>S Rf 3 o
UNITED STATES g
.[
g NUCLEAR REGULATORY COMMISSION g
- p WASHINGTON, D. C. 20555
%...../
VIRGINIA ELECTRIC AND POWER COMPANY
'OLD DOMINION ELECTRIC COOPERATIVE DOCKET NO. 50-338 NORTH ANNA POWER STATION, UNIT N0. 1 I
AfiENDMENT TO FACILITY OPERATING LICENSE Amendment No. 62 License No. NPF-4 1.
The Nuclear Regulatory Comission (the Comission) has found that:
+
i A.
The application for amendment by Virginia Electric and Power Company, j
et al., (the licensee) dated December 15, 1983 and August 1, 1984 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, 4
the provisions of the Act, and the rules and regulations of the Comission;
~
C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; 1
'D.
The issuance of this amendment will not be inimical to the common-defense and security or_to the health and safety of the public; and
~
E.
The issuance of this amendment is in accordance with -10 'CFR Par' t 51-of the.Comission's regulations and all ~ applicable requirements have been satisfied.
l P R**!88H 88888 6 "
__ P..
PDR_
- j c,
. 2.
Accordingly, the 1.icense is amended by changes to the Technical Spect-fications as indicated in the attachment to this license amendment, and paragraph 2.D.(2) of Facility Operating License No. NPF-4 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 62, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMilSSION i
7
' James R. Miller,, Chief
/
Operating Reactors Branch #3-Division of Licensing
Attachment:
Changes to the-Technical Specifications Date of1 Issuance: February 1,1985
'f' h
w
=
k I
e 1
ATTACHMENT TO LICENSE AMENDMENT NO. 62 TO FACILITY OPERATING LICENSE NO. NPF-4 DOCKET NO. 50-338 Replace the following pages of the Appendix "A" Technical Specifications
?
with the enclosed pages as indicated. The revised pages are identified by amemdment number and contain vertical lines indicating the area of change.
The corresponding overleaf pages are provided to maintain document continuity.
Page i
3/4'0-1 B 3/4 0-1.
4 N
l f~
T i
V:,
3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.0 APPLICABILITY LIMITING CONDITION FOR OPERATION 1
3.0.1 Limiting Conditions for Operation and ACTION requirements shall be applicable during the OPERATIONAL MODES or other conditions specified for each Specification.
3.0.2 Adherence to the requirements of the Limiting Condition for Operation L
and/or associated ACTION within the specified time interval shall constitute compliance with the Specification.
In the event the Limiting Condition for Operation is restored prior to expiration of the specified time interval, completion of the ACTION statement is not required.
3.0.3 When a Limiting Condition for Operation is not met, except as provided in the associated ACTION requirements, within one hour ACTION shall be initiated to place the unit in a MODE in which the Specifica-tion does not apply by placing it, as applicable, in:
1.
At least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, 2.
At least HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and 3.
At least COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
~
Where corrective measures are completed that permit operation under the ACTION requirements, the ACTION may be taken in accordance with the specified time limits as measured from the time of failure to meet the Limiting Condition for Operation.
Exceptions to these requirements are stated in the individual Specifications.
This specification is not applicable in MODES 5 or 6.
3.0.4 Entry into an OPERATIONAL MODE or other specified applicability condi-tion shall not be made unless the conditions of the Limiting Condition for Operation are met without reliance on provisions contained in the ACTION state-l ments unless otherwise excepted. This provision shall not prevent passage through OPERATIONAL MODES as required to comply with ACTION statements.
L 3.0.5 When a system, subsystem, train, component or device is determined to be l
inoperable solely because its emergency power source is inoperable, or solely because its normal power source is inoperable, it may be. considered OPERABLE-for the purpose of satisfying the requirements of its applicable Limiting Condi--
tion for Operation, provided:
(1) its corresponding normal or emergency power source is OPERABLE: and (2) all of its redundant system (s), subsystem (s),
train (s), component (s) and device (s) are OPERABLE, or likewise satisfy)the requirements of this Specification. Unless both conditions (1) and (2 are satisfied, the unit shall be placed.in at least HOT STANDBY within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, in-at least HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in at least COLD SHUTDOWN-within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
This Specification is not applicable in MODES h
5 or 6.
l-NORTH ANNA - UNIT 1 3/4 0-1 Amendment No.-19, #8, 62 i
i l
_=.
i APPLICABILITY i
. SURVEILLANCE REQUIREMENTS (Continued) h 4.0.1 Surveillance Requirements shall be applicable during the OPERATIONAL l
MODES or other conditions specified for individual Limiting Conditions for Operation unless otherwise stated in an individual Surveillance Requirement.
