Text
,
=
?,.
/p **% og L'
~
.E NUCLEAR REGULATORY COMMISSION UNITED STATES n
i 3
[
WASHINoTON. D.Ci 20556 =
\\....+/
h.
PHILADELPHIA ELECTRIC COMPANY i
Pil8LIC SERVICE ELECTRIC AND GAS COMPANY
[.
DELMARVA POWER AND LIGHT COMPANY-i ATLANTJC CITY ELECTRIC COMPANY i
DOCKET N0. 50-2]l l-PEACH BOTTOM ATOMIC POWER STATION. UNIT N0. 2
.AjiENDMENT TO FACIllTY OPERATING LICENSE-p j
Amendment No. 168' License No.-DPR-44 4
1.
The Nuclear Regulatory Commission (the Commission) has found that:
4 A.
The application-for amendment by Philadelphia Electric Company, et.
al. (the licensee) dated January-31,1992,.as supplemented by letters l
dated April.28,'1992 and June 22, 1992,' complies with the standards and requirements of the Atomic Energy Act of 1954. as' amended (the-Act;, and the Commission's rules-and regulations et forth:in 10 CFR Chapter I.
B.
The facility will-operate in conformity with the application, the-provisions of the Act, and the rules.and regulations; of the
.Ccmmission; C-There is reasonable assurance-(i) that the' activities authorized:by this amendment can be-conducted.without endangering the: heal _th and.
safety of the public, and-(ii) that.such activities:will be-conducted
[
in compliance with the Commission's regulations; D.
The issuance' of this amendment will:not' be inimical to the common:
defense and security.or to the-health or_ safety of the public; and-l
- E. - The issuance of this amendment is in accordance.with IF CFR Part. 51 of -
the Commission'sl regulations and Lall-applicable requirements-have: been
~
n
= satisfied.
4 l
24 Accordingly, the-license is'amendedLby changes to the Technical
~
Specifications.as-indicated -in the' attachment to this license amendment, i
and paragraph 2.C(2).of, Facility Operating License:Nof DPR-44 is hereby:
i amended toiread as follows:
1-r i
9207100102 920706 PDR_.-ADOCK 05000277 l.
.P PDR
l t
- l (2) Technical Specifications The Technical Specifications contained.in Appendices A and B, as revised through Amandment No.168, are hereby incorporated in the license.
PECO shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION C.
Y 6
Charles L. Miller, Director Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
July 6. 1992 4
4.
)
d W
e e
w me e
r
.v-
ATTACHMENT TO LICENSE AMENDMENT NO.168 FACILITY OP_ERATING LICENSE NO. DPR-44 QOCKET NO. 50-277 Replace the following pages of the Appendix A Technical Specifications with 1
the enclosed page.
The revised areas are indicated by marginal lines.
Remove Insert 132 132 s
4 e
e uan -
4 -
W,..
.r. i t 2 LIMITING CON 0!TIONS 10R Oktkeu:u..
SURVEILLANCE'RE00fREMENTS-3.5.F Minimum tow Pressure Cooling 4.5.F Minimum low Pressure-and Diesel Generator Cooling and Diesel Availability Generator Availability 1.
During any period when one 1.
If a diesel generator becomes diesel generator is inoper-inoperable for any reason other
~
able, continued reactor opera--
'than preplanned preventativez tion is permissible only maintenance or testing, the operable-4 during the succeeding seven
-diesel generators shall be l
days unless such diesel gene-demonstrated to be operable retor is sooner made operable immediately and daily provided that the remaining thereafter.
diesel generators and the low pressure core and containment cooling systems r
i which are powered
[
by the remaining diesel' i
generators are operable.
If_this requirement cannot i
be_ met. an orderly shutdown
+
shall be initiated and the reactor shall be placed in 1
the Cold Shutdown Condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
i
?.
Any combination of inoperable 5
components in the core and containment cooling systems shall not defeat the capability of the remaining operable components to t~ulfill the cooling functions, i
3.
