- t
. /
.t, v 4
'l 3
- m s,..
~
~
NIAGARA MOHAWK POWER CORPORATION t
.i NINE MILE POIhT NUCLEAR STATIOR UNIT #1 NARRATIVE OF OPERATING EXPERIENCE t
The station operated 61 ring the month of Se::tember 1.984 with a Unit Availability Factor ' f 100.0% and a Net Jesign Electrical Capacity o
Factor of 9S.3%.
There were O
chall'crges to Electromatic Relief Valves. Reductions in Capacity Factor were due.to warm circulating water temperatures and Rod Sequence Exchange g
e n <
O' CLASS I WORK - MECHANICAL MAINTENANC ; September 1984 t
- 11 FW Blocking valve BV 29-38, tighten packing WR# 287S1 CRD 34-19 Foot valve 111 - replaced packing and 0-rings
,/
WR# 28682 Flow Glass FG S4-61 leaks, replaced gaskets WR# 23440 Installed new door bottoms on' Control Room Doors D716 'D73 WR# 28664 CRD 30-47 Foot valva 111 - replaced packing
,9 O
CLASS I WORK - INSTRUMENTATION 6 CONTROL - September 1984 t9 No Class I, Safety Related, Corrective Maintenance performed this month.
CLASS I WORK - ELECTRICAL MAINTENANCE - September 1984 m
'o No Class I, Safety Related,, Corrective Maintenance performed this month.
4 J.E 3
MO 192'7 This major order involves updating station equipment-for Equipment Qualification. The work performed includes
. wiring replacement solenoids, position limit switches and sealing the condulets.
In addition, motor connections have been reworked and Limitorque operators inspected for replacement parts. The systems involved are H -02 Containment 2
Radiation Monitoring, Core Spray, Reactor Building Closed Loop Cooling and Post Accident Sampling.
,e t
y a.
okOOhho PDR Yy
.I OPERATING DATA REPORT 3.s DOCKET NO. 50-220 DATE 10/3/84 COMPLETED BY T.W. Roman i TELEPHONE 315-349-2422 l
OPERATING STATUS
- 1. Unit Nesne.
Nine Mile Point Unit #1 Notes
- 2. Reportsag Period. September 1984 9/1/84 - 9/30/54
' 3. Licensed Theranal Power (MWt):
1850
- 4. Nansepiste Rating (Gross MWe):
640
- 5. Demen Electrical Rating (Net MWe):
630 620
- 6. Maximusn r_.
' "- Capacky (Gross MWe):
- 7. Maxhaum E, ' " Carecity (Net MWe):
610 l
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons.
+
f
- 9. Power Level To Whici; Restricted. lf Any (Net MWe):
c,,3
- 10. Reasons For Restrictions. If Any:
j (D
el s
This Month Yr..to-Dete Cumulative
- 11. Hours In Reporting Period 720 6576.0 131856.2
- 12. Number Of Hours Reactor Was Critical 720 4289.5 90590.7 g
- 13. Reactor Reserve Shutdown Hours 0
0 1204.2
,~
- 14. Hours Generator On4. hie 720 4226.5 87714.8 1
- 15. Unit Reserve Shutdown Hours 0
0 20.4 l
- 16. Gross Thermal Energy Generated (MWH) 1322794.0 7386876.0 145481316.0
- 17. Gross Electrical Energy Generated (MWH) 438954.0 2460438.0 48092219.0
- 18. Net Electrical Energy Generated (MWH).
425628.0 2384631.0 46579390.0
- 19. Unit Service Factor 100.0%
65.24 es.75
- 20. Unit Availability Factor 100.0%
64.3%
66.5%
i
- 21. Unit Capacity Factor (Using MDC Net) 96.9%
59.4%
57.9%
l
- 22. Unit Capacity Factor (Using DER Net) 95.3%
58.5%
57.0%
- 23. Unit Forced Outage Rate 0.0%
0.0%
16,7%
l
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Dete.and Duration of Eacht:
i l
l
- 21. If Shut Down At End Of Report Pened. Estimated Date of Startup:
i
- 26. Units in Test Status IPrior to Cominercial Operationi:
Forecast Achieved 1
INITIAL CRITICALITY INITIAL ELECTRICITY k
COMMERCIAL OPERATION (u/771 l
4mi n
t*
AVER 4GE DAILY UNIT POWER LEVEL
~
DOCK'ET NO.
