ML20101T335
| ML20101T335 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 06/30/1992 |
| From: | Simmons N, Robert Williams DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20101T303 | List: |
| References | |
| NUDOCS 9207210063 | |
| Download: ML20101T335 (10) | |
Text
._.
~.... -
-.=_..
t OP!!)?lRG HtA !!P0tf DOCIlfN0 50413 017! h ly 15, 1992 OP!lAt!33 ITAfst (0KPl!TIDB1 2.A.Willitst 7ti! PEN! _1) N735Iii~
~~
!.CnitNine: Citatta1
- 2. hporthg fer103: hte 1,1992+ Jute 30,1992 3 LicenstJ flertal Pont (KVt).
3(11 L Xtteplatt titing (Griss HVe):
130$'
Xotts 'Kaneplate Rating 5.DesigntiectricalAtting(letEve):
1145 (GrcssEVelcalculttedas 6.NatisusLepet6bleCapacity(GrossEve):
1192 100.000 N7A 2.90 pour
- 7. Katista Depends 11e Capacity (Net KVe):
1129 fletcrperPage111, 8.IlChangesoccurinCapseltiRatings(Ecssfuther3firough1)lincelast EUt2G4020.
Report..Gifttensons l
'97PowerLeveltokbichtestricted,IfAny(NetHe):
'~
~
~
10.teasenfortestrictieta,1{iny:
ThisKenth Tr. tc4 ate Cunittive
.11. Floors In leperting Period 110.0 067.0 61416.0 11.EutherOfHoursletcterValCritical 720.0 4367.0 46757.1 13.ReacterleserveShutdownBours
~0"
- 0"
~0" 14.HoursGeteratorOadine 120.0 067.0 45762.9
- 15. Mit teserve ahutdown burs.
~0-
"0"
-4 *
- 16. Gros 7ttrati Ener97 Generated (XVII 2400655 14592893 148079198 17.OrcssllectricalInergyGentrated(MVB) 84d596 5183971 520533%
- 18. Ett Electrical Enern :tttreted (MsHj B0006 018053 (8851747
- 19. Ptit Service Inuter 100.0 100.0 14.5 10.UnitAft11thilityfactor 100.0 100.0 ft.i 21.UnitCapacityfactor(CsingN!CNet)
-91.0 99.8 70.1 22.UnitCapacityiteter(Usttg!!!Ett) 97.6 98.4 69.5 23, hit forced Outtle late 0.0 0.0 10.5
- 24. Shutdcra scheduled Over Kett 6 Heaths (Type, Date, and hretion af hch):
,,,, Refuel i no - ~Jul y 11. 1992 - 70 davs 25,ifitstDevaAtIndOfReportPeriod,IstinatedDateofintty:
26;UnitslaTettStatus(PriortoConnercialOperatical' lorects Achieved 1
1
- Illf1AL CRITICALITT INITIAL ILICitICITT-COEMitCIAL 0?!!AtI01
$7210063920715' R
ADocx osooo434 PDR
. ~ -
Of! LATIN 3tATAIIP0tt DOCKit li0 5H13 Gil Cativta 1
$1TIIily 15, 1992 _ '
CCXPLI110El 1.A.Williant TitI?HOU 108.3135187 nu1TI June,1192 111 AVERAGI CAILY POVit it'ilt DAY AVIIAGILAILYPCV11LIVit (XWttet)
(.VVtVet) 1 1132 17 1125 2
till 19 1125 3
1128 19 1123 i
1126 20 1124 5
1125 21 1125 i
litt 22 1132 1
1075 23 1127 i
'i i
1120 24 1123 i'
i 1121 25 1122 _
10 1121 26 1119 11 1121 21 1100 12 11M 2'
1091 13 1128 29 1084 Il 11$6 A
1069 15 1124
?(
1123
_~
UNIT SHUIDOWNS AND POWER EEDUCTIONS
- D O-N !*0.-
5J-413' UNIT NAME caianna 1 DATE ""TD/La/3e 1
REPORT MONTH June 1992 COMPLETED BY n.
u.
dirauns -
TELEPHONE t iv4 } a64--320a
'(1) 2)
3 (4),
(5) l E-HOD Tl A
OF LICENSE N
Y-S SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P
. DURATION O
DOWN REPORT Tai COMPONEh"I ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRDICE NO SHUTDOWNS ORi REDUCTION S i
l 8
i
?