When irradiated fuel is in the reactor-vessel and the reactor is in the Cold Shutdown Condition, I
both core spray' systems, the LPCI i
and containment cooling systems j
may be inoperable, provided no
-work-is being done which has the potential for draining the reactor vessel.
l
~
4.
During a refueling outage, 4
fuel and.LPRM removal and replacement may be performed h
provided at least one of the followir.g conditions below is satisfied:
Amendment No. 168 I
{
l' i
l
~ _ _,.. ~. _,
a.
g' " %<y
+
2' \\
UNITED STATES 3, 'E i
NUCLEAR REGULATORY COMMIS310N
[
WASHINGTON, O C. 20%5 o%, v f PHILADELPHIA ELECTRIC COMPANY EWLIC SERVICE ELECTRIC AND GAS COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-278 P:ACH BOTTOM ATOMIC POWER STA110N. UNIT Q. 3 AMENDMENT TO FACIllTY OPERATING llCENSE Amendment No. 172 License No. DPR-56 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Philadelphia Electric Compann at.
al. (the licensee) dated January 31, 1992, as supplemented b; aters dated April 28, 1992 and June 22, 1992, complies with tne sta:Mards and requirements of the Atomic Energy Act of 1954, as amended (ine Act), and the Commission's rules and regulations set forth in 10 CFR Chapter 1.
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this-amendment will not be inimical to the common defense and security or to the health or safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended bj changes to the Technical Specifications as indicated in the atte.hment to this license amendment, m
and paragraph 2.C(2) of Facility Ope > <.mg License No. DPR-56 is hereby amended to read as follows:
i 4
4 (2) Technical Soecifiq)t_ipu The Technical Specifications contained in Appendices A and B, as revised through Amendment No.172, are hereby incorporated in the license.
PECO shall operate the facility in accordance with the Technical Specifications.
k j
3.
This license amendment is effective as of its date of issuance.
]
FOR THE NUCLEAR REGULATORY COMMISSION cAcA d %
i
~
Charles L. Miller, Director Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: July 6. 1992 e
I e
i 4
e ATTACHMENT TO LICENSE AMENDMENT NO.172 FACILITY OPERATING LICENSE NO. DPR-!.i i
DOCKET NO. 50-?78.
Replace the following pages of the Appendix A Technical Specifications with i
ihe enclosed page.
The revised areas are indicated by marginal lines.
l Remove Insert 132 132 l
l l
i l
l
... ~
%.a a
. n t i..
LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS-3.5.F_ Minimum Low Pressure Cooling 4.5.F. Minimum low Pressure and Diesel Generator Cooling and Diesel Availaoility Gen ator Availability i
1.
During any period when one 1.
If a diesel generator becomes
~
4 diesel generator is inoper-inoperable for any reason other able, continued reactor opera-than preplanned preventative tion is permissible only maintenance or testing, the operable i
during the succeeding seven_
diesel generators shall be days unless such diesel gene-demonstrated to be operable S
4 rator is sooner made operable immediately and daily provided that the remaining thereafter.
diesel generators and the low pressure core and containment cooling systems 1
t-which are powered i
by the remaining diesel generators are operable.
?
If this requirement cannot 3
be met, an orderly shutdown i
shall be initiated and the
}
reactor shall be placed in 1
the Cold Shutdown Condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
2.
Any combination of inoperable components in the core and containment i
cooling systems shall not defeat-l the capability.of the remaining j
operable components to fulfill i
the cooling functions.
J i
3.
When irradiated fuel is in the reactor vessel.and the reactor 1
is in the Cold Shutdown Condition, j.
both core spray systems, the LPCI and containment cooling-systems may be inoperable, provided no-work is being done which has the potential for draining the reactor vessel.
1 4.
During a refueling-outage, fuel and LPRM removal and
+
4-replacement may be performed 4
provided at least one of the following conditions below is satisfied:
A 4
1 Amendment No.172 132-i
=
f 4
---,m.