UNIT Nine Mile Pt. #1 DATE 10/1/Ra oman CO\\1PLETED BY f
TELEPflONE 315) 349-2422 September 1984 MONTH DAY AVERAGE DAILY POWER LEVEL, DAY AVERAGE DAILY POWER LEVEL (31We Net)
- (AfWe-Net) 584 595 17 LA 2
588 18 598 O
\\
3
- 587 598
,a 19
-1 4
598 597 20 5
585 597
.~
c) 6 590 596 7
592 33 597.
O 3
591 2.s 597 9
594 25 597,
to 590 26 595 I
II 589 597 12 589 596 13 590 29 597 14 588 596 30 15 546 31 16 600 INSTRUCTIONS l
i. ff;,""'s':,,';";"l,';" d""" ""*""" '" ""~"< <=cn <=> '" ine i- "." ">n. c.. #n ie ie l
Y (9U71 e
e l
ll.
, -,, -, - - - - - - ~ - -, -
--v
50-220 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME Nine Mile Pt #1 DATE 10/3/84
[/
l REFORT MONTH September 1984 COMPLETED BY T.W. Roman p//
~
TELEPHONE' L31blo43-2422 "E
e ei
.3:
g E
E y s "A Lkensee
[*.
k4 Cause & Cuesective e
1).ite
{
gg g
,ggE Event uT T
Action to
$E E
j di j Repos
- N0
[0 Psevesu Recurrence S
8413 840914
'S 16.5 11 1
Load Reduction 'to 66.3% CTP for
' Control Rod Sequence Exchange i
1 I
I 2
3 4
F: Forced Reason:
Method:
Exhibit C-lastructions r
l, S: Scheduled A Equipnwns Failure (Emplain) 1-Manus) for Prepasatiosiof Data B. Maintenance of Test 2 Manual Scrain.
Entry Sheets for Lkensee C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Reserktion 4 Other (Explain) 0161) li Operator Teaining & IJcense Examination j
F Administrative 5
G Opera ional Earor (Emplaini Exhibit 1 Same Source 19/77)
Il Othes (Explain)
.~
ses.saias.s.,uen GIIAGES-LNITS #O ALMILIARIES MONTig Sept.
,g g 1984 msT I
raarnatty AvalLA8LE scouas E7as
'Yah, as Asens / asrases
(
me-rauewur oAY am T uaf '
imava st aatt 1
Rx.
9/14/84 2200 16.S 66.3 Load Reduction for control rod sequence exchange
- Norm. shutdown-0
- Rx. Scrans 0
8 Ifrs. Crit.
720 4
l i
i
- i i
l l
t 1
i LogI L60TO
%e l
_w I
%g
'fo NIAGARA MOHAWK POWER CORPORATION NIAGARA MOHAWK 300 ERIE SOULEVARD. WEST e
SYRACUSL N. Y.13202 October 9, 1984
. Director Office of Inspection and Enforcement U.S. NacLear Regulatory Commission Washington, DC 20555 Attn:
Document and Controi Desk N
Re: Docket No. 50-220
=
DPR-63 to H.
Dear Sk:
Submitted here&h is.the Report of Operating S.txtistics y
and Shutdown for September 1984 for the Nine Mile Point Nacitar Station Unit "1.
O
^
Also included is a narrative report of Operating Experience O
for September 1984 Very truly yours, j
Thomas E. Lcmpges Vice President TEllio NacLear Generation attachments cc: Director, Office of ISE (10 copies) d
(