OPERATING DATA REPORT DOCKET NO. 50-220 DATE 1/9/nm COMPLETED BY TW Roman i TELEPHONE (315)349-24 2-OPERATING STATUS I. Unit Name:
Nine Mile Point Unit 51 Notes
- 2. Reporting Period: January 1985 1/1/85 - 1/31/85
- 3. I 6-1 Thermal Power (MWt):
1850
- 4. Namepiste Rating (Grom MWe):
640
- 5. Design Electrical Rating (Net MWe):
630
- 6. Maximum Dependable Capacity (Gross MWe): 620 610
- 7. Maxur.um Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7)Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted,if Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
This Month Yr to.Date Cumulative iI. Hours in Reporting Period 744 744 134809.2
- 12. Number Of Hours Reactor Was Critical 744 744 93459.7
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 1204.2
- 14. Hours Generator On.Line 744 744 90549.3
- 15. Unit Reserve Shutdown Hours 0
0 20.4
- 16. Grom Thermal Energy Generated (MWH) 1371575.0 1371575.0 150661025.0
- 17. Gross Electrical Fnergy Generated (MWH) 467796.0 _,
467796.0 49848584.0
- 18. Net Electrical Energy Generated (MWH)-
453361.0 453361.0 48283355.0
- 19. Unit Service Factor 100 100 67.2
- 20. Unit Availability Factor 100 100 67.2 i
- 21. Unit Capacity Factor (Using MDC Net) 49 9 99.9 58.7
- 22. Unit Capacity Factor (Using DER Net) 98.3 98.3 57.8
- 23. Unit Forced Outage Rate 0.0 0.0 16.3
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each t:
4 4
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commeremi Operation):
Forrast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8502190073 850131 gDRADOCK 05000220 I
(4/771 PDR 3b f\\_
n.
n
..,s-
-.,.,, ~, - -..
AVER \\GE D ALLY UNIT POhER LEVEL
{
1 l
~
DOCK ET NO.
50-220 UNIT 9 Mile Pt. #1 DATE 2/5/85 m CO\\lPLETED Ilp Roman
.j i.
- TELEPilONE 21 a 1 'ao-?d?9
~
AIONTH January 1985 l
DAY AVERACE DAILY POWER LEVEL, DAY AVERAGE DAILY POWER LEVEL tMWe-Net)
(MWe-Neil I
cia g.
608 2
613 Is 608 3
h19 19 609 4
619 20 609 5
611 gg 609 6
613 3,
608 7
611 611
,3 8
612
-611 9
610 25 612 10 609
'6 610 11 609 613
.o 12 613 613 13 A1' 29 603
~
14 610 30 604 15 602' 3,
609 16 596 i
INSTRUCTIONS l
On this format.hst the aversge dady unit power lesel m MWe Net for each day in the re;mitmp the nearest whole megawatt.
0 (9 t;;i t
i '
i
- M**
-me n
,-m-
J UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
sn-9on UNIT NAME 9 Mile Pt. 11 y
-.4 DATE 2/5/85
/
/
REPORT MONTil January 1985 COMPLETED BY w n--
M4 TELEPHONE r11c11Ao,A94_7 -
"k
=
c.
i =
g Daie Q
j _e 8
g,s y Licensee E,
n.,
Cause & Corrective e?
N
.E 5 a:
Event uT T
Action to oH
$E 5
j in' g Repos: *
- E0
[0 Psevent Recurrence d
8501 1/29/85 F
1.5 11 Load reduction to 80% power to reverse cire wate' flow (intake r
tunnel icing) i i
2 3
4 F: Forced Reason:
Method:
Exhibit C-Instructions 5: Scheduled A Equipment Failure (Explain) 1-Manual i
for Pseparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C. Refueling
- 3. Automatic Scram. '
Event Report (LER) File (NUREG-D Regulaiory Restriction 4-Other (Explain) 0161)
E Operator Training & License Examination F Administrative '
5 G Operational Esroi IExplain)
Exhibit I - Same Source p8/77)
Il-Olhes (Explain) t f
1 i
O
I NIAGARA MORAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT #1 NARRATIVE OF OPERATING EXPERIENCE The station operated during the month of January 1985, with a Unit Availability Factor of 100.0% and a Net Design. Electrical Capacity Factor of 98.3%.
There were O challenges to Electromatic Relief Valves. Reductions in Capacity Factor were due to tunnel icing.
CLASS I WORK - MECHANICAL MAINTENANCE - JANUARY 1985 WR6 30893-39-HS-15, ECIV Room-298' snubber - refilled snubber WR9 30894 39-HS-8, ECIV Room-298' snubber - refilled snubber WR$ 24625 TBM-spare snubber S/N F84806 3/4 - rebuilt snubber WR9 24624 TBM-spare snubber S/N F84806 3/12 - rebuilt snubber WR4 24623 TBM-spare snubber S/N F84806.3/16 - rebuilt snubber WR$ 24622-TBM-spare snubber S/N F84806 3/21 - rebuilt snubber WR$ 30641 28-Rl-B pipe hanger, rod and nuts replaced WR9 30642-
~93-R20-A pipe hanger and rod removed to paint pipe WR$ 27394
-Cond. Domin #11 effluent strainer replaced basket WR$ 30643 CRD supply piping, removed supports delineated in engineering letter CLASS I WORK - INSTRUMENTATION & CONTROL - JANUARY 1985 WR$ -30890 CRD drive water pressure RD-10 transmitter leaking internally (replaced transmitter)
WR$ 30717 APRM Flux Amplifier #20-25A Input cable intermittent (repaired connector)
WR9 30774 fil H 0 m nitor stream C SOV-201.2-114 sticking 2
2 (replaced SOV)
WRf 30800 Offgas Radiation Monitors changed to new setpoints (adjusted per Chem / Rad. Protection Department)
CLASS I WORK - ELECTRICAL MAINTENANCE - JANUARY 1985 I
MO 1927 This major order involves updating station equipment for Equipment Qualification. The work performed in January j
includes replacing position limit switches, rewiring re-placement solenoids and transmitters. In addition, a new Limitorque valve operator was installed on a flow control valve in the Containment Spray System. Condulets were sealed with Bisco Seal on the solenoids and a temperature element for the Reactor Building Closed Loop Cooling. The I
systems involved are the Emergency Cooling condenser Make-up and Containment Spray.
R7 CLASS I WORK - ELECTRICAL MAINTENANCE - JANUARY 1985 WR8 '29715 Liquid poison pump 11 and 12, in response to INPO O + MR-201, jumper was replaced ~on GE type 195 meter relays.
WR6 30306 Reactor Containment cooling System, removed position limit switch on valve 201-16 for Equipment Qualification Inspection.
Limit switch remounted and operability check was satisfactorily.
WR6.30308' Reactor Containment Cooling System, obtained sample of main gear case grease from valve 201-17 for analysis.
I l
['
.*i'
- j NIAGARA MOHAWK POWER CORPORATION NIAGARA ~
MOHAWK 3co sm:s soutzvAno. wasr SYRACUSE. N. Y.13 202 February.8, 1985 Director office of Inspection and Enforcement US Nuclear Regulatory Commission Washington,'DC 20555 Attn:
Document and Control Desk Ret Docket No. 50-220
Dear Sir:
Submitted herewith is the Report of Operating Statistics and Shutdown for January 1985 for the Nine Mile Point Nuclear Station Unit #1.
Also included is a narrative report of Operating Experience for January 1985.
Very truly yours, t
MO
/
Thomas E. Lempges Vice President Nuclear Generation TEL/lo cc: Director, Office of I&E (10 copies) attachments f