Monthly Operating Repts for Feb 1996 for McGuire Nuclear Station Units 1 & 2
ML20106G953
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 02/29/1996
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20106G951 List:
References
NUDOCS 9603190375
Download: ML20106G953 (10)


Text

.

W OPERAT!N6 DATA REPORT DOCKET NO 50-369 DATE March 15. 1996 0 4 TIM STATUS C0fFLETED BY R.O Willines TELEPHOIE 704-382-5346

1. Unit Names McGuire 1
2. Reporting Period: February 1, 1996-February 29,1996
3. Licensed Thereal Peuer (MWt): 3411
4. Neeeplate Rating (Gross NWel 1305e Notes eNameplate Rating
5. Besign Electrical. Rating (Net MWe):  !!80 (6ross Mue) calculated as
6. Maxisue Dependable Capacity (6ross MWe): 1171 1450.000 NVA .90 power
7. Maxieue Dependable Capacity (Net MWe):  !!29 factor per Page 111,
8. If Changes occur in Capacity Ratings (! tees Number 3 Through 7) Since Last HUREG-0020.

Report. Give Reasons:

9. Power Level To Which Restricted, If Any (Net MWe):

10.ReasonForRestrictions,Ifany:

This Month Yr.-to-Date Cuaulative

!!. Hours In Reporting Period 696.0 1440.0 124896.0

12. Number Of Hours Reactor lias Critical 669.8 861.5 89300.8
13. Reactor Reserve Shutdown Hours --0-- -
14. Hours Senerator On-Line 638.7 769.8 88301.3
15. Unit Reserve Shutdown Hours --0-- - --0--
16. Gross Thereal Energy Generated (MWH) 2060351 2468869 277222971
17. Gross Electrical Energy 6enerated (MWH) 741663 849154 95224434
18. Net Electrical Energy Generated (MWH) 712770 806989 90974560
19. Unit Service Factor 91.8 53.5 70.7
20. Unit Availability Factor 91.8 53.5 70.7
21. Unit Capacity Factor (Using MDC Net) 90.7 49.6 63.5
22. Unit Capacity Factor (Using DER Net) 86.8 47.5 61.7
23. Unit Forced Outage Rate 8.2 6.9 13.5
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Eacht:

None

25. If Shut Down At End of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Consercial Operation): Forecast Achieved IN!ilAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERAi!ON 9603190375 960314 PDR ADOCK 05000369 ,

R PDR 4

r OPERATIN6 DATA REPORT l

DOCKET NO 50-369 UNIT McGuire 1 l DATE March 15. 1996 COMPLETED BY R.A. Williams TELEPHONE 704-382-5346 I

i l MONTH February.1996 i

l-1 DE AVERAGE DAILY POWER LEVEL pg AVERAGE DAILY POWER LEVEL (nWe-ht)- (nue-ht) 1 1142 17 1144 2 1144 18 1144 1

4 0 20 1145 5 584 21 1145 6 1137 22 1145 ,

1 7 1140 23 1145 8  !!42 24 1145 9 1142 25 1145 10 21B 26 1145 11 825 27 1145 12 1140 28 1144 13 1142 29 1141

'14 1144 15 1145 16 1143 l

l l

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-369 -

UNIT NAME muyulge, 1 DATE v3/13/se REPORT MONTH February 1996 COMPLETED BY g. A _. nilliams TELEPHONE tius;-acz-dded (1) (2) (3) (4) (5) 1 R MET-E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE j O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 3 96 3 F 37.22 A 2 CB PUMPXX UNIT MANUALLY TRIPPED DUE TO REACTOR COOLANT PUMP '1A' BEARING COOLING 6-P 96 5 S --

A --

HG XXXXXX SECONDARY CHEMISTRY 7-P 96 5 F --

A --

SA XXXXXX CONTAINMENT GAS ALARM ,

8-P 96 5 F --

A --

IA INSTRU NUCLEAR INSTRUMENTATION ADJUSTMENTS 4 96- 2-10 F 20.12 A --

HA TURBIN TURBINE / GENERATOR HYDROGEN LEAK i (REACTOR CRITICAL) {

l (1) (2) (3) (4)

F Forced Reason- Method: Exhibit G - Instructions .

