-g BALTIMORE -

GAG AND El.ECTRIC CHARLES CENTER. P.O. BOX 1475 BALTIMORE, MARYLAND 21203 IO$51L POWER DEPARTMENT January 14, 1985 Director 0ffice of Inspection aal Enforement U. S. Nuclear Fegulatory Commission Washington, D.C.

2005 ATIENTION: lbetnent Control Desk Centlenen:

Enclosed herewith is the Deember 1984 - Operation Status Report for Calvert Cliffs No. I thit,

-(Ibdet 50-317) and Calvert Cliffs No. 2 Unit, (Dodet 50-318).

Sincerely, blffas $0/Af2N/

E. K./Bewley Economy Clerk Production Emnmpf and Results Unit Fossil Power Departnent Enc.losure cc:

Messrs E. Wexi:ger T. Foley

. R. R. ttills L. Ilussell P. Iloss P. Sierer, Jr.

M. Beebe B. H. Amoss, II D. Reilly R. Ash T. Magette J. Tiernan A. h nivall K. Gibbard EKB/kic WP/ E t