e alley Power Station Shippingport. PA 15077 6 912> 393-s?ss JOHN D SIEBER September 25, 1992 Vice President Nuclear Oroup l
'I.
S.
Nuclear Regulatory Commicsion Attn:
Document Control Desk Washington, DC 20555
Subject:
Beaver Valley Power Station, Unit No, 1 Docket No. 50-334, License No. DPR-66 Updated Incorvice Testing Program, Issue 2, Revision d The purpose of this submittal is to provide the Nuclear Regulatory Commission (NRC) with an informational copy of revisions to the Beavel Valley Power Station Unit 1 (BVPS-1) Inservice Testing (IST) Program.
Enclosure 1
provides a summary of the IST program changes which have been incorporated into Revision 8.
Enclosure 1 is Issue 2, Revision 8 of the BVPS-1 IST Program.
It has been detern.ined that the IST program changes do not require NRC approval prior to implementation.
This determination was made because all of the changes are either:
editorial in nature in compliance with the 1983 rdition through Summer 1983 Addenda of the ASME XI Code In compliance with the positions delineated in Attachment 1 of Generic Letter No.
89-04,
" Guidance on Developing Acceptable Inservice Testing Procrams" If you have any questions regarding this submittal, please contact Ms. Julio Carl at (412) 393-5235.
Pincerely, 1
Lbl<
D.
Sieber Enclosures cc:
Mr.
L. W.
Russbach, Sr. Resident Inspector Mr.
T.
T.
Martin, NRC Region I Administrator Mr.
A.
W.
De Agazio, Project Manager Mr.
M.
L.
Bouling (VEPCO) f
- e. 3 e,,
){ k h
9210090390 920925 PDR ADOCK 05000334 PDR P
P1 CLOSURE 1 SRMARY OF CHANGES TO T'IE UNIT 1 IST PROGRAM fREV. 8) 1.
We following changes made to the Unit 1 IST Program are in accordance with the ASME XI Code and Generic letter No. 89-04:
a.
Added to the end of the paragraph followiM Table 1WV-3'00-1 on page 51, "except where remote position verification is required".
%is was also added to the BVPS-2 ISr Program in the last revision.
Passive valves with remote position indication are verified in accordance with IUV-3300, b.
Noted in the " Comments " section of the " Valve Testing Outline" sheets for the following weightcd arm check valves and under the "Altemate Test" section of their associated CSJ's that they are full stroked "by mechanical exerciser":
[10S '.> and 4), (IRS-100 and 101) and [1FP-800, 804, and 827) (pages 76, 77,105,127 ard 134).
c.
Deletcd partial stroke of the Main Steam Isolation Valves
[TV-1MS-101A, B,
and C; from the " Valve Testing outline" sheet (page 93) in acc& dance with revised Cold Shutdown Justification No.
24 (page ul) and based on NRC approved Technical Specification Amendaent Nc.162.
d.
We "NSA" position on the " Valve h sting Outline" sheet for the Dypass Feedwater Regulating Valves { FCV-1W-479, 489 and 499)
(page 97) was changed from throttled (T) to shut (S) and the surveillance test was changed to 10ST-47.3A(3B). Consequently, Cold Shutdown Justification No.
30 (page 135) was deleted since the valves can nott be tested quarterly.
e.
Noted in the "Commnts" column of the " Valve Testing outline" sheet for Main Condenser Air Ejector Discharge to Contain: rent valve (TV-1SV-100A)
(page 99) that the valve will be stroked and timed "open and closed". This was done to meet Corrective Action Item NO. 2 of LER 92-001-00, f.
Deleted the River Water to Control Room Back-up Cooling Coil Check Valves (1W-135 and 136] aid associated Relief Request No. 33 (page 167) from the BVPS-1 IST Program. We check valve internals were permanently removed from these valves }~ r DCP-1753 during the 8th Refueling Catage.
g.
Deleted the Riser Water to Charging Pump Lube Oil Cooler Check Valves [12-158 ard 259] (page 103) from the BVPS-1 IST Program.
2ne check valve internals were permanently removed from these valves per DCP-1756 during the 8th Refueling Outage.
Page 1 of 4
4 4
D1 CLOSURE 1 (continued)
SUMMARY
OF OiANGES 'lU THE _ UNIT 1 IST PROGRAM (REV. 8) (continued)
- h. - Changed _ the Valve - Category" - of Diesel Generator Cross Connect Isolation 7alves (110-15 and 16]
(page 110) from "B/P" to "B".
The valves will now be stroked in the opan direction per 10SF-47. 3A on a quarterly frequency until SMR-2426 is ocupleted at least - by the 9th Refuelirg Outage. At that time these valves will be charged back to Catcgory "B/ Passive" valves and would not require stroking.
' 2.
The following charges made to the Unit 1 ISP Program are editorial in nature:
a.
