VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTE:
June YEAR:
1992
's o
s Approved:
t Sta nganager 2p e
9207160063 920710 PDH ADOCK-05000338 R
'_ 4 O ERAT!kG DATA REPCOT DOCKET No.:
50 338 DATE: July 1, 1992 CCNTAtt: 0. E. Kane PHONE 1 (703) 894-2101 OPERATlWG STATUS
.1.
Un i t N ame s............................... N o r t h Ama 1 2.
Reporting Periodt......................... June 1992
- 3.. L i c ens ed T h'rma l P owe r ( AWt ) :.............
2,746 4.
Nameplate Rat inc (Gross MWe).............
947 5.
Design Electrical Rating (Net MWt).......
907 6.
Maximum Dependable capacity (Gross MWe):..
894 7.
Maalam Dependable Capacity (Wet MWe):....
648 8.
If changes occur in Capacity Ratings (Items No. 3 thru 7) since lent report, give reasons:_N/A 9.
Power level to which restricted, if any (Net MWe): _ N/A
.10. Reascos foe restrictions, if any:
N/A This Month Y t-D Cumalative
- 11. Hours i n R eport i ng P er i od................................
720.0 4,367.0 122,939.0
- 12. N w ber of Hours Reactc was Critical.....................
720.0 2,825.3 89,513.8
- 13. R eactor Reserve Shutduwn Hours..........................
0.0 16.3 6,758.0 14, Hours Generator 0n-Line..................................
720.0 2,808.2 86,579.7
- 15. Unit Reserve Shutdown Hours.............................,
0.0 0.0 0.0 t6.' Gross Thermal Energy Generated (MWM)..................... 1,977,122.3 7,548,196.3 230,500,968.7
- 17. Gross Elec triest Energy Generated (WH)..................
653,595.0 2.497,630.0 75,755,477.0
- 18. Wet Electrical Energy Generated (MWH)....................
620,740.0 2,372,086.0 71,726,703.0
- 19. Unit Service Factor......................................
100.0%
64.3%
70.4%
- 20. Uni t Aval t abi l i t y F act or................................
100.0%
64.3%
70.4%
- 21. Uni t Capaci ty Fac tor (asi ng MOC Net ).....................
101.7%
61.8%
65.2%
- 22. Uni t capaci ty F ac tor (using DER liet ).....................
95.1%
59.9%
64.3".
- 23. Forced Outage Rate.......................................
0.0%
0.0%
11.9%
- 26. shutdowns Scheduled over Next 6 Months (Type, Date, and Duration of Each)_ Steam Generator Replace.nent and Refueling Outage, January 1993, approximately 120 days.
- 25, if Shutdown at erd of Report Period, est(t.mted time of startup:
N/A
- 26. Units in Test stetus (Prior to Connercial Operation):
Forecast Achieved INITIAL CRITICALITY INillAL ELECTRICITY COMMERCIAL OPERATION l
4 l
B9 l-H:
L=
AVERAGE DAILY UNIT POWER LEVEL Dochet No.:
50-338 Unit NA-1 Date:
July 1, 1992 Contact G.
E.
Kane Phones (703) 894-2101 c-MONTH:
June 1992__
DAY AVERAGE DAILY POWER DAY AVERAGE DAILY LEVEL LEVEL (MWe-Net)
LEVEL (MWe-Net) 1 665 17 863 2
866 18 863 3
866 19 863 4
865 29 863 5
862
.1 863 6
863 22 863 7
865 23 864 8
864 24 863 9
864 25 863 10 864 26 863 11 863 27 845 12 862 28 847 13 864 29 861 14.
862 30 861 15 862 16 863 L
-Instructionst.
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
1 I
MU
-UNIT:SIlUTDOWNS AND POWER REDUCTIONS
_.i DOCKET NO.:
50-338 UNIT NAME:
NA-1 DATE: ' July 1, 1992 REPORT MONTH: June 1992 CONTACT:
G.