I
\\
(1)
(2)
(3)
(4)
F Forced Reason:
Method:
Exhibit G - Instructions S Scheduled A-EquiDment FailureB-Maintenance or test (Explain) 1-Manual for Preparation of Data 2-Manual Scram Entry St uets For Licensee 4
C-Refueling 3-Automatic Scram Event Reoort (LER 4-Other (Explain)
Fils (NUNEG-G161))
D-Regulatory Reatriction E-Operator training & License Examination F-Administrative (5)
H-Ouher (Explain) (Explain)
G-Operator Error Exhibit I - Sa:ae Source
. - ~..
..r 4
f f
a.
DOCKET NO:
50 413 UNIT; Catauba 1 f
DATE:
7/13/92 NARRATIVE
SUMMARY
!. f ', \\ ' '
MONTil: ' June 1992
- Catawba Unit 1 bogan the month of June operating at 100% full power.
- The unit operated at or neat-100% full power for the encirc. nonth.
f E
Prepared by:
N. C. Simmons
- Telephone:-
704-382-5263 I
b r
v,
~+
w
,U h,
e
,,--4mv--
-#-mw-c.,e
--w.ir
..we%-.w--w~.
.-w.--,
,-.-w..
wn n.--
d
,#w..
-+
v
,,eay
---,ey
.-m.-.s=
MONTHLY REFUl]jJNG INFORMATION RFJUESI 1.
Facility name;__CatawM.
Unit 1 2.
Scheduled next refueling shutdown: July 1992 3.
Scheduled restart following refueling:_SSpigaber 199_2 THE PROJECT liANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.
CHANGE OR LICENSE AMENDMENT. TilEREFORE, QUESTIONS 4
.}
THROUGH 6 WILL NO LONGER BE MAINTAINI:D IN THIS REPORT.
r-4.
Will refueling or resumption of operation thereaf ter require a technical specification change or other licensn amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety-Review Committen regarding unreviewed st.fety questions?
5.
Scheduled dato(s) for submitting proposed licensing action and supporting information.
6.
.Important licensing t.onsiderations (new or different design or
- supplier, unreviewed design or performance analysis
- methods, significant changes in design or naw operating procedures).
7.
Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 336 8.
Prc.sent licensed fu21 pool capacity: 1418 Size of' requested or planned increaset
.9.
Projected date of last refueling which can be accommodated by present licensed capacity: September 2009 a
DUKE POWER COMPANY DATE:
July 15, 1992 Name-of
Contact:
R. A. Williams Phone 704-382-5346
_mm_
______._2m_.___._____________m.__.
_____,-.m______
l
['
CP!RATIN3 ikTA RIP 0ff DOCK!! X3 5 H 14 tATI h li U..fIf~ ~
Ofillf1IG STATUt COMPLITID li t.A.Tillias
~
T!i!PBONI704 37Mll7 1.UnitEare:Catasta2
- 2. Reportit; teried: hne 1,19924nte30.1992 3.Licenst$thersalP:,ver(Est):
3(11 4,lateplatelating(GrcssMWe):
130P Ectes 'Rastplate pating 5.Desigttiectricallating(natMVe):
1145 (GressMVe)calculatedas
- 6. Muists l'ependable Capacity (Gross XVe):
1192 1450.000 DA 1.90 pcuer
- 7. Marious Depenhble Capacity (Net XVt):
1129 facterpt'Page111, 6.IfChangesoccurinCapacity14 tings lltensRutter3through7)$13etlast EURIG4020.
