Advises That Due to Delay in Reaching Criticality,Limited Operational Fog Monitoring Program Rept Will Not Be Submitted Until 860531.Program Will Continue Through Winter 1985-86 to Acquire Adequate Visual Observation Data Base
ML20101T501
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 01/31/1985
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8502060197
Download: ML20101T501 (2)


Text

o DUKE POWER GOMPAhT P.O. BOX 33180 CHARLOTTE, N.O. 28242 HAI, B. TUCKER Tz EPIIONE wwmenesanewv (704) 373-4531 January 31, 1985

" " = = * = = = =

Mr. Harold R. Denton Director Office of' Nuclear Reactor Regulation

~

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention:

Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: Catawba Nuclear Station Docket Nos. 50-413 and 50-414

Dear Mr.-Denton:

My letter of October 2, 1984 stated that the' limited operational fog monitoring program began at Catawba Nuclear Station on September 1, 1984 and would continue through the winter of 1984-1985, with an interim report to be submitted by May 15, 1985.

Due to the delays in reaching criticality and significant power on Unit 1, the visual observation portion of the program will not contain enough operational data to be useful for the interim report. We propose, therefore, that we continue this program through the winter of 1985-1986, so that we can acquire an adequate operational visual observation data base that includes critical fall-winter cooling tower operations. The report following this study would be submitted by May 31, 1986 as a final report on this phase _ of the program.

The operational fog monitoring program will be. implemented as I stated in my October 2, 1984 letter, for one year, beginning with both units on line. A final fog study report will be submitted upon completion of the one year study.

Very.truly yours, KL4.eaLys Hal B. Tucker LTP/mj f

' 'M ; C > d.

cc: 'Mr. James P. O'Reilly, Regional Administrator

.U. S. Nuclear Regulatory Commission

' Region II 101 Marietta Street, NW, Suite 2900 Atlanta,~ Georgia 30323 P

7\\

99 }o i

T,M] ~6 -

r Mr. Harold R..Denton, Director January 31, 1985-Page. cc: NRC Resident Inspector Catawba Nuclear Station Mr.' Robert. Guild, Esq.

Attorney-at-Law

'P. 0. Box 12097 Charleston, South Carolina 29412

-Palmetto' Alliance

~

2135V Devine Street

> Columbia, South Carolina 29205

.Mr. Jesse L. Riley-Carolina Environmental Study Group 854 Henley Place Charlotte, North Carolina 28207

.i s

b f

4 y..

7 e

f 4

.