ML20112G304
| ML20112G304 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 04/11/1996 |
| From: | CENTERIOR ENERGY |
| To: | |
| Shared Package | |
| ML20112G293 | List: |
| References | |
| NUDOCS 9606110253 | |
| Download: ML20112G304 (1) | |
Text
{
l l
ItIDUSTRIAL PRETREATMENT QUARTERLY SELF-MONITORING RESULTS Perry Nuclear Power Plant Permit No.
1004911 10 Center Rd.
Report Date:4/11/96 Perry, Ohio 44081 Laboratory: Electro Analytical Date of Sample: 4/1 to 4/2/96 Time of sample: 17:55 Sample Location: Sewage Pump Station Name of Sampler: Michael Ward Laboratory Address: 7118 Industrial Park Blvd.
Mentor, OH 44060 Date of Analysis: 4/2 to 4/8/96 Flow: 33,000 gpd PARAMETER SAMPLE EPA ANALYSIS ANALYSIS TYPE METHOD DATE RESULT COD Composite 410.4 4/3/96 330 mg/L BOD Composite 405.1 4/8/96 140 mg/L TSS Composite 160.2 4/8/96 81 mg/L Silver Composite 272.1 4/8/96
<.010 mg/L Mercury Composite 245.1 4/4/96
<.50 ug/L pH Grab 150.1 4/2/96 8.2 s.u.
Oil / Grease Grab 413.1 4/5/96 23 mg/L Gravimetric I certify under penalty of law that I have personally examined and I am familiar with the information in this report and that, based on my inquiry of those persons immediately responsible for obtaining the information contained in this report, I believe that the information is true, accurate, and complete.
I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment ')
i)
.b (,
N f,, -
sw.
/l Sr. Vice President - Nuclear l
Signature Date Title 9606110253 960605 ADOCK0500g0 l
PDR R