Corrected Tech Spec Page 3/4 6-19 Re Limiting Condition & Surveillance Requirements for Hydrogen Analyzers
ML20106E458
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/23/1984
From:
ALABAMA POWER CO.
To:
Shared Package
ML20106E450 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8410290242
Download: ML20106E458 (1)


Text

,. '

^

CONTAINMENT SYSTEMS 3/4.6.4 COMBUSTIBLE GAS CONTROL HYDROGEN ANALYZERS LIMITING CONDITION FOR OPERATION 3.6.4.1 Two independent containment hydrogen analyzers shall be OPERABLE.

APPLICABILITY: MODES 1 and 2.

ACTION:

a. With one hydrogen monitor inoperable, restore the inoperable analyzer to OPERABLE status within 30 days or be in at least HOT l STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />,
b. With both hydrogen monitors inoperable, restore at least one monitor to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.6.4.1 Each hydrogen analyzer shall be demonstrated OPERABLE at least once per 92 days on a STAGGERED TEST BASIS by performing a CHANNEL CALIBRATION using sample gases containing:

a. Ten volume percent hydrogen, balance nitrogen, for zero check,
b. Ten volume percent hydrogen, balance nitrogen, mixed with compressed air, for span check. ~

FARLEY-UNIT 2 3/4 6-19 Amendment No. 38 Corrected Page O