4.0.2 Each Surveillance Requirement shall be performed within the specified time interval with:
s a.
A maximum allowable extension not to exceed 25% of the surveillance interval, and b.
A total maximum combined interval time for any 3 consecutive surveillance intervals not to exceed 3.25 times the specified surveillance interval.
4.0.3 Performance of a Surveillance Requirement within the specified time interval shall constitute compliance with OPERABILITY requirements for a limitinc Condition for Operation and Associated ACTION statements unless otherwise required by the specification. Surveillance Requirements do not have to be performej on inoperable equipment.
4.0.4 Entry into an OPERATIONAL MODE or other specified applicability condition
'shall not be made unless the Surveillance Requirement (s)' associated with the Limiting Condition for Operation have been performed within the stated surveillance interval or as otherwise specified.
4.0.5 Surveillance Requirements for inservice inspection and testing of ASME Co'de Class 1, 2, and 3 components shall be applicable as follows:
a._
Inservice inspection of ASME Code Class 1, 2, and 3 components and inservice testing of ASME Code Class 1, 2.,and 3 pumps and valves.
shall be performed in accordance with Section' XI of the ASME Boiler-j and Pressure Vessel Code and applicable Addenda as required by-10 CFR 50, Section 50.55a(g),'except where specific written relief has been granted by -the Commission pursuant-to 10 CFR 50. Section.
50.55a(g)(6)(i).
)
NORTH ANNA - UNIT 1 3/4L0-2 Amendment Mo' I9-b-
i s
3/4.0 APPLICABILITY BASES The specifications of this section provide the general requirements applicable to each of.the Limiting Conditions for Operation and Surveillance Requirements within Section 3/4.
3.0.1 This specification defines the applicability of each specifica-tion in terms of defined OPERATIONAL MODES or other specified conditions and is provided to delineate specifically when each specification is applicable.
3.0.2 This specification defines those conditions necessary to constitute compliance with the terms of an individual Limiting Condition,for Operation and associated ACTION requirement.
3.0.3 This specification delineates the ACTION to be taken for circum-stances not directly provided for in the ACTION statements and whose occurrence would violate the intent of the specification.
For example, Specification 3.5.1 calls for each Reactor Coolant System accumulator to be OPERABLE and provides explicit ACTION requirements when one accumulator is inoperable.
Under the terms of Specification 3.0.3, if-more than one accumulator is inoper-able, within one hour measures must'be initiated to place the unit in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at-least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. As a further example, Specification 3.6.2.1 requires two Containment Quench Spray Systems to be OPERABLE and provides explicit ACTION requirements if one spray system is inoperable.
Under the terms of Specification 3.0.3, if both ~of the required Containment Quench Spray Systems are inoperable, within one hour measures must be initiated to place the unit in at least HOT STANDBY dithin 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, in at least HOT-SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least COLD SHUTDOWN in the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
3.0.4 This specification provides that entry into an OPERATIONAL MODE or-other specified applicability condition must be made with (a) the full comple-ment of required systems, equipment or components OPERABLE and (b) all other parameters as specified in the Limiting conditions for Operation being met without regard for allowable deviations and out of service provisions contained in the ACTION statements.
The intent of this provision is to insure that facility operation is not--
initiated with either required equipment or. systems inoperable or other-specified limits being exceeded.
Exceptions-to this provision have been provided fo'r a limited number of-specifications when startup with inoperable equipment would not affect plant safety. _ These exceptions are stated in the ACTION statements of the appropriate.
specifications.
