.A FLORIDA POWER & LIGHT COMPANY February 15, 1984 L-85-76 l
' Dr.' J. Nelson Grace Regional Administrator, Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, N.W., Suite 2900 Atlanta, GA 30323 Dear Dr. Grace Re:
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 IE Bulletin 83-06 Our letter, L-84-259, dated September 28, 1984 described actions FPL was
. taking to determine if Gulfalloy Inc. had supplied FPL with Tube-Line material s.
One of the actions discussed was a review of documentation associated with Gulfalloy Purchase Orders. We have now completed our review of all available Gulfalloy documentation and a report of the findings of this review is attached.
A report on the material provided with Purchase Order 38497-24503C will be provided following the upcoming Unit 3 refueling outage as discussed in our letter L-84-377 dated December 17, 1984. We expect that this report will close out FPL actions on Bulletin 83-06.
Should you have any questions on this infonnation, please contact us.
Very truly yours, b
J. W. Williams, Jr.
Group Vice President Nuclear Energy
~JWW/PLP/cas Attachment
.cc:'
Harold F. Reis, Esquire PNS-LI-85-68/1 8503010138 850215
?"
^
DR fff/ t t PEOPLE.. SERVING PEOPLE
.. _ -....,.. -..,. -. ~. _. -.. -. -
- e c
Attachment Turkey Point Units 3 & 4 Docket No. 50-250, 50-251 I & E Bulletin 83-06 FPL has completed review of all documentation available for materials supplied by Gulfalloy, Houston, Texas.
Based on our review and current actions in L
progress, the following status encompasses all Tube Line Materials received at the Turkey Point Plant.
Line RCR No.
FPL P0/DWA Items Status q.
093-84 38497-39056C 7
Note 1 DWA 38624B 25 Note 2 38625 7
Note 1 39541 11 Note 1 16 Note 2 17 Note 1 18 Note 3 495-84 38497-24503C 12 A sample of each heat 13 has been sent for chemical /
14 physical testing.
572-84 38497-39056C DWA 34626 10 Note 2 l
NOTE 1: A sample from stock was taken for each heat installed; i
engineering evaluation of chemical and physical testing results demonstrates the material as acceptable.
NOTE 2: All materials received are on-hand and downgraded for use only in non-safety related applications.
NOTE 3: All items installed were removed during initial installation; balance on-hand downgraded for use only in non-safety related applications.