MONTHLY OPERATING REPORT DOCKET NO.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE FEBRUARY 5, 1985 COMPLsTw BI R.
R.'COODENOW TELEPHONE n141 676-8460 PART A OPERATIONS
SUMMARY
JANUARY 1985 Reduced load levels due to high dissolved oxygen in the condensate and the feedwater from January 1 to January 16.
Also had reduced load on Januarv 7 due to heater drain pump seal problem.
Full power operatior was maintained for the remainder of the month. except as noted in Part E.
o PART B PORV AND SAFETY VALVE
SUMMARY
None
/
Tf52'l 8503100474 850131 PDR ADOCK 0500 3
R CA-#804 4
05/09/84 QDP-ZZ-04204 Page 1 of 4
i e
?!
f, 1
i I
Part C AVERAGE DAILY UNIT POWER LEVEL
?'
l 50-483 i
DOCKET NO.
f UNIT Callaway I
i DATE FEBRUARY 5.1985 R. R. C00DENOW COMPLETED BY TELEPHONE (314) 676-8460 1
i l
MONTH JANUARY 1985 t
DAY AVERAGE dally POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l
(MWe-Net)
(MWe-Net) 1102 i
491 iy 3
1102 175 l
2 1098 19 3
1095 758 20 4
1072 710 21 5
705 1085
- g 3
1056 I
278 23 y
987 372 24 l
8 457 1088 3
1104 453 3
10 1107 1
453 p
ills 455 g
12 454 1114 13 3
459 1114 14 3g 538 272 33 1011 16 l
l g
1 0[
4 Page 2 of 4 QDP-ZZ-04204 e
..- l'~,
.i
,, l, ' ;. -
- , ~
'[
t 1
?
\\
'e Part D
{5 OPERATING DATA REPORT 50-483 00CKET NO.
Callaway UNIT OATE FEBRUARY 5,1985 r
R. R. C00DENOW COMPLETED SY (314) 676-8460
.g TELEPHONE I.
t OPER ATING STATUS 7
JANUARY 1985 Gross HOURS IN REPORTING PERIOD:
744
- 1. REPORTING PERIOD:
3411 MAX. DEPEND. CAPACITY (MWe Not): Not vet known 1
- 2. CURRENTLY AUTHORIZED POWER LEVEL {MWt):
l DESIGN ELECTRICAL MATING (MWe Ned:
1120 100%
g
- 3. POWER LEVEL TO WHICH RESTRICTED llP ANY) (MWe Neti:
h
- 4. REASONS FOR RESTRICTION llP ANY):
THIS MONTH YR TO DATE CUMULATIVE 724.5 724.5 1027.0
- 5. NUMeER OF HOURS REACTOR WAS CRITICAL f
0 0
0
- 6. REACTOR RESERVE SHUTDOWN HOURS 705.0 705.0 1007.5 I
- 7. HOURS GENERATOR ON LINE i
j 0
0 0
- 8. UNIT RESERVE SHUTDOWN HOURS 1.825.925 1.925.874 7.R77.169
- 9. GROSS THERMAL ENERGY GENER ATED (MWH) 607,913 607,913 947,093 l
to. GROSS ELECTRICAL ENERGY GENER ATED IWWHI.
- 11. NET ELECTRICAL ENERGY GENER ATED IMWH) e -A 97.4%
97.4%
98.1%
- 12. REACTOR SERVICE P ACTOR t
97*4 97*0%
90*1%
{
is. REACTOR Ava LAslLITY P ACTOR 94.8%
94.8%
96.3%
[
14 UNIT SERVICE P ACTOR F
94.8%
94.8%
96.3%
- 15. UNir AVAILAelLITY P ACTOR NA NA NA
- 18. UNif CAPACITY P ACTOR lumas MDCI 68.3%
68.3%
76.17 17 UNIT CAPACITY P ACTOR (Unne Demon MWel....
E 5.2%
5.2%
- 3. 7'r
- 18. uNif PORCED OUTAGE RATE
- 19. SHUTOOWNS SCHEDULED OVER NEXT 4 MONTHS (TYPE. OATE. ANO DURATION OF EACHl: None NA l
- 20. IP SHUT DOWN AT END OF REPORT PERIOD ESTIMATED DATE OP STARTUP:
I'
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
PORECAST ACHIEVED ii l
10/2/84 INITI AL CRITICAUTY e
10/24/84 g
INITI AL ELECTRICITY 12/19/84*
COMMERCIAL OptRATiOg
- Unit placed in service. Commercial operation pending Missouri Public hh484 Service Commission hearing.
Page 3 of 4 QDP-ZZ-04204
o DOCKET NO.
50-483 Part E UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway I) ATE FEBRUARY 5, 1985 R. R. GOODENOW COMPLETED BY TELEPHONE (314) 676-8460 REPORT MONTil JANUARY 1985 METHOO OF SHUTTBMG DOWN 1YPE F: FORCED DURATION THE REACTOR OR NO.
DATE S: SCHEDULED (HOURSI REASON REDUC 4NG POWER CORRECTIVE ACTIONS / COMMENTS 1
850102 Forced 10.8 A
3 Reactor Trip f rom 100% " Power due to feedwater isolation valve failing closed. LER 85-001-00 2
850107 Forced 10.8 A
3 Turbine Trip from 50% Power due to indication of turbine high vibration.
LER 85-002-00 3
850131 For'ced 17.4 A
3 Turbine Trip from 100% Power due to main generator loss of field.
LER 85-005-00
SUMMARY
i CA-f804
' 05/09/84 Page 4 of 4 QDP-ZZ-04204
UNION EtecTaic COMPANY CALLAWAY PLANT MAILING AC DRESS:
P. O. BOX 8 20 FULTON. MO. 8 5 2 5 9 February 7, 1985 Director, Resource Management U. S. Nuclear Regulatory Commission Washington, DC 20555 ULNRC-1035
Dear Sir:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT JANUARY 1985 The enclosed Monthly Operating Report for January 1985 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
s bf m
kw
[L[ob b
S. E. Miltenberger Manager, Callaway Plant
/ /vdc Cf.
NET /WRC/RRG/drs l
Enclosure ec: Distribution attached stAa 4
cc distribution for ULNRC-1035 with enclosures Mr. James G. Keppler Regional Administrator Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission i
f Washington, DC 20555 Records Center Institute of Nuclear Power Operations Suite 1500 1100 Circle 75 Parkway Atlanta, GA 30339 American Nuclear Insurers Library
.l c/o Dottie Sherman The Exchange Suite 245 270 Farmington Avenue Farmington, CT 06032 NRC Resident Inspector Missouri Public Service Commission D. F. Schnell J. F. McLaughlin J. E. Davis (240MOR)
R. L. Powers D. W. Capone A. C. Passwater/D. E. Shafer/D. J. Walker G. A. Hughes W. R. Campbell M. E. Taylor W. R. Robinson (QA Record)
R. R. Goodenow P. T. Appleby SEM Chrono 3456-0021.6 Z40ULNRC G56.37 N. Date
_ _ - _ _ _ _ _ _ _ _ _ _ _