E. Kane PHONE: (703) 894-2101 1
2 3'
4 5
No.
Date Type Duration Reason Method of Licensee System Component Cause a Corrective (hrs)
Shutting Event Code Code Action to Down Reactor Report /
Prevent Recurrence cNo entry this month.
3: Method 4:
1: Type 2: Reason 1= Manual Exhibit F - Instructions F= Forced A= Equipment Failure-(explain) 2= Manual Scram for preparation of Data S= Scheduled B= Maintenance or Test 3= Automatic Scram Entry Sheets for Licensee C= Refueling 4= Continuations Event Report (LER) File D= Regulatory Restriction E= Operator Training & License Examination 5= Load Reduct.on (NUREG-0161)
F= Administrative 9=Other 5:
G= Operational Error Exhibit H - Same Source H=Other (explain)
~
Page 1
of __.1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.2 50-338 Report Month J_u.Dg Unit Names NA-1 Year 1992 Datet >1 illy 1.
1992
Contact:
G.
E.
Kane
- No entry this month.
l 4
NORTH ANNA POWER STATION T
cVNIT NO.5-1 NONTH:
June
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 1 Listed below _ in-chronological sequance is a
summary of operating experiences for this month which required load reductions "or resulted in significant non-load related incidents.
iDAIA TlRA Data j
June'01,fl992 0000 Began month with unit at 95%' power, 910MWe.
4 LJune105, 1992 0820 Commenced unit ramp-down to 870 MWe for TVFT.
i 0850 Unit stable at 870MWe for TVFT.
l-p 0939 TVFT completed satisfactorily.
0952 Commenced unit ramp-up to 95% power.
4 1020 Unit ctable at-95% power, 911MWe, June-30,1992 2400 Ended month with unit at 95% powel, 907Mwe.
- n Y
h i
i p
I fL i
I' i
OPERATIDG DATA REPC]f DOCKit No.:
50 339 DATE: July 1, 1992 CONTACT: G. E. Kane PHMin (TOI) 894 2101 OPiRAilWG SfAtus
- 1. Uni t N atw s................................ N or t h Anna 2 2.
Reporting Periods........................ June 1902 3.
Licensed thermal Power (MWt).............
2?.93 6.
Nameptste Pating (Cross MWe).............
947 5.
DentCn Electrical anting (Net We).
907
- 6. Caxina Deperdable Capacity (Gross MWe):..
957 7.
Caxinm DepMable Capacity (Wet MWe)....
909 8.
If changes occur in Capacity Ratings (itema No. 3 thru 7) ei-to.
enor t, g he reasons t,,,,,,,,,
N/A 9.
Power level to wh ch restricted, if any (Net MWe):
,,,,,,N / A
- 10. Reasons for restrictions, if any:
N/A this Month TtD r.unut stiu
- 91. Jours 4 Deporting Period...............................
720.0 4,367.0 101,297.0
- 12. kurter of Hours Reac t or was Cr i t i ca t.....................
720.0 7,9.3.9
!.2,649.8
- 13. Reactor meserve shutdown Hturs.....,.....................
0.C 164.9 6,222.3
- 14. N o'. e s Gener a t or 0n L i ne..................................
720.0 2,863.9 81,638.3
- 15. Lenit taserve Shutdown Hours..............................
0.0 0.0 0.0
- 16. Gross The rmal Energy Genera t ed (MW4).................... 2,081,745.0 7,716,503.2 219,533,636.3
- 17. Gross Electrical Energy Generated (MWH)..................
685,323.0 2,530,712.0 71,910,438.0 18.' Net Electrical Energy Generated (MWW)....................
651,452.0 2,.00,929,0 68,000,662.0
- 19. Uni t serv i c e f ac t or......................................
100.0%
45.6%
$0.7%
- 20. Unit Avaltability factor.................................
