L-2020-075, Relief Request No. 6 Notification to Withdraw Relief Request for Train a CCW Return Piping
(Redirected from ML20110A000)
Jump to navigation
Jump to search
| ML20110A000 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 04/19/2020 |
| From: | Hess R Florida Power & Light Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| L-2020-075 | |
| Download: ML20110A000 (2) | |
Text
Florida Power & Light Company 9760 S.W. 344th Street Homestead, FL 33035 April 19, 2020 L-2020-075 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-0001 Re:
Turkey Point Unit 3 Docket Nos. 50-250 Subsequent Renewed License No. DPR-31 Relief Request No. 6 Notification to Withdraw Relief Request for Train A CCW Return Piping
References:
- 1. Florida Power & Light Company (FPL) letter L-2020-056, Turkey Point Unit 3, Fifth Ten-Year Inservice Inspection Interval Relief Request No. 6, dated March 30, 2020.
NRC's document management system (ADAMS) ML accession number:
- 2. Florida Power & Light Company (FPL) letter L-2020-073, Turkey Point Unit 3, Fifth Ten-Year Inservice Inspection Interval Revised Relief Request and Supplemental Information for Train B CCW Return Piping, dated April 13, 2020. NRC's document management system (ADAMS) ML accession numbers: ML20104B999 for the nonproprietary submission and ML20104C000 for the proprietary submission.
- 3. Electronic Mail, from NRCs Senior Project Manager Turkey Point, Ms. Eva Brown to Mr. Robert Hess Licensing Manager Turkey Point, Titled DRAFT: Turkey Point Unit 3 - Relief Request Concerning CCW Header Weld Repairs (EPID L-2020-LLR-0040),
dated April 14, 2020
- 4. Florida Power & Light Company (FPL) L-2020-074, Response to Request for Additional Information for Relief Request No. 6, dated April 15, 2020. NRC's document management system (ADAMS) ML accession number: ML20106F200 In Reference 1, FPL requested relief from the applicable American Society of Mechanical EngineersSection XI Code (ASME Code) requirements to repair certain sections of the degraded Unit 3 Component Cooling Water (CCW) supply and return piping by installing a welded proprietary repair device, PMCap Restoration Method - US Patent 6,860,297 without removing the sections of degraded piping.
In Reference 2, FPL submitted the Revised Relief Request No.6 for the Trains A and B return piping, and provided supplemental information for the Train B CCW return piping.