Added additional detail describirq how flow is obtained for the Charging Pumps (101-P-1A, B,
and C] to the " Comments" column on the "Punp Testing Outline" sheets (pages 6 - 8),
b.
Noted in the '" Remarks" section of the " Pumps Testing Outline" sheets for the DiSI Punps [1SI 3-1A ard B] (pages 13 - 14) that.
the pumps are tested quarterly on recirculation " flow". Also noted_ that vibration readings are obtained using fixed vibration probes "on pump shaft".
c.
Noted in the " Remarks" section of the " Pump Testirg Outline" sneets for the Auxiliary-Feedwater Pumps
[1Bf-P-2, 3A and 3B]
- 30) that the pumps are tested quarterly-on (pages 28 recirculation " flow".
Also deleted reference to usiry the flov indicators at the Snutdcun Panel for [1FW-P-3A] on page 29.
This.
was inadvertently not deleted in the last revision to the IST
- Program, d.
Correcto' the nomenclature for [7R-101-101]. from level irdicator i
to level " recorder" in the "Cemments" section for "Pi" on the l
" Pump Testire Outline" sheets for River Water Pumps (1WR-P-1A,-B and C] (pages 31 - 33).
e.
Deleted the word " safeguards" from the description of the cump in-containment in the " Basis fo* Relief" in Pump Relief Request No 's 6 and 7 (pages 43 ard 44).
f.
Added new Item' B.1 on page 50 as follows:
"If the inoperable check valve is specifically identified in the Technical Specifications, 'then the applicable technical specification action-statements must be followed". This item was accidentally omitted from the IST Program for check valves and is being added for completeness.
The requirement has existed-in TSAP 3.10, "IST L-Administrative Procedure", Section 5.7.3.",
and was also added to the BVPS-2 IST Program in the last revision.
I Page 2 of 4 I
DV:LOSURE 1 (continued)
SUMMARY
OF OIANGES TO IHE UNIT 1 IST PROGMM (REV. 81 (continued) g.
Corrected the Irferenced Table number on--page 51 to " Table IWV-3700-1".
h.
Corrected the description of the abbreviations for MOV to " Motor Operated valve" and for SOV to " Solenoid Operated Valve" (page 52).
- i. The description for nonitorirg leakage frm RHR Return Isolation Valves [MJV-1RH '.20A ard B] was changed in the "Cctments" column on the
" Valve Testim Outline" sheet (page 64) to read, "Cbntinuous Monit orirg of RHR System Pressure" rather than punp dischurge pressure.
- j. Deleted the remote position verification (RPV) requirement from-10SP-47.3A(3B) an? added it to 1BVT 1.47.5 in the "Camnents" section of the " Valve Testirs Outline" sheets for Sanple Valves-(TV-1SS-102A1 and A2]
(page 78) and (TV-1SS-105A1 and A2]
(page 79).
k.
Corrected the draviry coortiimte for Relief Valve (RV-10C-112B1]
to "I)-4" on page 85.
1.
Corrected the " Valve Testing outline" sheets for the Main Steam Non-Return Valves (NRV-1MS-101A, B and C] (pages 92 and 93) to reflect a full stroke exercise in the reverse direction. Cold Shutdown Justification No. ~22 (page 130) was also revised to-reflect this testing.
m.
Updated the referenced tests for full stroke exercising of River Water Pump Dischartje Check Valves [1RW-57, 58, and 59] in the-forward and reverse direction to 10ST-30.2,. 3, ard 6 respectively (page 100).-
- n. _Updatai the referenxd test from 10ST-47.3A(3B) to 10ST-30.2 in the "Ccxments" section of the " Valve Testing Outline" sheet for River -Water Pump Discharge Valves [FDV-1RW-102A1 and A2]
(page 100); to 10ST-30. 3 for_ [FDV-1RW-102B1 and B2] - (page 100) ; -
and to 10ST-30.6 for (}DV-1RW-102C1 and C2] (page 101),
o.
Added the following to help clarify the last sentence of the
" Basis for Relief" in Relief Request No. 4 (page 141); " Relief is -
also requested fr m cold shutdown _" full stroke". exercising because full flow testing could-result-in a.
low-temperature overpressurization of the RCS".
Page 3 of 4 l
DiCIOSURE 1 (continued)
SUMMARY
OF OWJGFS 'IO 71E INIT 1 ISP PRCGPR4 (RFN. 8) : (continued) p.
Deleted the el " expansion". frcan the-sentence explaining that "there is insufficient expansion volume to receive the additional.
Inventory" in the " Basis for Relief"'in Relief Request No.'s 16 and 18 (pages 152 and 154). This was done to mie these relief rcquests consistent with Palief Request No.15 in wordity.
q.
Deletcd the words, " generators resulting in a plant trip and" from the second sentence in the " Basis for Relief" in Relief Request No.. 29 (page 165).
'Ihese words were accidentally. added to the relief request by the typist in Revision 6 of the IST Program and do not belong here.
l Page 4 of 4