F o
ENCLOSURE 2 850225054'1 850214 PDR ADOCK 05000330 P
I~
D e
S TECHNICAL SPECIFICATION CHANGES NORTH ANNA UNIT 1 l
l l
l l
l i
I l
I t
i l
i.
i.
r O
POWER DISTRIBUTION LIMITS NUCLEAR ENTHALPY HOT CHANNEL FACTOR - F H LIMITING CONDITION FOR OPERATION 3.2.3 F
shall be limited by the following relationship-AH F
s1.55 [1 + 0.3 (1-P)]
H THERMAL POWER where: P= RATED THERMAL POWER APE LICABILITY: MODE 1.
ACTION _:
With F exceeding its limit:
AH
- a. Reduce THERMAL POWER to less than 50% of RATED THERMAL POWER within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and reduce the Power Range Neutron Flux-High Trip Setpoints s 55% of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />,
- b. Demonstrate through in-core mapping that is witMn its limit H
within 24' hours after exceeding thc' limit or reduce THERMAL POWER to less than 5% of RATED THERMAL POWER within the next 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, and
- c. Identify and correct the cause of the out of limit condition prior to increasing THERMAL POWER above the reduced limit required by a o
b, above; subsequent POWER OPERATION may proceed provided that is demonstrated through in-core mapping to be within its limit AH at a nominal 50% of RATED THERMAL POWER prior to exceeding this THERMAL POWER, at a nominal 75% of RATED THERMAL POWER prior to exceeding this THERMAL POWER and within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after attaining 95%
or greater RATED THERMAL POWER.
NORTH ANNA - UNIT 1 3/4 2-9
n
+
o.LL,,,,6 sat. = -
-o~
-As - ~
- ~~s
-4~+-e-u4-n-
- -a-oa--~2 n---
~-
a s-a.
-n=s-s+a k a a.
s---*+
-a1 m-+-
161
.r-
- s s s -- J
=
x 4-
=c--
9
'i f
s 4
A 4
't i -
f s
l' t
s e
d i '
t Y
h a
i t.
4 i -
d' l -'
i f '
t.
i i
h' J
THIS PAGE WAS INTENTIONALLY LEFT BLANK N
e I
t;
} '
i' f-i L
4 1
1-t I ~
0 3
NORTH ANNA - UNIT 1 -
3/4 2-11 w
w L.
I
,o e
TECHNICAL SPECIFICATION CHANGES NORTH ANNA UNIT 2 D
,w
POWER DISTRIBUTION LIMIT _S NUCLEAR ENTHALPY HOT CHANNEL FACTOR - F H LIMITING CONDITION FOR OPERATION 3.2.3
?
shall be limited by the following relationship:
H s1.55 [1 + 0.3 (1-P)]
H THERMAL POWER l
where: P= RATED THERMAL POWER APPLICABILITY: MODE 1.
ACTION:
With F exceeding its limit:
H
- a. Reduce THERMAL POWER to less than 50% of RATED THERMAL POWER within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and reduce the Power Range Neutron Flux-High Trip Setpoints to less than or equal to 55% of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />,
- b. Demonstrate through in-core mapping that F is within its limit H
within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after exceeding the limit or reduce THERMAL POWER to less than 5% of RATED THERMAL POWER within the next 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, and
- c. Identify and correct the cause of the out of limit condition prior to increasing THERMAL POWER above the reduced limit required by a o
b, above; subsequent POWER OPERATION may proceed provided that is dem nstrated through in-core mapping to be within its limit AH at a nominal 50% of RATED THERMAL POWER prior to exceeding this THERMAL POWER, at a nominal.75% of RATED THERMAL POWER prior to NORTH ANNA - UNIT 2 3/4 2-9 L
r.
t
~
i THIS PAGE WAS INTENTIONALLY LEFT BLANK l
l l
NORTH ANNA'- UNIT 2 3/4 2-11