O Commonweahh Illison Company Braidwom! Generating Station v
Route al, Ikix fil liraceville. II. 60 607%19 Tel HI5-458 280I March 6,1996 Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Su w.: Braidwood Nuclear Power Station, Units 1 and 2 "Braidwood Simulator Facility" Certification of Simulator Facility - 10CFR 55.45 NRC Docket Nos. 50-456 and 50-457 The purpose of this letter is to submit information pursuant to 10CFR 55.45.b.5 in order to renew the certification of the Braidwood Simulator Facility. This submittal for 4
certification renewal addresses both operating units at Braidwood Station with Braidwood Unit 1 serving as the reference plant. In the section titled " Reg. Guide 1.149 Requirements" of our certification report, the requirement for dual plant simulation facilities are evaluated and the results demonstrate that the Braidwood Simulator's performance compares favorably with each unit. In addition, steady state testing per ANSI /ANS-3.5,1985 Appendix B was performed. These tests compare the Braidwood simulator performance to Braidwood Unit 1 performance with favorable results.
The attachment to this letter contains two NRC Form 474's, i.e. One for each docket number and two copies of the Renewal Certification Report. These documents certify the Braidwood Simulations Facility meets the Nuclear Regulatory Comnission's regulations.
Please direct any questions that you may have to John Walker, (815) 458-2801 extension 2375, or Ken Tiefenthal, (815) 458-3411 extension 2422.
arl L. Kau Site Vice President Braidwood Generating Station Attachments cc:
H. J. Miller, Regional Administrator - RIII R. R. Assa, Braidwood Project Manager - NRR C. J. Phi' lips, Senior Resident Inspector - Braidwood 9603140205 960306 PDR ADOCK 05000456 P
PDR i
$b
(.
1 k C hh k
\\
A Unicom Company
l NRC FORM 474 U.S. NUCLEAR REGULATORY COMMISSION APPROVED ev Ous: NO.asso413e (645)
ExPtREs; osrairse Estimated tween per #escanse to comply with this mandatory wWormaten coinction 120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> This evormaten e used to comfy e simuisten facety Fones's request comments regereng tusen entsmeie to fne trWormation and Recoros Management SIMULATlON FACILITY CERTIFICATION
' ' " ' " * ' " ' " ' """**'"*'"'C'***'*"*"*S""oc=
0001. 'end to the Paperwork Reduction Project (31504138L Of I
j and Budget. Weenington. DC 20503 NRC may not conduct er sponsor and a person e nel remered to #sepond to, a coinecten of eWormaten urvess a displays a currently valed OMS control number estSTRUCTION8; This form as to be f#ied for snitial certif m i+--- ~ (If CM), one for any change to a simulation facmly postormance testing plan maos after outasi suommai of such a pian Provice as following WWorrPaten and check the apptconese bon to mdcate reason for suDmittal F ACILITY l
Braidwood Station - Unit I DOCKET NUMBER so-- 456 LICENSEE Commonwealth Edison Company gg The e to certify tnet.
The above named facilsly hcensee e using a simulaten facshty consisting solely of a pienHederenced simulator that meets the requaements of 10 CFR $5 1
- 2. Documanlaten se avaiiatHe for NRC review m accaroence wth 90 CFR 55 45(b) 3 7tus simulation facility moois Ine guidance contemed m AN51 TANS 3 5,1985 or AN$ltANS 3 6-1993 as endorsed by NRC Reguietary Guide 114e N1here are any EXCEPTIONS to tne certificaten of #ws item, CHECM NERE [ ] and desence fully on madrimnal pages es necessary NAME lor other scenteAcation) AND LOCATION OF &lMULATION F ACILITY Production Training Center 36400 S. Essex Road Wilmington, IL 60481 l
X siuut4 TION rACiuTY PERFORuANCE Test AsSTRACTs ATTACwEn (sor,e, o,mance ses,s conducted,a rne penott enang w,m ene as,e or,3 DE$CRIPTION OF PEHFORMANCE TESTING COMPLETED (Anach samhoner pages as necessary ano menpfy ine stem cesenpDon eeng conDnuec)
See Enclosure, Section A.3, Simulator Tests.
See Enclosure, Attachment 2,' Steady State / Normal Operation /
Real Time / Valve Stroke Time / Transient Test Results l
1
$IMULATION FACILITY PERFORMANCE TESTING $CHEDULE ATTACHED (For tne conduct of apartmunatoir 25'of performance rests per yea X
commencmp ierth the date ofines cernncahon)
DESCRIPTION OF PERFORMANCE TESTING TO BE CONOUCTED (Attach comDonar pages as necessary ano scenefy the sfem cesenspon oorag conenuco)
See Enclosure, Appendix 6, Simulator Test Procedure and Malfunction Testing Schedule X
PERFORMANCE TESTING PLAN CHANGE. (For any snomacanon so e pertbrmance sessnp pran suomefred on a poveaus certr# canon)
DE$CRIPTION OF PERPORMANCE TESTING PLAN CHANGE l Affach somisonar pages as necessary anc cenpfy the trem gescopean Deng contmuso)
See Enclosure, Appendix 6, Simulator Test Procedure and Malfunction Testing Schedule Malfunctions CH09 and FW47 have been added.
