Second Interim Deficiency Rept Re Disagreement in Mode Analysis Data.Initially Reported on 831024.Operating Modes Being Reviewed,Revised & Formally Issued.Next Rept Will Be Submitted by 860328
ML20112D335
Person / Time
Site: Bellefonte  
Issue date: 12/20/1984
From: Hufham J
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8501140214
Download: ML20112D335 (1)


Text

h

,d

q t AUTHORITY

.T NE

[ d5 N aknht NEre*e*t koweY II

\\

dDbcmber 20, 1984 q

gt\\ U BLRD-50-438/84 BLRD-50-439/84-50 U.S.: Nuclear Regulatory Commission

- Region II Attn:

Mr. James P. O'Reilly, Regional Administrator 101 Marietta~ Street, NW, Suite 2900 Atlanta, Georgia 30323 s

Dear Mr. O'Reilly:

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - DISAGREEMENT IN MODE ANALYSIS DATA

- BLRD-50-438/83-57, BLRD-50-439/83 SECOND INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector P. E. Fredrickson on October 24, 1983 in accordance with 10 CFR 50.55(e) as NCR BLN GB 8307. This was followed by our interim report dated November 22, 1983 Below is our second interim report. We expect to submit-our next report by March 28, 1986.

TVA's Office of Engineering's (OE) Bellefonte Nuclear Plant Engineering Project :(BLEP) is currently reviewing and revising.the operating modes. The operating modes are being formally issued to meet the requirement of-controlling these' documents.

If you have any questions,' please get in touch with R. H. Shell at -

- FTS 858-2688.

Very truly=yours, TENNESSEE VALLEY AUTHORITY L

og J

. Hb:hal,' Manager-L ensing'an i Regulations

- cc:

Mr.' Richard C. DeYoung, Director Office of Inspection and Enforcement U.S. : Nuclear Regulatory Commission :

Washington, D.C. '20555 Records Center

~

Institute of Nuclear Power Operations 1100. Circle 75 Parkway, Suite 1500 Atlanta, Georgia' 30339 85] 1 O

~

s f:~

c o

An Equa! Opportunity Employer._

4 c-

.