Responds to Transmitting List of Safety Evaluation Review Items.Meeting Planned for Jan 1985 to Finalize Info & to Provide Responses or Schedule of Responses to Questions
ML20113E280
Person / Time
Site: Clinton Constellation icon.png
Issue date: 01/17/1985
From: Spangenberg F
ILLINOIS POWER CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
U-0783, U-783, NUDOCS 8501230398
Download: ML20113E280 (1)


Text

U -0783 L19 -85(01-17)-L 1A.120 ILLINDIS POWER 00MPANY IP CLINToN POWER STATION. P.o. 80x 678. CLINToN. ILLINo S 61727 January 17, 1985 Docket No. 50-461 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U. S, Nuclear Regulatory Commission Wsehington, D. C. 20555 Stbject: Clinton Power Station Unit 1 Safety Evaluation Review

Dear Mr. Schwencer:

This is in response to your letter dated December 13, 1984 transmitting the following lists:

1. Items requiring Region III confirmation of implementation.
2. Items identifying Applicant commitments
3. Items that identify NRC Staff commitments
4. . Items potentially requiring licensing conditions (other than those identified in Section 1-11 of the SER)
5. Items specifically identified as requiring Technical Specifications (other than those identified in Chapter 16 of the SER and SSER-1)
6. Miscellaneous questions and items requiring actions by either the NRC Staff, Region III or Illinois Power As indicated in your letter, Illinois Power is currently preparing similar information and will compare this information with the information provided in your' letter. A meeting with your Mr. Byron Siegel is planned for January 1985 to finalize this information and to provide either responses to your questions or provide a schedule when responses to these questions will be provided.

Sincerel ours, f

O G. s t h

F. A. S ange erg Direct - I lear censing and Configuration TLG/ls Nuclear Station Engineering cc: B. L. Siegel, NaC Clinton Licensing Project Manager NRC Resident Office Regional Administrator, Region III, USNRC Illinois Department of Nuclear Safety M OO l '0