100.0%
65.4%
- 80.7%
- 31. Uni t capac ity f ac tor (us t ry,; MOC Net )...................
99.5%
60.5%
75.6%
- 22. Uni s epac i ty f actee # ming CER Net )....................
99.8%
60.6%
75.1%
- 23. F ore ed Cu 4 R e t e.............................
0.0%
0.9%
5.L%
2$. ShWdowns scheduled Over Next 6 Months (Type, Dete, and Duration of Each):,,_N/A
~--.
25.' If shutdevn at end of Report Period, citiested time of ttstup:,_ _,,N/A
- 26. Units in Test $tatus ('.)rior to Cornerclat Operation):
tcreenst L:hieved nNITIAL CRIT;CAllT1 INITI AL ELECT 21f.11Y C'HMERCIAL OPERAfl0N
=-
= _ _
s AVERAGE DAILY UNIT POWER LEVEL g
Dockot No.t 50-319
}
tinit t NA-2
}-
Date:
July 1.
1992
Contact:
J L__E. Ka.ie e_ - -
Phonat 129,21 894-2101 l'
MONTH:
June 199?u_
N
-DAY AVERAGE DM:,f POWER DhY AVEliAGE DAILY LEVEL LEVEL (MWe-Not)
LEVEL (MWa-Nat)
\\
1 9 0_B 17 906 2
909 18 90]
o 3
094 19 907 4
M99 20 905 5
907 21 905 6
906 22
.905 7
2,07 23 906 8
9 0 Q_,,,,, _
24
,,_,_2 0 5 9
905 25 905 10 905 26
$89 11 9Q7 27
,_,,_RD,5 12
,___,.208 2C 905
^
13 908 29 905 l-14
_,%9]
30 904 a
15 905 16 907 4
Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt, t
_______._-___m-_______._____n-
-..o
7 UNITISHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
50-339 UNIT NAME:
NA-2 DATE: July 1, 1992 REPORT MONTH: June ~1992 CONTACT: G. E.
Kane FHONE: (703) 894-2101 1
2 3
4 5
.No.
Date Type Duraticn Reason Method-of Licensee System Component Cause & Corrective
-(hrs)
Shutting.
Event Code Code Action to Down Reactor Report #
Prevent Recurrence ONo entry this month.
1: Type 2: Reason (explain) 1= Manual Exhibit F - Instructions 3: Method 4:
.F= Forced
'A= Equipment Failure S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram
%try Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-Ol61)
F= Administrative 9=Other C= Operational Error 5:
H=Other (explain)
Exhibit H - Same Source V
3 T
~ " -
- 3
- ~
v Paga _ 1_,_
of _,,,1 l
UNIT DEUTDOWN AND POWER REDUCTIOND
-Explanation Sheet Dockst No.:
B0-339 Report Month J_Ung Unit Names NA-2 Years 1992 De.t e t July 1.
1992 Contact G.
E.
Kane
!!o entry this month.
I i
i 1
i l
i e
" 4 4
w e em+e wd e,-g-w en-U-t-@
gm wi sf
- -, - + 's r+
ww-i W--w-W'-
rr
-1
-p.
e
- - ~ - - -
5-y--
w sip 1*'4Y
NORT.4 ANNA PODER STATION UNIT NO.1 2
MONTH:
_ June._,
SIMMARY of__QP3 RATING.IKPIBLCHRE Page 1 of 1 Listed below in chronological sequence is a
summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
RRit TlRR DDAR June 01, 1992 0000 Began month with unit at 100% power, 954MWo.
June 26, 1992 0900 Communced unit ramp-down to 880MWe for TVFT.
0953 Unit stable at 878MWe for TVFT.
1331 TVFT completed satisfactorily and commenced unit ramp-up to 100%
power.
1720 Unit stable at 100% power, 952MWo.
June 30, 1992 2400 Ended month with unit at 100% power, l
953MWe.
1 l