VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 85-02 FOR THE MONTH OF FEBRUARY, 1985 I'
f-l -.
i i:
E E>f 3
8503260578 850228 i
PDR ADOCK 05000271
,/l/
l R
PDR l-i
OPERATING DATA REPORT Docket No.
50-271 Date 850308 Completed by F.J. Burger Telephone (802) 257-7711 OPERATING STATUS Notes:
1.
Unit Name:
Vermont Yankee 2.
Reporting Period: February 3.
Licensed Thermal Power (MWt):
1593 4.
Nameplate Rating (Gross MWe):
540 5.
Design Electrical Rating (Net MWe): 514(OC)504(CC) 6.
Maximum Dependable Capacity (Gross MWe'):
535 7.
Maximum Dependable Capacity (Net MWe):
504 8.
If changes occur in capacity ratings (Items Number 3 through 7) since last report, give reasons:
N/A 9.
Power level to which restricted, if any (Net MWe):
N/A
- 10. Reasons for restrictions, if any:
N/A This month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 672.00 1416.00
- 12. Number of Hours Reactor was Critical 656.97 1400.97 88214.90
-13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 24. Hours Generator On-Line 651.55 1395.55 85825.62
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH) 1014624.00 2195059.00 124754068.50
- 17. Gross Electrical Energy Generated (MWH) 344,027.00 744606.00 41534354.00
- 18. Net Electrical Energy Generated (MWH) 329,998.00 714406.00 39415254.00
- 19. Unit Service Factor 96.96 98.56 78.70
- 20. Unit Availability Factor 96.96 98.56 78.70
- 21. Unit Capacity Factor (using MDC Net) 97.43 100.10 71.71
- 22. Unit Capacity Factor (using DER Net) 95.54 98.16 70.31
- 23. Unit Forced Outage Rate 3.04 1.44 7.29
- 24. Shutdowns scheduled over next 6 months (Type, Date and Duration of Each):
1985 Refuelino Outage to begin September 14, 1985 and continue throuah April 26, 1986.
- 25. If shut down at end of report period, estimated date of startup:
- 26. Units in Test Status (prior to commercial operation):
Forecast Achieved Initial Criticality Initial Electricity Commercial Operation MSR.F1
' AVERAGE DAILY l UNIT POWER LEVEL Docket No.
50-271 Unit Vermont Yr.nkee Date 85P308 Completed by F..{. Burger Telephone (802) 257-7711
' MONTH -February DA AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY P0hER LEVEL
-_ MWe-Net)
(MWe-Net)
(
1 518 17 514
^
'2 427 18 519 3
495 19 519 4
'518 20 519' 5-519 21 519 6'
238 22 518 7
218 23 519 8
490 24 511 9
487 25 519 10 515 26 518 11 519 27 518 12 519 28 518 13 519 29 14 520 30 15 520 31 16' 520 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in_the reporting month. Compute to the nearest whole megawatt.
MSR.F2
Dockst No.
50-271-Unit Vermont Yrnkee UNIT SHUTDOWNS APO POWER REDUCTIONS Date 850308 Completed by F.J. Burger REPORT' K) NTH February Telephone (802) 257-7711-1 2
3 4
5 No.
Date Typed Duration Reason Method of License System Component Cause and Corrective Action to (hours)
Shutting Down Event Code Code Prevent Recurrence Reactor Report #
85-02 850202 S
0 B
4 N/A RB CONROD Power reduction for control rod Power pattern exchange and turbine Reduction surveillance.
85-03 850206 F
20.45 A
3 85-04 IA INSTRU.
Main Turbine trip and subsequent
. reactor scram were caused by an erroneous trip signal traced to corroded test switch contacts.
The switch was replaced.
85-04 850209 S
0 8
4 N/A RB CONR00 Power reduction for control rod Power pattern adjustment and turbine Reduction surveillance.
1 2
3 4
F-Forced A-Equipment Failure (Explain)
Method Exhibit G - Instructions S-Scheduled B-Maintenance or Test 1-Manual for Preparation of Data Entry C-Refueling 2-Manual Scram Sheets for Licensee Event D-Regulatory Restriction 3-Automatic Scram Report (LER) File (NUREG 0161)
E-Operator Training and License Examination 4-Other (Explain)
F-Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source H-Other (Explain)
MSR.F3
.r 1 e
e 1 e
g 7 N
I k
r 7 O
7 n 8 u
I h
2 a 0 B 7
T c
Y 3
5 C
t 0
0 2
A i
5 t
5 J.
w n 8
)
E S
o F
2 V
m 0
I d
r y8 T
e e
b(
C c
.V E
a o
de R
l N
en R
p t o O
e t'
e h C
R l
p ktepe citml onaoe DUDCT e
g-ed anre to m
lcdm o
ea T
vspr L
spc U
dois S
err E
sctd R
aa n.
e sat N
r pt n
O cocya I
nraal T
Idtl p CNU s
F t
L c
A a
M tno E
C SU d
A e
C dorro C
EG E
A 4
C T
0 N
U A
OR 5
N E
8 OM R
R ETN U
E I
RN L
A E
M L
DET E
e6 A
FC v5 L
ON i2 E
A t0 R
EN c-RE e5 Y
UT r8 T
TN rCm o
E AI F
NA A
M S
hc t
iw T
S N
E ts P
e I
T UQ y
E arp8 S4 1 4
eS F.
rA o4 R
C1 SM
r Docket No.
50-271 Unit Vermont Yankee Date 850308 Completed by F.J. Burger Telephone (802) 257-7711 REPORT MONTH February
SUMMARY
OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 94.8 % of rated thermal power for the month. Gross electrical generation was 344,027 MWH or 94.8% of design electrical e
capacity.
Operatino Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:
At the beginning of the reporting period the plant was operating at 99.8% of rated thermal power.
850202 At 0800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br /> a power reduction was initiated for control rod &
turbine surveillance.
850202 At 1020 hours0.0118 days <br />0.283 hours <br />0.00169 weeks <br />3.8811e-4 months <br /> a return to full power was started.
850206 At 1104 hours0.0128 days <br />0.307 hours <br />0.00183 weeks <br />4.20072e-4 months <br /> the main turbine tripped and the reactor scrammed.
(See Unit Shutdowns & Power Reductions.)
850207 At 0206 hours0.00238 days <br />0.0572 hours <br />3.406085e-4 weeks <br />7.8383e-5 months <br /> the reactor was critical.
850207 At 0731 hours0.00846 days <br />0.203 hours <br />0.00121 weeks <br />2.781455e-4 months <br /> the turbine generator was phased to the grid.
At the end of the reporting period the plant was operating at 99.8% of rated
-thermal power.
MSR.F5
.,4 VERhiONT YANKEE NUCLEAR POWER CORPORATION P. O. BOX 157 GOVERNOR IIUNT ROAD VERNON, VERMONT 05354 VYV 85-124 March 8,1985 U. S. Nuclear Regulatory Commission Director, Office of Management Information and Program' Control Washington, D. C.
20555 Daar Sir:
Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of February,1985.
Very truly yours, VERMONT YA*EE NUCLEAR POWER CORPORATION b
4e t~s Vice President and (v Warren P. Murphy j
Manager of Operations WPMNJB/pt:MSR1.1
+$
,\\,