Responds to NRC Re Violations Noted in Insp Rept 50-395/84-23.Corrective Actions:Locking Device Installed on Naoh Tank Sample Isolation Valve XVT-3016 & Locked Valve Control Program Reviewed by Chemistry Personnel
ML20107M122
Person / Time
Site: Summer 
Issue date: 09/25/1984
From: Dixon O
SOUTH CAROLINA ELECTRIC & GAS CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20107M106 List:
References
NUDOCS 8411140034
Download: ML20107M122 (3)


Text

-.

G SOUTH CAROLINA ELECTRIC & GAS COMPANY POST OFFICE 764 cowueia. sovtw canousa asais 84 0CT 5 P3: 06 O. W. OsmoN. Jn.

we$*/J"o',*7'",0.

September 25, 1984 Mr. James P. O' Reilly Regional Administrator U.S. Nuclear Regulatory Commission Region II, Suite 2900 101 Marietta Street, N.W.

N Atlanta, Georgia 30323

SUBJECT:

Virgil-C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Response to Notice of Violation NRC Inspection Report 84-23 i

Dear Mr. O' Reilly:

4 Attached is South Carolina Electric and Gas Company's response for the Violation as addressed in Enclosure 1 of NRC Inspection Report 84-23.

If there ara any questions, please call us at your convenience.

ry tru

ours, 1)&n A ~

hon, Jr.

C CJM:OWD/lcd Attachment cc:

V. C.

Summer C.

L. Ligon (NSRC)

T.

C. Nichols, Jr./O. W.

Dixon, Jr.

K.

E. Nodland E.

H. Crews, Jr.

R. A.

Stough E. C. Roberts G.

Percival W. A. Williams, Jr.

C.

W. Hehl D. A.

Nauman J.

B.

Knotts, Jr.

Group Managers I & E (Washington)

O.

S. Bradham NPCF C. A. Price File D. A. Lavigne 8411140034 841012 PDR ADOCK 05000395 G

PDR

47

V ' Lc
  • ~

ENCLOSURE 1.

RESPONSE TO ~ NOTICE OF ~ VIOLATION

-INSPECTION ~ REPORT 84,

I.

A_DMISSION OR' DENIAL'OF'THE ALLEGED VIOLATION.

South' Carolina Electric and-Gas' Company'is in~ agreement-with the alleged violation.

II.

REASON FOR'THE VIOLATION XVT-3016; is a one -(l) inch sample: isolation valve located on the Sodium Hydroxide 1(NAOH) Storage Tank.

The valve is not required to be locked for any plant. safety concerns; however, due to the corrosive characteristics of NAOH,-administrative controls were established on'.the valve position in Special Instruction ~(SI) 84-0 5, " Locked. Valve Control."

An investigation performed subsequent to the identification of the violation by the inu: Resident Inspector failed to determine exactly:when the locking device was removed.

However, the Licensee believes the noncompliance with SI 84-05 most likely occurred when a chemistry sample was obtained on April 13, 1984.. The violation is attributed to personnel error caused by a lack of coordination between Operations and Chemistry personnel.

III.

CORRECTIVE STEPS TAKEN AND RESULTS ACHIEVED A locking device was immediately installed on Sodium Hydroxide Tank Sample Isolation valve XVT-3016 af ter identification of the' noncompliance by the NRC Resident Inspector.

The installation of the locking device on July 6, 1984, reestablished administrative control of valve position.

e IV.

CORRECTIVE ACTION TAKEN TO AVOID FURTHER VIOLATION The following actions were taken to prevent further violation:

A.

Chemistry personnel were required to review the Locked' l

Valve Control program as identified in SI 84-05.

This j

review was completed on July. 20, 1984.

L i

l

~

e m w n ne- +,e-.,n.e~,e

<w<,

--+--+"wa-e.

F IV.

CORRECTIVE ACTION TAKEN TO AVOID FURTHER VIOLATION ( cont' d )

B.

On July 20, 1984, the Director, Nuclear Plant Operations tasked all departments at the Virgil C.

Summer Nuclear Station to emphasize the.importance of the Locked Valve Control program to their respec'.ive employees.

This action was completed on Septemoer 14,-1984.

V.

DATE OF FULL COMPLIANCE South Carolina Electric'and' Gas Company was in full compliance on September 14, 1984.

l i - -. -.. -

.