ND-20-0309, ITAAC Closure Notification on Completion of ITAAC E.3.9.05.01.04 (Index Number 852)

From kanterella
(Redirected from ML20108F569)
Jump to navigation Jump to search
ITAAC Closure Notification on Completion of ITAAC E.3.9.05.01.04 (Index Number 852)
ML20108F569
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 04/17/2020
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-20-0309
Download: ML20108F569 (6)


Text

Michael J. Yox 7825 River Road

^Southern Nuclear Regulatory Affairs Director Vogtle3&4 Waynesboro, GA 30830 706-848-6459 tel April 17, 2020 Docket Nos.;52-025 ND-20-0309 10 CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC E.3.9.05.01.04 findex Number 8521 Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant(VEGP) Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item E.3.9.05.01.04 [Index Number 852]for confirming the Technical Support Center(TSC) is located within the protected area, and no major security barriers exist between the TSC and the VEGP Unit 3 control room. The closure process for this ITAAC is based on the guidance described in Nuclear Energy Institute (NEI) 08-01, "Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52," which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Tom Petrak at 706-848-1575.

Respectfully submitted, Michael J. Yox Regulatory Affairs l3irector Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant(VEGP) Unit 3 Completion of ITAAC E.3.9.05.01.04 [Index Number 852]

MJY/RLB/sfr

U.S. Nuclear Regulatory Commission ND-20-0309 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company M Peter P. Sena III (w/o enclosures)

M D. L. McKinney (w/o enclosures)

M M. D. Meier (w/o enclosures)

M D. H. Jones (w/o enclosures)

M G. Chick M M. Page M P. Martino M M. J. Yox M A. 8. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. C. T. Defnall Mr. C. E. Morrow Mr. R. L. Belike Mr. 8. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Requlatorv Commission M W. Jones (w/o enclosures)

M . C. P. Patel M G. J. Khouri Ms. 8. E. Temple M N. D. Karlovich M . A. Lerch M C. J. Even M B. J. Kemker Ms. N. C. Coovert M C. Welch M J. Gaslevic M V. Hall M G. Armstrong Ms. T. Lamb M M. Webb M T. Fredette M C. Weber M 8. Smith M C. Santos M s. M. Bailey M . 8. Rose M . B. Davis M . J. Vasquez M . J. Eargle

U.S. Nuclear Regulatory Commission ND-20-0309 Page 3 of 3 Ms. K. Garrlngton Mr. P. Heher Mr. M. King Mr. E. Davidson Qqlethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authoritv of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Daiton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. Oriani (w/o enclosures)

Mr. D. 0. Durham (w/o enclosures)

Mr. M. M. Corletti Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. J. E. Hesler, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., CDS Associates, Inc.

Mr. 8. Roetger, Georgia Public Service Commission Ms. 8. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Balch Bingham

U.S. Nuclear Regulatory Commission ND-20-0309 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-20-0309 Enclosure Vogtle Electric Generating Plant(VEGP) Unit 3 Completion of ITAAC E.3.9.05.01.04[Index Number 852]

U.S. Nuclear Regulatory Commission ND-20-0309 Enclosure Page 2 of 3 ITAAC Statement Program Commitment 5.1 The licensee has established a technical support center(JSC) and an onsite operations support center(OSC).[H.I]

I nspections/Tests/Analvses 5.1 An inspection of the as-built JSC and OSC will be performed, including a test of the capabilities.

Acceptance Criteria 5.1.4 The TSC is located within the protected area, and no major security barriers exist between the TSC and the control room.

ITAAC Determination Basis Multiple ITAAC are performed to confirm that the licensee has established a technical support center(TSC)and an onsite operations support center (OSC). This ITAAC performs an inspection of the TSC location to confirm that the as-built TSC is located within the protected area, and no major security barriers exist between the TSC and the Vogtle Electric Generating Plant(VEGP) Unit 3 control room. As described in NUREG-0696, Functional Criteria for Emergency Response Facilities (Reference 1), there should be no major security barriers between the TSC and the control room other than access control stations for the TSC and control room.

An inspection (walkdown) was completed using TSC and protected area approved construction drawings and visual observations to confirm that the as-built TSC is located within the protected area. The inspection also documents the performance of a visual observation walkdown of the travel path between the VEGP Unit 3 control room and the TSC to confirm there are no major security barriers between the TSC and the control room other than the access control stations to the TSC and control room.

The inspection results are documented in Principal Closure Document SV3-ERF-ITR-800852 (Reference 2) supporting the Unit 3 ITAAC E.3.9.05.01.04 Completion Package (Reference 3) and verify that the TSC is located within the protected area, and no major security barriers exist between the TSC and the VEGP Unit 3 control room.

Reference 2 is available for NRC inspection as part of the Unit 3 ITAAC E.3.9.05.01.04 Completion Package (Reference 3).

ITAAC Finding Review In accordance with plant procedures for ITAAC completion. Southern Nuclear Operating Company(SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC E.3.9.05.01.04 (Reference 3)and is available for NRC review.

U.S. Nuclear Regulatory Commission ND-20-0309 Enclosure Page 3 of 3 ITAAC Completion Statement Based on the above information, SNO hereby notifies the NRG that ITAAC E.3.9.05.01.04 was performed for VEGP Unit 3 and that the prescribed acceptance criteria were met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References(available for NRG inspection)

1. NUREG-0696, Functional Criteria for Emergency Response Facilities, 1981
2. SV3-ERF-ITR-800852, Rev. 0,"Unit 3 ITAAC 852 Walkdown Inspection: ITAAC E.3.9.05.01.04"
3. E.3.9.05.01.04-U3-CP-Rev0, ITAAC Completion Package