NORTH ANNA - UNIT 1 B 3/4 0-1
~ Amendment No. A
- 62' 4
ADPLICABILITY BASES i
\\
3.0.5 This specification delineates what additional conditions must be satisfied to permit operation to continue, consistent with the ACTION statements for power sources, when a normal or emeroency power i
source is not OPERABLE. -It specifically prohibits operation when one j
division is inoperable because its normal or emergency power source is I
inocerable and a system, subsystem, train, component or device in another division is inoperable for another reason.
The provisions of this specification permit the ACTION statements associated with individual systems, subsystems, trains, components, or devices to be consistent with the ACTION statements of the associated electrical power source.
It allows operation to be coverned by the time limits of the ACTION statement associated with the Limiting Condition for Operation for the normal or emergency power source, not the individual ACTION statements for each system, subsystem,- train, comoonent or device that is determined to be inoperable solely because of the inoperability of its normal or emeroency power source.
For example, Specification 3.8.1.1 requires in part that two emergency diesel generators be OPERABLE. The ACTION statement provides for a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> out-of-service time when one emeroency. diesel generator is not OPERABLE.
If the definition of OPERABLE were applied without consideration of Specification 3.0.5, all systems, subsystems, trains, comoonents and devices supplied by the inoperable emergency oower source would also be inoperable. This would dictate invoking the applicable ACTION statements for each of the applicable Limiting Conditions for Operation. However, the provisions of Specification 3.0.5 permit the-time limits for continued operation to be consistent with the ACTION statement for the inoperable emergency diesel oenerator instead, pro-vided the other specified conditions are satisfied.
In this case,.
this would mean that the correspondina normal power source must be-OPERABLE, and all redundant. systems, subsystems, trains, components, and devices must be OPERABLE, or otherwise satisfy Specification 3.0.5 (i.e., be capable of performing their design function and have at least one normal or one emeroency power source OPERABLE). -If they are not satisfied,. shutdown is required in accordance with this specification.
IAs a further example, Specification '3.8.1.1 requires-in part that i
two physically independent circuits between the offsite transmisson
. network and the onsite Class IE distribution system be OPERARLE.i The.
ACTION' statement provides a 24-hour out-of-service time when bo h t
1 renuired.offsite circuits are not OPERABLE.
If the definition of' OPERABLE were applied without consideration of Specification 3.0.5.
all systems, subsystems, trains, components.and devices supplied.by the inoperable ~nomal power sources, both of the offsite circuits, would also be inoperable.
This would dictate invokine the applicable NORTH ANNA --UNIT 1 B 3/4 0.-2.
Amendment No.19:
t
o UNITED STATES g
[
g NUCLEAR REGULATORY COMMISSION g
-E WASHINGTON, D. C. 20555
/
VIRGINIA ELECTRIC AND POWER COMPANY OLD DOMINION ELECTRIC COOPERATIVE DOCKET NO. 50-339
~
NORTH ANNA POWER STATION, UNIT NO. 2
)
AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. T46 License No. NPF-7 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Virginia Electric and Power Company, etal.,(thelicensee)datedDecember 15, 1983, and August 1, 1984 Act of 1954, as amended (the Act) quirements of the Atomic Energy complies with the standards and re and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in confomity with the application, the provisions of the Act, and the rules and regulations.of the Commission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii)'that such activities will be conducted in compliance with the Comission's regulations;
~
D.
The issuance of this amendment will not be 1nimical to the conson defense and security or to the health and safety of the public; and y
E5 The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
~
I I
e
[.
{
. 2.
Accordingly, the 1icense is amended by changes to the Technical Speci-fications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-7 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 46, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION f
.sn
. dames R. Miller, Chief
,/ Operating Reactors Branch #3 Division of Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance: February 1,1985 S
4 9
e L.
1 ATTACHMENT TO LICENSE AMENDMENT NO.46 i
TO FACILITY OPERATING LICENSE NO. NPF-7 DOCKET NO. 50-339 Replace the following pages of the Appendix "A" Technical Specifications with tiie enclosed pages as indicated. The revised pages are identified by amendment number and contain vertical lines indicating the area of change.
The corresponding overleaf pages are provided to maintain document continuity.
