ML20112G300

From kanterella
Jump to navigation Jump to search
Industrial Pretreatment Quarterly Self-Monitoring Results
ML20112G300
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 05/13/1996
From:
CENTERIOR ENERGY
To:
Shared Package
ML20112G293 List:
References
NUDOCS 9606110248
Download: ML20112G300 (1)


Text

INDUSTRIAL PRETREATMENT QUARTERLY SELF-MONITORING RESULTS Perry Nuclear Power Plant Permit No.

1004911 10 Center Rd.

Report Date: 5/13/96 Perry, Ohio 44081 Laboratory: Electro Analytical Date of Sample: 5/1/96 to 5/2/96 Time of sample: 10:50 Sample Location: Sewage Pump Station Name of Sampler: Michael Ward Laboratory Address: 7118 Industrial Park Blvd.

Mentor, OH 44060 Date of Analysis: 5/2 to 5/9/96 Flow: 33,000 gpd PARAMETER SAMPLE EPA ANALYSIS ANALYSIS TYPE METHOD DATE RESULT COD Composite 410.4 5/3/96 260 mg/L BOD Composite 405.1 5/7/96 240 mg/L TSS Composite 160.2 5/6/96 180 mg/L Silver Composite 272.1 5/9/96

<.10 mg/L Mercury Composite 245.1 5/6/96

<.50 ug/L pH Grab 150.1 5/2/96 8.2 s.u.

Oil / Grease Grab 413.1 5/6/96 36 mg/L Gravimetric I certify under penalty of law that I have personally examined and I am familiar with the information in this report and that, based on my inquiry of those persons immediately responsible for obtaining the information contained in this report, I believe that the information is true, accurate, and complete.

I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment.

.I]

('l}D('

1 p,'

Sr. Vice President - Nuclear Signature Date Title 9606110248 960605 PDR ADOCK 05000440 R

PDR