ML20101R128
| ML20101R128 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 04/03/1996 |
| From: | Tuckman M DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9604160066 | |
| Download: ML20101R128 (2) | |
Text
ll I
DukeIbwer Company yS m 0arlotte, N 28201 1006 ar
~
(7&l)382-22000mce (704)3824360 Fax e--
April 3, 1996 1
U. S. Nuclear. Regulatory Commission Washington, D. C. 20555-Attention: Document Control Desk i
Subject:
Catawba Nuclear Station Docket Numbers 50-413 and -414 Technical Specification Revision to Implement Revised 10
]
i CFR 50 Appendix J; Supplement By letter dated January 12, 1996, Duke Power requested a change j
[
to Technical Specification 4. 6.1.2, to incorporate new i
regulations relative to containment leakrate testing.
Included in that request was the deletion of a footnote relative to an l
exemption to defer an upcoming Unit 1 test.
This proposed change l
should have also requested the deletion of a similar footnote
-applicable to Unit 2.
Therefore, the sentences at the bottom of l
page 1, Attachment II, of the January 12, 1996 letter should have
)
i
- read, "A footnote at the bottom of page 3/4 6-3, which refers to the deferral of CLRTs for Catawba Units 1 and 2, is. deleted. With the approval of this proposed amendment, these tests will become unnecessary."
i If any additional information is required, please call Scott Gewehr at (704) 382-7581.-
, S.
l M. S. Tuckman i
UOOjz 9604160066 960403 kh D
PDR ADOCK 05000413 k
p PDR a
won evemma
ll..-
i i
U.
S.* Nuclear Regulatory Commission April 3, 1996 Page 2 cc:
Mr. R.
E. Martin, Project Manager i
Office of Nuclear Reactor Regulation U.
S. Nuclear Regulatory Commission l
Mail Stop 14H25, OWFN Washington, D.
C.
20555 l
l Mr.
S.
D.
Ebneter, Regional Administrator U.S. Nuclear Regulatory Commission - Region II 101 Marietta Street, NW - Suite 2900 Atlanta, Georgia 30323 l
R.
J. Freudenberger Senior Resident Inspector Catawba Nuclear Station l
l I
l f
l l
l l-
- -