ML20107J949
| ML20107J949 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 09/25/1984 |
| From: | Felton J NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Varricchio M GOVERNMENT ACCOUNTABILITY PROJECT |
| Shared Package | |
| ML20107J952 | List: |
| References | |
| FOIA-84-671 NUDOCS 8502280093 | |
| Download: ML20107J949 (2) | |
Text
f D(L - 0)b
.[se. m'o,,
UNITED STATES NUCLEAR REGULATORY COMMISSION o
L E
W ASHINGTON, D. C. 20555
\\..../
SEP 2 51334 Ms. Marsha Varricchio Government Accountability Project 1901 Que Street, NW IN RESPONSE REFER Washington, DC 20009 TO F01A-84-671
Dear Ms. Varricchio:
This is in partial response to Mr. John Clewett's letter dated August 7, 1984, in which he requested, pursuant to the Freedom of Information Act, copies of all agency records relevent to and/or generated in connection with either of the following:
1.
An incident at the Callaway nuclear plant, occurring on or about July 4,1984, in which eight circuit breakers were switched off, cutting power to certain plant equipment; and 2.
An incident at the Callaway nuclear plant, occurring on or about June 2 and 3, 1984, in which a large amount of water was spilled onto the floor of the reactor building.
In partial response to Mr. Clewett's request, copies of the documents listed on Appendix A are being placed in the NRC Public Document Room (PDR) 1717 H Street, NW, Washington, DC, where they will be available for public inspection and copying.
Some additional documents are undergoing review and we will communicate with you again concerning them.
Since ely,
/
. M. Felton, Director Division of Rules and Records Office of Administration
Enclosure:
As stated l38409g5 4-671 PDR
Re:
F01A-84-671 APPENDIX A 1.
6/5/84 Daily Report RIII - Callaway - Telecon from SRI on 6/4/84 (1 page) 2.
7/4/84 Report to Operations Center re: 10 CFR 50.72 Reportable Event, Non Emergency Loss of Power (1 page) 3.
7/4/84 Partial Chronology in Draft (1 page) 4.
7/4/84 Event Notification Form (1 page) 5.
7/4/84 Reportable Event Log (1 page) 6.
7/6/84 Daily Report RIII - Callaway - Telecon from HQ Duty Officer on 7/4/84 (1 page) 7.
7/6/8,4 Confirmatory Action Letter from Keppler to Schnell regarding reportable event on July 4 (1 page) 8.
7/6/84 Memo from Davis to Rehm about the Callaway incident discussed on July 6,1984 (2 pages) 9.
7/6/84 Letter from Keppler to Schnell regarding the reportable event on July 4, 1984 (1 page) 10.
7/9/84 Internal Licensee Document on Acts of Vandalism (1 page) 11.
7/12/84 Memo from Davis to Rehm regarding the Callaway incident draft document (3 pages) 12.
7/26/84 Letter from Warnick to Schnell transmitting Inspection Report No. 50-483/84-21 (DRP) (13 pages) l'3.
8/7/84 Partial listing of LER (1 page)
- 14. 8/9/84 Letter from Schnell to Keppler, Unauthorized Operation of Plant Equipment (3 pages) 15.
8/9/84 Letter from Schnell to Keppler, Analysis of Licensee Event Report (4 pages)
.