RECERTIFICATION (Deacnbe conect,ve actnons tenren. attacn msurre of compooroc perturmance lesang n. eccomance utn 10 CFR SS 4SibbtS)(v)
(Attech Odenonal pages as necessary engt ndenth the neem cescnpton beong connnuedl Any faise statement or omissaan m sne cocument, mciumng attacnmems, may on suniect to cewn ena snminen sancieone I comty unoer penemy of pequry Inst the information m document (13 attacftnenis a Fue and correct I
I 6tGNATURE - AUTMONLZED REPRESENTATiV YlTLE Daig Braidwood Sta. Site Vice-President g
in &coroence **in to CFR 65 644mmMuons tnis form snan ne suommeo to in NwC es j
follows Bi OELfvERY IN PERSON ONE WHIT 11 FLINT NORTH BY MAIL ADORESSED TO DIRECT 3R. OFFtCE OF NUCLEAR REACTOR REGULAftON TO THE NRC OFFICE AT tilst ROCKvtLLE p*t U.S. NL CLI AR REGULATORY COMMi&SION ROCirVILLE MO WASH' 4GT IN, DC 2058541001 ear
% G i J FA e e.
o&
NRC FORM 474 U.S. NUCLEAR RE4ULATORY COMMISSION APPROWED SY OMS; NO. 31004138 m
expires. 04tWM Estneind th re.-,buroen per r,oepunee to comply wdh.o c.e.monastory ev 20 T sormm.. ues.
.. s
,i fe.
,mos, comments regaroeng threen esternate to the Informahon and Recoros Managemem SIMULATION FACILITY CERTIFICATION O'"af,fo ',*,'veTf,M". "M",c"eth""sE*C'll",J'a#555; e
e and Budget, weenmeson. DC 20503 NRC may not conduct or er,ansor one a pomon a not reeweed to ressend to. e conochon of eiformai on uniese e a< splays a curremiy valid OMB coneral riuratiser
$NSTRUCTIONS:
This form e to De had for niet ceMication mcortification of r =k ena for any snenge to e mn tocan
...ence testog pian maos after ntsai suommat of sucn a pian Pro ede in. foiioning meatmeien and eneca ine appropnei. bos io mdico on vor simer.aia FAClulf DOCKET NUMBER Braidwood Station - Unit 2 64-457 LICENbEE Commonwealth Edison Company
?5-l (-Q(p The a to ceristy that The so e named escu, nc.n.e.. us.ng e sonen faci 6ty cons.ong esy c, a pianwe,e,ance souiaio, inei
- i. In.,s.arom.ni. of iO CFR ss 4s i
2 Documernation is eveismo6o for NRC revew m accordance with 10 CFR 65 aS(b)
The soulation facdsty meets the guidance contained m ANSI /ANS 3 619e5 or ANSUANS 3 5-19g3. as endorsed by NRC Regulatory Guida 1149 3
if there em any EXCEPTIONS to the ceWicaten of Ins nom. CHECM HERE l ] and coscribe hally on addihonel pages se necessary NAME gar other spentrAceton) AND LOCATION OF SiMVLATION f ACILITY Production Training Center 36400 S. Essex Road Wilmington, IL 60481 I
E SIMULAflON FACILITY PERFORMANCE TEST ACSTRACTS ATTACHEDIFor performance fests conduclotf m the penotf entbrig enth the cale of fries cerfrAcahon J DE SCRIPTiON OF PERFORMANCE TE$TIPeG COMPLE TkD lAttacn actRhonal pages as necessary am!doormfy the dem gescnanon Demg conenvooi See Enclosure, Section A.3, Simulator Tests.
See Enclosure, Attachment 1, Reg. Guide 1.149 Requirements for Dual Plant Simulation Facility.
See Enclosure, Attachment 2, Steady State / Normal Operations / Reat Time /
Valve Stroke Time / Transient Test Results.
E SIMULATION F ACILi'Y PERFORMANCE TESTING SCHEOULE ATTACHED (For fne conouct of appre=smesory 2$"of performa' ice sosts per y commencmp inta Irie cafe of tens corkncahon b OESCRiPTION OF PERFORMANCE TESTING TO BE CONDUCTED gAttaca someonar pages as necessary amt #permfy fne nom gescapnon bosng connauso)
See Enclosures, Appendix 6, Simulator Test Procedure and Malfunction Testing Schedule.
PERFORMANCE TESTING PLAN CHANGE (For any moorAcanon lo a perfbrmance seseng pan suommed on a pronous certincation i DESCRIPTION OF PERFORMANCE TESilNG PLAN CHANGE Arreen act>Donar pages as necessary ano #pennfy tne tem cesenpnon bemg cononuso) 4 See Enclosures, Appendix 6, Simulator test Procedure and Malfunction Testing Schedule.
hlfunctions CH09 and FW47 have been added.
RECERTIFICATION (Desence W6ve schons festen. atraen maurts of w rettperfbrmance fesarig m accoroance enth f0 CFR SS 45(bMSHv)
(Attacn a0dthonal nopes as necessE*y arist sdenkfy its stem pesenphon beeng conhnved)
Any fadse statemem or omissen en eus cocument mcluaing ettechmems, may De subsect to covo ena cnmmai sanctions a certrty unoer penatty of perlury that the mtormat.o document and attacnments e true end correct.
j 6sGNATURE - AUTMQRi2ED REPRESENTAfivk TITLE DATE Braidwood Station Site Vice-President infeccoraance witn 10 CF R/6 6. Comr4hecahons ins form snau ce suommeo io Ine NRC es tonows BY DELfvERY IN PERSON ONE WHITE FUNT NORTH gy MAIL ADDRESSED TO DIRECT 3R, OFFICE OF NUCLEAR REACTOR REGULATION TO THE NRC OFFICE AT 19E48 ROCKVLLLE PlKE U S. NL CLI AR REGULATORY COMul& BION ROCKVILLE. MD W4SH' 401 )N. DC 205664001 w F,AM.-
r,.
EN..
.