Page 3/4 0-1 B 3/4 0-1 1
4 m
4 4
0 6
,m___________..__.__._
3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.0 APPLICABILITY LIMITING CONDITION FOR OPERATION 3.0.1 Compliance with the Limiting Conditions for Operation contained in the succeeding specifications is required during the OPERATIONAL MODES or other conditions specified therein; except that upon failure to meet the Limiting Conditions for Operation, the associated ACTION requirements shall be met.
f 3.0.2 Noncompliance with a specification shall exist when the requirements of the Limiting Condition for Operation and associated ACTION requirements are i
not met within the specified time intervals.
If the Limiting Condition for l
Operation is restored prior to expiration of the specified time intervals.
completion of the ACTION requirements is not required..
i 3.0.3 When a Limiting Condition for Operation is not met, except as l
provided in the associated ACTION requirements, within one hour ACTION i
shall be initiated to place the unit in a MODE in which the Specification does not apply by placing it, as applicable, in:
j 1.
At least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, i
2.
At least HOT SHUIDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and j
3.
At least COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
l Where co'rrective measures are completed that permit operation under the ACTION requirements, the ACTION may be taken in accordance with the specified time l
limits as measured from the time of failure to meet the Limiting Condition for Operation.
Exceptions to these requirements are stated in the individual L
l specifications.
This specification is notiapplicable in MODES 5 or 6.-
l 3.0.4 Entry into an OPERATIONAL MODE or other specified condition shall not be l
made unless the conditions of the Limiting Condition for Operation are met I
without reliance on provisions contained in the ACTION requirements.
This
(
-provision shall not prevent passage through OPERATIONAL MODES as required to-comply with ACTION requirements.
Exceptions to these requirements are stated in the individual specifications.
3.0.5 When a system, subsystem, train, component or device is detemined to be '
l inoperable solely because its emergency power source is inoperable. or solely-because its normal power source is inoperable. it may be considered OPERA 8LE for the purpose of satisfying the requirements of its app'licable Limiting Condition for Operation, provided:
(1) its corresponding normal or emergenc power source is OPERABLE; and (2) all of its redundant system (s). subsystem (ys),
train (s), component (s),'and~ device (s)areOPERABLE,orlikewisesatisfythe requirements of this specification. Unless both conditions (1) and (2) are satisfied, the unit shall be placed in at least HOT' STAND 8Y within'1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, in
' at least HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in at least COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. This specification'is not applicable in MODES 5 or 6.
NORTH ANNA - UNIT 2 3/4 0-1 Amendment No.46
SURVEILLANCE REQUIREMENTS 4.0.1 Surveillance Requirements shall be met during the OPERATIONAL MODES or other conditions specified for individual Limiting Conditions for Operation unless otherwise stated in an individual. Surveillance Requirement.
4.0.2 Each Surveillance Requirement shall be performed within the specified time interval with:
a.
A maximum allowable extension not to exceed 25% of the surveillance j
interval, but b.
The combined time interval time for any 3 consecutive surveillance intervals shall not exceed 3.25 times the specified surveillance interval.
4.0.3 Failure to perform a Surveillance Requirement within the specified time interval shall constitute a failure to meet the OPERABILITY. requirements for a Limiting Condition for Operation.
Exceptions to these requirements are stated in the individual specifications. Surveillance Requirements do not.have to be performed on inoperable equipment.
4.0.4 Entry into an OPERATIONAL MODE or other specified condition shall not be made unless the Surveillance Requirement (s) associated with the Limiting-Condition for Operation have been performed within the stated surveillan'ce interval or as otherwise specified.
4.0.5 Surveillance Requirements for inservice inspection and testing of ASME Code Class 1, 2 and 3 components shall be applicable as follows:
i a.
Inservice inspection of ASME Code Class 1, 2, and 3 components and inservice testing of ASME Code Class 1, 2, and 3 pumps and valves shall be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR 50, Section 50.55a(g),2exceptnWhere specific writter.' relief has been granted by)the Commission pursuant to 10 CFR 50, Section50.55a(g)(6(i).
9 4
4 NORTH ANNA - UNIT 2 3/4 0-2 L
~
3/4.0 APPLICABILITY BASES The specifications of this section provide the general requirements appli-cable to each.of the Limiting Conditions for Operation and Surveillance Require-ments within Section 3/4.