S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data

  • B-Maintenance or test 2-Manual Scram Ent y Sneets For Licensee
  • C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain) File (NUREG-0161) i E-Operator Training & License Examination F-Administrative (5)

G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)

_ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ - . _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ . _ _ - __- _ _ _ - - - _ _ _ _ _ _ _ . ~ - - - - _ . - - --- - - - _ _ _ - .. - . - _ - - _ _ _ _ _ _ _ - - - - .

__. .- .~ . - . - - . . . = - .- - - - . ._ .- .

I l

l l

l DOCKET: 50-369 l UNIT: McGuire 1 Date: 03/15/96 1

NARRATIVE

SUMMARY

l MONTH: February,1996 McGuire Unit I began the month of February in operating at 100% full power. The unit operated at or near 100% full power until 02/03/96 at 1419, when the reactor was manually tripped at approximately 60%

power due to loss of component cooling for bearing cooling to reactor coolant pump 'l A'. The unit was l placed on-line 02/05/96 at 0332. During power escalation, the unit held at 30% power on 02/05/96 from 0530 to 0928 due to secondary chemistry. The unit held at 32% power from 0933 to 1014 due to containment gas trip 11 alarm. The unit held at 50% power from 1150 to 1246 due to nuclear l

instrumentation adjustments. On 02/10/96 at 0330 the unit began reducing load and the turbine / generator  !

was removed from service at 0653 due to a turbine / generator hydrogen leak (Reactor remained critical at approximately 12% power). The unit was placed on-line 02/11/96 at 0300. The unit retumed to 100% full power on 02/11/96 at 1240 and operated at or near 100% the remainder of the month. l l

1 l

1 l

l l

Prepared by: R. A. Williams Telephone:(704)- 382-5346

I i

I l .

MONTHLY REFUEI ING INFORMATION REOUEST

1. Facility name: McGuire. Unit 1 l 2. Scheduled next refueling shutdown: Februarv 1997 l 3. Scheduled restart following refueling: Mav 1997 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 l

THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4. Will refueling or resumption of operation thereafter require a technical specification change or otherlicense amendment?

l Ifyes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 19).

(b) in the spent fuel pool: 221

8. Present licensed fuel pool capacity: 14fil Size of requested or planned increase: .=
9. Projected date oflast refueling which can be accommodated by present license capacity
March I i
m. . .

l DUKE POWER COMPANY DATE: March 15 1994 Name of

Contact:

R. A. Willimme Phone: (704)- 382-5346 i

l-1 l

I

i OPERATING DATA REPORT i

DOCKET NO 50-370 DATE March 15. 1996 OPERATIN6 STATUS COMPLETED BY R.A. Willians TELEPHONE 704-382-5346

!. Unit Name: Mc6cire 2

2. Reporting Period February 1, 1996-February 29,1996  ;

l l 3. Licensed Thersal Power (MWt): 3411 l 4. Naseplate Rating (Gross MWel: 1305e Notes eWaseplate Rating  !

5. Design Electrical Rating (Net MWe): 1180 (Gross MWel calculated as  !
6. Maxieus Dependable Capacity (Gross MWe): 1171 1450.000 MVA .90 power ,
7. Mszieue Dependable Capacity (Net MWel 1129 factor per Page ill,

! 8. If Changes Occur in Capacity Ratings (Itees Nueber 3 Through 7) Since Last NUREG-0020.