Itport.Gifeleascnst 9.PcVerteVelTOUnichReittlett[IfAny{WetXVt);
10.ReasonIerRestrictions,ifany:
Thin Month fr. te inte Cuaulative 11.EcutsinRepcitingPeriod 120.0 1367.0 51132.0 12.EntberOfEcursteactorWasCritical 720.0 (3(4.4 38H2.0
- 11. Reactor testrie Shuthun Ecots 4-4~
-t-lt. M rs Gtattator On line 720.0 4313.1 37877.1 15.UnitteserveShutdennHours "0"
"Da 4"
- 16. Gross 7):artal iner9T Generated (MG) 2399968 11193981 119520165 11.GrossIlectricalInergyG9erated(NVE) 811362 5122465 (2298370
.18 pet l ectrica Knergy Geterated(MVH) 605015 4162007 39715d76 l
l 19 l'ait Service f actor 100.0 98.8 73.6 20.UnitAt:11abilityfacter 100.0 H.8 73.6 21,taltCapacityfacter(UsingMDCFet) 99.0 98.6 68.2 21.UnitCapacityfactor(UsingtilN(t) 97.7 V7.2 67(
23,UnitIcicedOutagelate 0.0 0.9 11.9 24.JhutdevnSeteduledOverNext6 Months (type, tate,andCurationcflach):
flone 25.IfShutDevnAtEndOflepertPerled.IstinatedDateci$tittup:~
Perecast Achieved 26.UnitsInTestStatus{PricttoCcatercialOperation):
(
111TIkl CRITICulff IIITIAL IlltitICITI (CHI!CIALCPIRATICI
4 OP!!ATINGtATA!!P0tf I
D0011730 50414 U111 Cattvba2 LATIJuly 15,1692 C0KfLITIDBf R.A.Villites 71LIPHOVI 1H 3ff"IIII MONTI,
Jut,1992 LAt AVitAGI DAILY POVit LIVIL DAY -
AVIRAGE DAlli 70litt LIVIL
~
~
(MVelet)
(MVtNet) 1 1141 17 1132 1
1139 1A 1101 3
'113f Il 960 4
1132 20 1129 1131 21 1135 2
i 1132-1143
' 1107 13 1055
- i. ;
i 1031 24 1125 1
1126 25 1126
=10 till 26 1125 11
-1134 27 1126 12-1136 26 1136
- 13 '
- 1134-29 1126 s
11 1132 -
30 1121 15 1130
'li-1130
___-m_._Em__m_
.__m_.---__m._-_m.__________.._____m_._.___._._m
._.___.m_m.__
________.m.-_..___
_-.m
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-414 UNIT NAME carasina e DATE us/13/ve REPORT MONTH June 1992 COMPLLTED BY n.
c.
dirmund TELEPHONE t4ua)-auz-azda (1)
{2) f3},
(4).
(S)
E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
%DE CODE PREVENT RECURRENCE 10-P 92-6-19 S
B HB VALVEX CARD FOR CONTROL VALVE 3 CIRCUIT BOARD REPAIR 11-P 92 23 S
B BB VALVEX COMBINED INTERCEPT VALVE 4 REPAIR g
i (1)
(2)
(3)
(4)
F Forced Reason-Method:
M ibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data i
B-Maintenance or test 2-Manual Scram EntW Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER (NUREG-0161))
D-Regulatory R9striction 4-Other (Explain)
File 7
E-Operator Training & License Examinatlor; F-Administrative (5)
G-Operator Error H-Other (Explain) (E< plain)
Exhibit I Same Source 4
L l
l I
[
. - ~ _
J r
1 i
DOCKET NO:
50-414 st l
UNIT:
Catawba 2 4
DATE:
7/13/92 l
NARRATIVE
SUMMARY
MONTH: June 1992 1
Catawba Unit 2 began the month of June operating at 100% full power.
The unit operated at or near 100% full power for the e,itire month.
t
. Prepared by:
N. C._Simmons Telephone; 704-382 5263
! L, 6
l MONTHLY REFUELING INFORMATION REOUEST 1.
Facility name: Catawba, Unit 2 2.
Scheduled next refueling shutdown: February 1993
-3.
Scheduled restart following refueling: April 1993 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.
CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
-4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (now or different design or
- supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 2H3 8.
Present licensed fuel pool capacity:-1418 Size of requested or planned increase:
9.
Projected _date of last refueling which can be accommodated by present licensed capacity: September 2011 DUKE POWER COMPANY DATE:
July 15, 1992 Name of
Contact:
R.
A.
Williams Phone:
704-382-5346
__-_ - __ _ __-____-_ - _ ____-___-_ __