3.0.1 This specification defines the applicability of each specification in terms of defined OPERATIONAL MODES or other specified conditions and is provided to delineate specifically when each specification is applicable.
3.0.2 This specification defines those conditions necessary to constitute i
compliance with the terms of an individual Limiting Condition for Operation h-and associated ACTION requirement.
3.0.3 This specification delineates the ACTION to be taken for circumstances not directly provided for in the ACTION statements and whose occurrence would l
violate the intent of the specification.
For example, Specification 3.5.1 requires each Reactor Coolant System accumulator to be OPERABLE and provides explicit ACTION requirements if one accumulator is inoperable. Under the terms of Specification 3.0.3, if more than one accumulator is inoperable, the unit is required to be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT
.I SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. As a further example, Specification 3.6.2.1 requires two Quench Spray Systems to be OPERABLE and provides explicit' j
ACTION requirements if one spray system is inoperable. Under the-terms of-Specification 3.0.3, if both of the required Quench Spray Systems are inoperable, within one hour measures must be initiated to place the unit in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in at least COLD SHUTDOWN in the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
3.0.4 This specification provides that entry into an OPERATIONAL MODE or other specified applicability condition must.be made with.(a) the full comple-I ment of required systems, equipment or components OPERABLE and (b) all other
. parameters as specified in the Limiting Conditions for Operation being met.
without regard for allowable deviations and out-of-service provisions contained in the ACTION statements.
)
The intent of this provision is to insure that facility operation is not i
initiated with either required equipment or systems inoperable or other speci-fied limits being exceeded.
l i
i i
L
' NORTH ANNA - UNIT 2 B'3/4 0-1 Amendment No.: 46 u
0
)
f
APPLICABILITY BASES 3.0.5 This specification delineates what additional conditions must be satisfied to permit operation to continue, consistent with the ACTION state-ments for power sources, when a normal or emergency power source is not OPERABLE.
It specifically prohibits operation when one division is inoperable because its normal or emergency power source is inoperable and a system, subsystem, train, componer.t or device in another division is inoperable for another reason.
The provisions of this specification permit the ACTION statements associated with individual systems, subsystemt, trains, components, or devices to be consistent with the ACTION statements of the associated electrical power source.
It allows operation to be governed by the time limits of the ACTION statement associated with the Limiting Condition for Operation for the normal or emergency power source, not the individual ACTION statements for each system, subsystem, train, component or device that is determined to be inoper-able solely because of the inoperability of its normal or emergency power source.
For example, Specification 3.8.1.1 requires in part that two emergency diesel generators be OPERABLE. The ACTION statement provides for a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> out-of-service time when on emergency diesel generator.is not OPERABLE.
If the-definition of OPERABLE were applied without consideration of Specification 3.0.5, all systems, subsystems, trains, components and devices supplied by the inoperable emergency power source would also be inoperable. This would dictate invoking the applicable ACTION statements for each of the applicable Limiting Conditions for Operation. However, the provisions of Specification 3.0.5 permit the time limits for continued operation to be consistent with the ACTION statement for the inoperable emergency diesel generator instead, provided the other specified conditions are satisfied.
In this case, this would mean that the corresponding normal power source must be OPERA 8LE, and all redundant systems, subsystems, trains, components, and devices aust be OPERABLE, or otherwise satisfy Specification 3.0.5 (i.e., be capable of.
performing their design function and have at least one nomal,or one emergency power source OPERABLE).
If they are not satisfied, shutdown is required ~1n accordance with this specification.
As a further example, Specification 3.8.1.1 requires in part that two physically independent circuits between the offsite transmission network and '
the onsite Class 1E distribution system be OPERA 8LE. The ACTION statement provides a 24-hour out-of-service time when both required offsite circuits are r
not OPERABLE.
If the definition of OPERABLE were applied without consideration of Specification 3.0.5, all systems, subsystems, trains, components:and devices supplied by the inoperable normal power sources, both of the offsite circuits, would also be inoperable. This would dictate invoking the applicable ACTION statements for.each of,the applicable LCOs.
However, the. provisions of-Specification 3.0.5 permit the time limits for continued operation to be t
NORTH' ANNA - UNIT 2 B 3/4 0-2 u