Rr?- Give Reasons j

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason For Restrictions, if anyt 1

i r

This Month Yr.-to-Date Coeulative ,

l

11. Hours in Reporting Period 696.0 1440.0 105192.0 l
12. Nuaber Of Hours Reactor Was Critical 696.0 1440.0 B3195.6 ,
13. Reactor Reserve Shutdown Hours - --0-- - l 1
14. Hours Senerator Dn-Line 696.0 -1440.0 82170.8

. 15. Unit Reserve Shutdoun Hours --0-- --0--

l

16. Gross Thereal Encrgy Generated (MWH) 2366757 4892864 270132513 ,
17. Gross Electrical Energy Generated (MWH) 827826 1710592 94213868

]

18. Net Electrical Energy Generated (MWH) 798813 1649526 90361883
19. Unit Service Factor 100.0 100.0 78.1
20. LPrit Availability Factor 100.0 100.0 78.1
21. Unit Capacity factor (Using MDC Met) 101.7 101.5 75.3
22. Unit Capacity Factor (Using DER Net) -

97.3 97.1 72.5 l

23. Unit Forced Outage Rate 0.0 0.0 6.3
4. Shutdoun Scheduled Over Next 6 Monthe.(Type, Date, and Duration of Each)

Refueling - April 05, 1996 - 45 days

25. If Shut Down At End Of Report Period. Estiested Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved f INITIAL CRITICAL!!Y l INITIAL ELECTRICITY  !

COMERCIAL OPERAT10N J

l 3

I i

OPERATIN6 DATA REPORT DOCKET NO 50-370 UNIT NcGuire 2 DATE March 15. 1996 COMPLETED BY R.A. Williams TELEPHONE 704-382-5346 )

l 1

MONTH February.1996 l

J QR ' AVERA6E DAILY POWER LEVEL RE AVERAGE DAILY POWER LEVEL )

(MWe-Net) (MWe-Net) j 1 1145 17 1149 ,

1 l

2 1140 18 1149 3 1143 19  !!49 l l

4 1142 20 1150 1

5 1146 . 21 1150

)

6 114B 22 1150  ;

l 7 1148 23 1150 .

i 8 1149 24 1150 9 1150 25  !!49 10 1148 26 1150 11 1148 27 1149 12 1147 28 1149 13 1148 29 1147 14  !!49 15 1149 16 1147 l

i j

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-370 -

i U N I T N A M E m w y 1 x r., 2 DATE us/1d/sb REPORT MONTH February 1996 COMPLETED BY x. a. stilliams TELEPHONE ( i ve ) -a esz-ds e 6 (1) (2) (3) (4) (5) '

R MET- i E HOD T A OF LICENSE -

N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE DURATION REPORT TEM l O P O DOWN COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE.

NO SHUTDOWNS OR REDUCTION S .

5 l

I i

i i

f i

3 i 1

, (1) (2) (3) (4)

F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data ,

B-Maintenance or test 2-Manual Scram Ent W Sneets For Licensee i C-Refueling 3-Automatic Scram Event Report (LER D-Regulatory Restriction , ,

4-Other (Explain) File (NUREG-0161))

E-@erator Training & License Examination i F-Administrative (5)

G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain) j

-o ,

t J

f i

-.,_m_,. _ _ _ _ , _ _ _ _ _ _ _ _ _ _ , _ _ _ _ _ _- -

DOCKET: 50-370 UNIT: McGuire 2 Date: 03/15/96 NARRATIVE

SUMMARY

MONTH: February,1996 McGuire Unit 2 began the month of February operating at 100% full power. The unit operated at or near 100% full power for the entire month.

1 1

I l

i l

I i

1 Prepared by: R. A. Williams

! Telephone: (704)- 382-5346  !

l l

1

i i l

i I

MONTHLY REFUFI ING INFORMATION REOUEST l

1. Facility name: McGuire. Unit 2
2. ' Scheduled next refueling shutdown: Anril 1996 l

! 3. Scheduled restart following refueling: May 1996 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

l l

4. Will refueling or resumption of operation thereafter require a technical specification change or {

other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 1H (b) in the spent fuel pool: 8B
8. Present licensed fuel pool capacity: 1361 Size of requested or planned increase: =

)

{

l

9. Projected date oflast refueling which can be accommodated by present license capacity:

December 2001 DUKE POWER COMPANY DATE: March 15.1996 Name of

Contact:

R. A. William = Phone: (201)- 382-5346 i

i  !

i l A

l 1

- - r.,n m ,- , . , , . - ----,,-.7, .

e,e .c ., ..,,, , - , . . - - -

, ,.